0.29 0.13 0.20 2.0 0.43 1.92 Lost 1 blow due to chip filling plug up

xx 1-Jan-16 48 0.0 - 2-Jan-16 46 0.0 Digester delay chip filling due to shuttle conveyor plug up Loss 2 Blow s 3-Jan-16 48 0.0 - 4-Jan-16 45 3.00 3.0 Mech changed rubber gasket top cover dig5, Mech changed rotor circ.pump dig10, Mech repair chain cross conveyor. Loss 3 Cooks 5-Jan-16 46 0.0 Loss 2 blow s due to WBL high level 6-Jan-16 42 1.53 1.5 Digester delay chip filling due to chain of cross conveyor damage Loss 6 blow s 7-Jan-16 44 0.0 Loss 4 blow s due to WBL high level 8-Jan-16 45 0.0 Loss 3 blow s due to WBL high level 9-Jan-16 43 0.0 Loss 5 blow s due to WBL high level 10-Jan-16 43 0.0 Loss 5 blow s due to WBL high level 11-Jan-16 43 0.0 Loss 5 blow s due to WBL high level 12-Jan-16 43 0.0 Loss 5 blow s due to WBL high level 13-Jan-16 31 0.0 Loss 17 blow s due to Blow tank High level 14-Jan-16 36 0.0 Loss 12 blow s due to Blow tank High level 15-Jan-16 48 0.0 - 16-Jan-16 32 0.0 Loss 16 blow s due to Unbleach High level 17-Jan-16 27 0.0 Loss 21 blow s due to Unbleach High level 18-Jan-16 47 1.00 1.0 Loss 1 Blow due to blow ing delay Pressure CNCG to Incinerator Problem 19-Jan-16 47 0.0 Loss 1 blow due to steam from turbin shortage 20-Jan-16 47 0.83 0.8 Loss 1 blow due to chip filling delay stocker 56 78 Problem 21-Jan-16 45 0.0 Loss 3 blow s due to Blow tank high level 22-Jan-16 44 0.0 Loss 4 blow s due to pow er shortage 23-Jan-16 45 1.00 1.0 Loss 3 blow s due to Blow tank high level , Loss 1 blow Mech changed gasket outlet blow valve dig10. 24-Jan-16 46

0.0 Loss 2 blow s due to Blow tank high level.

25-Jan-16 38 0.0 Loss 10 blow s due to Washing plant stoped 26-Jan-16 48 0.0 - 27-Jan-16 45 0.0 Loss 3 blow s due to Blow tank is high . 28-Jan-16 46 0.67

0.7 Loss 2 blow s due to dig delay chips filling Flow chips less

29-Jan-16 45 1.50 1.5 Loss 3 blow s due to Digester 2 reduce pressure w hen PHK stage. 30-Jan-16 44 1.50

1.5 Loss 4 blow s due to Shuttle conveyor 411M-102 problem and repaired by electrik .

31-Jan-16 12

0.0 Loss 36 blow s due to preparation for RB shut dow n

Total 1309

2.2 5.5

1.0 0.8

1.5 0.0

11.0 0.29

0.74 0.13

0.11 0.20

0.00 1.48

FIBER LINE DOWN TIME JANUARY 2016 DATE D ig est er co o ks DIGESTER PLANT DOWNTIME JANUARY 2016 Remarks UNPLANNED DOWNTIME T o ta l U n p la n n e d D o w n ti m e T o ta l P la n n e d D o w n ti m e P ro cess M ech an ical In s tr u m e n t H yd rau li c E lect ri cal O th e rs 0.75 0.75 1.00 Dow ntim e 2.74 3.92

14.00 20.4

Universitas Sumatera Utara xxi 1-Feb-16 3 0.0 Loss 45 blow s due to RB shut dow n 2-Feb-16 37 0.0 Loss 11 blow s due to digester slow cooking RB start up 3-Feb-16 37 0.0 Loss 11 blow s due to digester stop cooking Washing problem 4-Feb-16 46 0.0 Loss 2 blow s due to Blow tank high level 5-Feb-16 48 0.0 - 6-Feb-16 35 0.0 Loss 13 blow s due to WBL high level 7-Feb-16 45 0.0 Loss 3 blow s due to WBL high level 8-Feb-16 43 0.0 Loss 5 blow s due to WBL high level 9-Feb-16 45 0.0 Loss 3 blow s due to WBL high level 10-Feb-16 45 0.0 Loss 3 blow s due to WBL high level 11-Feb-16 45 0.0 Loss 3 blow s due to WBL high level 12-Feb-16 44 3.00 3.0 Loss 2 Blow s due to WBL High level 2 Blow Dig delay chips filling due to shuttle conveyor problem. 13-Feb-16 48 0.0 - 14-Feb-16 46 1.60

1.6 Loss 2 Mech WPP Patching belt main conveyor 411M-110

15-Feb-16 46 0.0 Loss 2 blow s due to WL limited. 16-Feb-16 45 0.0 Loss 3 blow s due to Blow tank high level. 17-Feb-16 46 0.0 Loss 2 blow s due to WBL High Level. 18-Feb-16 47 0.0 Loss 1 blow due to WBL High Level. 19-Feb-16 31 2.00 2.0 Loss 5 blow s due to RB trip, Loss 12 blow s due to unbleached full 20-Feb-16 45 0.0 Loss 3 blow s due to Dig11 delay due to air supply blow valve lost 21-Feb-16 48 0.0 - 22-Feb-16 46 0.72 0.7 Loss 1 blow due to dig15 plug up, loss 1 blow due to mechanic change gasket cashing circulation pump dig1 23-Feb-16 46 0.65 0.7 Loss 1 blow due to mechanic change gasket suction circ. Pump, loss 1 blow due to dig14 shut dow n for inspection 24-Feb-16 48

