Package No.16 Seblat-Ipuh AWP-3

Western I ndonesia National Roads I mprovement Project 1 - 8 Rp. 113,818,300,000 which is 13.32 below the approved Owner s Estimate OE of Rp. 131,302,200,000 while the 2 nd lowest bid is quoted by PT. PT. Conbloc Infratechno Statika, KSO Joint Operation with an amount of Rp. 118,172,039,000 or 10.00 lower than the Owner s Estimate. During this reporting month March 2016 Bid Evaluation Report BER and recommendation for award of contract has been finalized and completed by the Procurement Committee POKJA recommending the award of contract to the evaluated lowest responsive bidder, PT. Nindya Karya Persero Tbk, for a corrected contract amount of Rp.113,818,304,610. The Bid Evaluation Report BER as well as the recommendation for award of contract has been forwarded on March 21, 2016 to World Bank for Bank s concurrence and issuance of No Objection Letter NOL and by March 23, 2016, NOL was issued.

7. Package No.21 Lubuk Alung - Kuraitaji AWP-3

The sub-project is to be implemented under implementation schedule AWP-3. The Project road lenght covers 16.80 kilometers and is located in the Province of West Sumatera. The Contract Package is procured thru post qualification criteria and National Competitive Bidding NCB using the Full e-Procurement System. As mentioned earlier, there were eight 8 applicant bidders 7 sole entity and 1 joint venture operation who submitted bids for the civil works implementation. Following are the eight 8 bidders with their respective bid prices : • PT. Multi Structure Rp. 126,301,991,200 • PT. Adhi Karya Rp. 133,638,300,000 • PT. Nindya Karya Rp. 141,465,600,000 • Pan Asia Corporation Rp. 143,186,229,000 • PT. Conbloc Infratechno Statika, KSO Rp. 143,227,420,000 • PT. Jaya Konstruksi M,P Rp. 147,718,199,000 • PT. Waskita Karya Rp. 150,966,239,000 • PT. PP Rp. 154,124,000,000 The lowest canvassed bid is submitted by PT. Multi Structure with an amount of Rp. 126,301,991,200 which is 23.28 below the approved Owner s Estimate OE of Rp. 164,692,268,000 while the 2 nd lowest bid is quoted by PT. Adhi Karya with an amount of Rp. 133,638,300,000 or 18.82 lower than the Owner s Estimate. During this reporting month March 2016 Bid Evaluation Report BER and recommendation for award of contract has been finalized and completed by the Procurement Committee POKJA recommending the award of contract to the evaluated lowest responsive bidder, PT. Multi Structure, for a corrected contract amount of Rp.126,301,991,202. The Bid Evaluation Report BER as well as the recommendation for award of contract has been forwarded on March 21, 2016 to World Bank for Bank s concurrence and issuance of No Objection Letter NOL and by March 23, 2016, NOL was issued. Western I ndonesia National Roads I mprovement Project 1 - 9 1.5 Procurement of Three 3 Consultancy Packages Under Category 3 of the Loan Agreement, Part 3: Road Sector Institutional Development

1. Technical Assistance for Capacity Building for Disaster Risk Reduction

The Technical Assistance for Disaster Risk Reduction was canceled based on the results of meeting between DGH and the WB on October 12, 2015. It was decided to cancel the Technical Assistance and to be replaced by a Technical Assistance for Study on Slope Stabilization Design and Management under Loan Category-2. Term of Reference TOR has already been finalized and submitted to World Bank for concurrence prior to publication on PU Website for Request of Expression of Interest REOI from interested consulting firms.

2. Technical Assistance for Capacity Building for Environmental Management

Cancelled.

3. Technical Assistance for Capacity Building for Road Safety

Cancelled.