Monitoring Report of the LARAP Package No. 12 Monitoring Report of the LARAP Package No. 13
17. Monitoring Report of the LARAP Package No.17
: Sp. Gunung Kemala Pg. Tampak Province : Lampung A. Previous Status : • World Bank approved the corrected LARAP documents on November 12, 2013 • Monitoring report for 154 of the total 2.273 PAPs was given No Objection Letter NOL on October 13, 2015. • Monitoring report for 735 of the remaining 2.119 PAPs was given No Objection Letter NOL on November 26, 2015 B. Pending Issues, Concern and Actions a No issue this period. A. Update during this reporting month of March 2016 a Monitoring Report for the compensation payments for the remaining 1.384 PAPs has been issued No Objection Letter NOL on March 16, 2016 by the World Bank. b PMUCTC waiting data of payment progress for the remaining of 1.384 PAPs from Satker PJN II Lampung. c Total PAP = 2,273 ; Compensated = 2,273 ; Percent complete = 100.18. Monitoring Report of the LARAP Package No.18
: Mukomuko Bts. Sumbar Province : Bengkulu Cancelled from the WINRIP Program.19. Monitoring Report of the LARAP Package No.19
: Lais - Bintunan Province : Bengkulu B. Previous Status : • World Bank issued on May 30, 2014 No Objection Letter NOL on the revised LARAP documents for implementation • World Bank issued No Objection Letter NOL on Monitoring Report No.1 for the LARAP implementation. • Monitoring report for 208 of the remaining 290 PAPs was given No Objection Letter NOL on November 26, 2015. C. Pending Issues, Concern and Actions a Monitoring Report for payment of compensation to the remaining 82 PAPs still to be prepared for submission to World Bank. b Certification process for 136 plots still to be finalized. D. Update during this reporting month of March 2016 a PMUCTC waiting data of payment progress for the remaining of 82 PAPs from Satker PJN I Bengkulu. b Total PAP = 556 ; Compensated = 556 ; Percent complete = 100.Parts
» WINRIP DOC MPR CTC MPR No.39 2016 3 20160331 00359
» Current Implementation Situation Civil Works
» Disbursement WINRIP DOC MPR CTC MPR No.39 2016 3 20160331 00359
» World Bank Implementation Review Mission and Site Visit
» Package No.8 Bts. Kota Pariaman - Manggopoh AWP-2
» Package No.12 Kambang - Indrapura AWP-2
» Package No.16 Seblat-Ipuh AWP-3
» Package No.14 Painan - Kambang AWP-3 Package No.20 Lubuk Alung - Sicincin AWP-3
» Package No.21 Lubuk Alung - Kuraitaji AWP-3
» Technical Assistance for Capacity Building for Disaster Risk Reduction
» Technical Assistance for Capacity Building for Environmental Management
» Technical Assistance for Capacity Building for Road Safety
» Background WINRIP DOC MPR CTC MPR No.39 2016 3 20160331 00359
» Project Development WINRIP DOC MPR CTC MPR No.39 2016 3 20160331 00359
» Project Objective WINRIP DOC MPR CTC MPR No.39 2016 3 20160331 00359
» CTC Consultants WINRIP DOC MPR CTC MPR No.39 2016 3 20160331 00359
» DSC Consultants WINRIP DOC MPR CTC MPR No.39 2016 3 20160331 00359
» Technical Assistance for Capacity Building for Disaster Risks Reduction
» Detailed Design Preparation WINRIP DOC MPR CTC MPR No.39 2016 3 20160331 00359
» Procurements WINRIP DOC MPR CTC MPR No.39 2016 3 20160331 00359
» Civil Works Implementation WINRIP DOC MPR CTC MPR No.39 2016 3 20160331 00359
» Civil Works Progress WINRIP DOC MPR CTC MPR No.39 2016 3 20160331 00359
» 96.83 WINRIP DOC MPR CTC MPR No.39 2016 3 20160331 00359
» 91.62 WINRIP DOC MPR CTC MPR No.39 2016 3 20160331 00359
» 10.11 WINRIP DOC MPR CTC MPR No.39 2016 3 20160331 00359
» 27.55 WINRIP DOC MPR CTC MPR No.39 2016 3 20160331 00359
» -4.98 WINRIP DOC MPR CTC MPR No.39 2016 3 20160331 00359
» 323 CD WINRIP DOC MPR CTC MPR No.39 2016 3 20160331 00359
» 14.62 1.69 WINRIP DOC MPR CTC MPR No.39 2016 3 20160331 00359
» 6.16 WINRIP DOC MPR CTC MPR No.39 2016 3 20160331 00359
» 80.78 WINRIP DOC MPR CTC MPR No.39 2016 3 20160331 00359
» Quality Assurance WINRIP DOC MPR CTC MPR No.39 2016 3 20160331 00359
» Environmental Quarterly Report Socialization of HIV-AIDs Campaign
» Monitoring Report of the LARAP Package No. 1
» Monitoring Report of the LARAP Package No. 2
» Monitoring Report of the LARAP Package No. 3
» Monitoring Report of the LARAP Package No. 4
» Monitoring Report of the LARAP Package No. 5
» Monitoring Report of the LARAP Package No. 6
» Monitoring Report of the LARAP Package No. 7
» Monitoring Report of the LARAP Package No. 8
» Monitoring Report of the LARAP Package No. 9
» Monitoring Report of the LARAP Package No. 10
» Monitoring Report of the LARAP Package No. 11
» Monitoring Report of the LARAP Package No. 12 Monitoring Report of the LARAP Package No. 13
» Monitoring Report of the LARAP Package No. 14
» Monitoring Report of the LARAP Package No. 15
» Monitoring Report of the LARAP Package No.16
» Monitoring Report of the LARAP Package No.17
» Monitoring Report of the LARAP Package No.18
» Monitoring Report of the LARAP Package No.19
» Monitoring Report of the LARAP Package No. 20
» Monitoring Report of the LARAP Package No. 21
» Anti Corruption Issues WINRIP DOC MPR CTC MPR No.39 2016 3 20160331 00359
» Road Safety Audit WINRIP DOC MPR CTC MPR No.39 2016 3 20160331 00359
» Letter Database System, used to record all information of incoming and
» Document Library System, used to record all information of document and
» World Bank and GOI Compliance
» Implementation Support Components WINRIP DOC MPR CTC MPR No.39 2016 3 20160331 00359
» TRAINING TO SUPPORT PROJECT IMPLEMENTATION
Show more