Lost 1 blow due to inspect w ire w asher 1 w ashing Lost 1 cook due to Mech change gasket outlet blow valve dig5 1.0 0.12 3.72

xxii 1-Mar-16 48 0.0 - 2-Mar-16 47 0.83 0.8 lost 1 blow due to shuttle conveyor 411M-101 problem 3-Mar-16 48 0.0 - 4-Mar-16 39 3.57 3.6 Lost 9 blow due to accumulator foaming 5-Mar-16 47 0.50 0.5 Lost 1 blow due to digester delay blow ing mech changed gasket safety valve blow tankB 6-Mar-16 48 0.0 - 7-Mar-16 47 1.00

1.0 Lost 1 blow due to digester 5 under mechanic.

8-Mar-16 43 1.67 1.7 Lost 5 blow s cooking time is long H factor 2500 and blow tank high level 9-Mar-16 47 0.50 0.5 lost 1 blow due to blow tank high level 10-Mar-16 38 0.0 Lost 10 blow s due to digester stop cooking Washing plant problem 11-Mar-16 47 1.17 1.2 Lost 1 blow due to mechanic changed gasket bottom liq.heater. 12-Mar-16 44 1.50 1.5 Lost 1 blow due to Mech changed gasket bottom liq.heater dig13 lost 3 blow due to blow tank high level . 13-Mar-16 35 0.0 Lost 13 blow s due to digester stop cooking Washing Plant problem 14-Mar-16 48

0.0 -

15-Mar-16 47 0.42 0.4 Lost 1 blow due to Mech changed gasket flange of Accumulator seal tank 16-Mar-16 48 0.0 - 17-Mar-16 47 0.7

0.7 Lost 1 blow due to chip filling plug up

18-Mar-16 42 0.33 1.75 2.1 Lost 1 blow due to dig15 cooking BL and lost 5 blow s due to Unbleach high level 19-Mar-16 42 3.17 3.2 Lost 6 blow s due to BT high level Bleaching stop due to D0 MC Pump motor high temp 20-Mar-16 47 0.67 0.7 Lost 1 blow due to Liquor charge valve dig3 cant close 21-Mar-16 48 0.0 - 22-Mar-16 48 0.0 - 23-Mar-16 48 0.0 - 24-Mar-16 47 0.33

0.3 Lost 1 blow due to inspect w ire w asher 1 w ashing

25-Mar-16 48 0.0 - 26-Mar-16 47 0.67

0.7 Lost 1 cook due to Mech change gasket outlet blow valve dig5

27-Mar-16 45 1.83 1.8 Lost 3 Cooks due to Unbleach high level 28-Mar-16 41 0.42 2.08 2.5 Lost 5 Blow s due to WBL high level change throw ing roll, lost 2 blow s due to screening high current 29-Mar-16 38 0.50 0.5 Lost 9 blow s due to BT high level BSW stopped and lost 1 blow due to interruption MP steam from turbine 30-Mar-16 47 0.50 0.5 Lost 1 blow due to interruption at MP steam supply from turbine 31-Mar-16 47 1.83

1.8 Lost 1 blow due change circ pump dig15

Total 1403

8.7 14.1

1.3 0.0

0.8 1.0

25.9 1.24

2.02 0.19

0.00 0.12

0.14 3.72

FIBER LINE DOWN TIME MARCH 2016 DATE D ig est er co o ks DIGESTER PLANT DOWNTIME MARCH 2016 Remarks UNPLANNED DOWNTIME T o ta l U n p la n n e d D o w n ti m e T o ta l P la n n e d D o w n ti m e P ro cess M ech an ical In s tr u m e n t H yd rau li c E lect ri cal O th e rs 2.08 5.55 Dow ntim e 1.46

2.50 10.1

Universitas Sumatera Utara xxiii 1-Apr-16 46 3.23 0.67 3.9 Lost 1 blow due to blow valve dig11 repaired by Inst, lost 1 blow due to dig14 fill up w ith BL 2-Apr-16 47 1.00 1.0 Lost 1 blow due to Fab w elding dig03 bathing steam flange 3-Apr-16 48 0.0

Dokumen yang terkait

Studi Kasus Audit Maintenance Rotating Equipmen,Pada PT. Toba Pulp Lestari, Tbk “Porsea” Medan

4 58 107

Studi Kasus Audit Maintenance Rotating Equipment Pada PT. Toba Pulp Lestari, Tbk, “Porsea”, Medan

9 109 107

Study Peningkatan Overall Equipment Effectiveness Melalui Penerapan Total Productive Maintenance Di PTPN IV PKS Pasir Mandoge

19 90 160

Usulan Perbaikan Efektivitas Mesin Dengan Menggunakan Metode Overall Equipment Efectiveness Sebagai Dasar Penerapan Total Productive Maintenance Di PT. Wika

6 57 150

Analisa Total Productive Maintenance Pada Mesin Thermoforming Dengan Menggunakan Metode Overall Equipment Effectiveness (OEE) di PT. Tirta Sibayakindo (TSI)

10 85 86

LAPORAN TUGAS AKHIR ANALISIS TOTAL PRODUCTIVE MAINTENANCE ANALISIS TOTAL PRODUCTIVE MAINTENANCE PENINGKATAN EFISIENSI PRODUKSI MESIN B-3 MELALUI OVERALL EQUIPMENT EFFECTIVENEES (OEE)(Study kasus : PT. Hartono Istana Teknologi).

6 15 14

Analisa Total Productive Maintenance Pada Mesin Thermoforming Dengan Menggunakan Metode Overall Equipment Effectiveness (OEE) di PT. Tirta Sibayakindo (TSI)

0 0 9

Analisa Total Productive Maintenance Pada Mesin Thermoforming Dengan Menggunakan Metode Overall Equipment Effectiveness (OEE) di PT. Tirta Sibayakindo (TSI)

0 0 2

Analisa Total Productive Maintenance Pada Mesin Thermoforming Dengan Menggunakan Metode Overall Equipment Effectiveness (OEE) di PT. Tirta Sibayakindo (TSI)

0 0 4

Analisa Total Productive Maintenance Pada Mesin Thermoforming Dengan Menggunakan Metode Overall Equipment Effectiveness (OEE) di PT. Tirta Sibayakindo (TSI)

0 0 9