Detailed Design Preparation WINRIP DOC MPR CTC MPR No.39 2016 3 20160331 00359

Western I ndonesia National Roads I mprovement Project 4 - 3

4.4 Civil Works Progress

Activities done during this month were repair and restoration of deteriorated existing pavements, roadway excavation, embankment formation, spreading of granular pavement for roadway widening, asphalt paving, structural works, construction of stone masonry side ditches, stockpiling of raw material, production of crush aggregates, other minor works, bridge construction and finalization of Field Engineering surveys. The four 4 contract packages under implementation program AWP-1 were not completed on the original target dates of completion, however, time extensions ranging from 15 to 125 calendar days were granted extending the completion dates at the earliest on January 10, 2016 and the latest on April 19, 2016. Physically, two 2 of the contract packages has already been fully completed and recently handed and taken over by the Client, while the two 2 other packages are about to be completed next month April 2016. Under the implementation program AWP-2 and AWP-3, there are currently eight 8 contract packages that are on-going construction implementation and one 1 contract package have just been issued Notice To Proceed NTP to commence works. Physical progress of two 2 of the packages are lagging far behind schedule with negative slippages of -42.77 and -57.81 while progress for the other six 6 packages are still slightly on or behind schedule. Generally, with the exception of the two 2 contract packages with huge negative slippages, the civil works implementation is fairly in the right direction. Progress status of the thirteen 13 on-going civil works contracts as of this reporting period are shown in Table 4.2. Following are brief status of the Thirteen 13 on-going construction contract packages : Package No. 1 : Biha Krui The contract package is substantially completed on January 20, 2016 and provisionally handed over to the Employeer. Taking Over Certificate of the Works has been issued by the Engineer on the same day of the Provisional Hand Over PHO which is also the starting date for Defects Notification Period until after two 2 years reckoned from the issuance of the TOC. A more detailed previous status of this Package is presented in ANNEX P-I Executive Summary Report. Package No. 2 : Padang Sawah Sp. Empat Including Air Gadang Bridge As the end of this reporting period, the overall work progress based on the revised schedule is 96.83 with at least 3 of the works still to be done until the revised expiry of the completion time. To date, the remaining 25 calendar days left from the revised extended construction period is more than enough for the Contractor to complete the remaining works until the revised take over date on April 19, 2016, but this will depend with the progress and completion of Air Gadang Bridge. With regard to the construction of Air Gadang Bridge, all the 20 pre-cast girders required were launched in place and two 2 spans out of the four 4 spans of bridge deck has been casted during the month of March 2016. Construction of approach roads are also on-going during the period. ANNEX P-2 Executive Summary Report present a more detailed status of the Contract Package.