91.62 WINRIP DOC MPR CTC MPR No.39 2016 3 20160331 00359

Western I ndonesia National Roads I mprovement Project 4 - 6 elapsed and based on the Contractor s performance and average progress per month during the past 13 months, completion date on June 2, 2016 is not possible. The major work item which conributed to the huge negative slippage is the Aspahalt Pavement. To date only 9.10 out of the 70.65 component of whole works has been accomplished. However, in the event that the recently concluded Field Engineering results with proposed 90 calendar days time extension will be formally approved, the completion date will be moved forward to August 31, 2016. ANNEX P-6 Executive Summary Report shows the complete details of the contract package. Package No. 7: Indrapura Tapan The contract package just recently commenced on December 10, 2016. During the period from the issuance of Notice To Proceed NTP until end of this month, Contractor concentrated on the preparation for mobilization at site and finalization of the Field Engineering. During the period only small percentages of the General, Structure and Routine Maintenance works have been done accumulating to just 0.14 progress for the whole month ANNEX P-7 Executive Summary Report shows the complete details of the contract package. Package No. 8 : Bts. Kota Pariaman - Manggopoh Notice To Proceed NTP to commence the works has been issued on March 23, 2016. At the time of the preparation of this Report, there is still no work schedule S-Curve submitted by the Contractor. Package No. 11 : Bantal - Mukomuko Based on the revised schedule due to approval of the results of Field Engineering , the actual overall progress attained by the Contractor up to end of this period is 38.87 against 43.85. At the end of the 13 th month of the contract period, Contractor s performance with respect to their work progress seem to be satisfactory as the negative slippage have been minimized to a single digit. In other words, the Contractor have no difficulty in completing the works on or before the target date completion February 11, 2017. For more details of the Contract Package, refer to ANNEX P-11 Executive Summary Report . Package No. 13 : Sp. Rukis Tj. Kemuning The current work progress showed sign of slowing down for the past three 3 months as only 0.24 progress has been achieved during this period. At the end of the month, the overall work accomplished is 14.62 of the 26.94 schedule at month s end. The negative slippage suddenly dropped from -5.99 in the preceeding month to -12.32 this month. The negative slippage is still manageable at the moment, provided the Contractor will take immediate actions on problems that are hampering the work progress. Barring any unforseen circumstances that will disrupt or interrupt the construction implementation, it is expected that the project can be completed on- time or even ahead of the schedule.