0.0 -

25-Feb-16 42 5.42 5.4 Loss 4 blow s due to selector valve leak, loss 2 blow s due to change motor circulation pump dig12 26-Feb-16 42

0.0 Loss 6 blow s due to pressure accumulator is high

27-Feb-16 47 0.0 Loss 1 blow due to pressure accumulator is high 28-Feb-16 48 0.0 - 29-Feb-16 47 0.0 Loss 1 blow due to pressure accumulator is high Total 1241

0.0 8.4

0.0 0.0

3.0 2.0

13.4 0.00

1.20 0.00

0.00 0.43

0.29 1.92

FIBER LINE DOWN TIME FEBRUARY 2016 DATE D ig est er co o ks DIGESTER PLANT DOWNTIME FEBRUARY 2016 Remarks UNPLANNED DOWNTIME T o ta l U n p la n n e d D o w n ti m e T o ta l P la n n e d D o w n ti m e P ro cess M ech an ical In s tr u m e n t H yd rau li c E lect ri cal O th e rs

20.00 8.67

Dow ntim e 4.12 28.7 Universitas Sumatera Utara xxii 1-Mar-16 48 0.0 - 2-Mar-16 47 0.83 0.8 lost 1 blow due to shuttle conveyor 411M-101 problem 3-Mar-16 48 0.0 - 4-Mar-16 39 3.57 3.6 Lost 9 blow due to accumulator foaming 5-Mar-16 47 0.50 0.5 Lost 1 blow due to digester delay blow ing mech changed gasket safety valve blow tankB 6-Mar-16 48 0.0 - 7-Mar-16 47 1.00

1.0 Lost 1 blow due to digester 5 under mechanic.

8-Mar-16 43 1.67 1.7 Lost 5 blow s cooking time is long H factor 2500 and blow tank high level 9-Mar-16 47 0.50 0.5 lost 1 blow due to blow tank high level 10-Mar-16 38 0.0 Lost 10 blow s due to digester stop cooking Washing plant problem 11-Mar-16 47 1.17 1.2 Lost 1 blow due to mechanic changed gasket bottom liq.heater. 12-Mar-16 44 1.50 1.5 Lost 1 blow due to Mech changed gasket bottom liq.heater dig13 lost 3 blow due to blow tank high level . 13-Mar-16 35 0.0 Lost 13 blow s due to digester stop cooking Washing Plant problem 14-Mar-16 48

0.0 -

15-Mar-16 47 0.42 0.4 Lost 1 blow due to Mech changed gasket flange of Accumulator seal tank 16-Mar-16 48 0.0 - 17-Mar-16 47 0.7

0.7 Lost 1 blow due to chip filling plug up

18-Mar-16 42 0.33 1.75 2.1 Lost 1 blow due to dig15 cooking BL and lost 5 blow s due to Unbleach high level 19-Mar-16 42 3.17 3.2 Lost 6 blow s due to BT high level Bleaching stop due to D0 MC Pump motor high temp 20-Mar-16 47 0.67 0.7 Lost 1 blow due to Liquor charge valve dig3 cant close 21-Mar-16 48 0.0 - 22-Mar-16 48 0.0 - 23-Mar-16 48 0.0 - 24-Mar-16 47 0.33

0.3 Lost 1 blow due to inspect w ire w asher 1 w ashing

Dokumen yang terkait

Studi Kasus Audit Maintenance Rotating Equipmen,Pada PT. Toba Pulp Lestari, Tbk “Porsea” Medan

4 58 107

Studi Kasus Audit Maintenance Rotating Equipment Pada PT. Toba Pulp Lestari, Tbk, “Porsea”, Medan

9 109 107

Study Peningkatan Overall Equipment Effectiveness Melalui Penerapan Total Productive Maintenance Di PTPN IV PKS Pasir Mandoge

19 90 160

Usulan Perbaikan Efektivitas Mesin Dengan Menggunakan Metode Overall Equipment Efectiveness Sebagai Dasar Penerapan Total Productive Maintenance Di PT. Wika

6 57 150

Analisa Total Productive Maintenance Pada Mesin Thermoforming Dengan Menggunakan Metode Overall Equipment Effectiveness (OEE) di PT. Tirta Sibayakindo (TSI)

10 85 86

LAPORAN TUGAS AKHIR ANALISIS TOTAL PRODUCTIVE MAINTENANCE ANALISIS TOTAL PRODUCTIVE MAINTENANCE PENINGKATAN EFISIENSI PRODUKSI MESIN B-3 MELALUI OVERALL EQUIPMENT EFFECTIVENEES (OEE)(Study kasus : PT. Hartono Istana Teknologi).

6 15 14

Analisa Total Productive Maintenance Pada Mesin Thermoforming Dengan Menggunakan Metode Overall Equipment Effectiveness (OEE) di PT. Tirta Sibayakindo (TSI)

0 0 9

Analisa Total Productive Maintenance Pada Mesin Thermoforming Dengan Menggunakan Metode Overall Equipment Effectiveness (OEE) di PT. Tirta Sibayakindo (TSI)

0 0 2

Analisa Total Productive Maintenance Pada Mesin Thermoforming Dengan Menggunakan Metode Overall Equipment Effectiveness (OEE) di PT. Tirta Sibayakindo (TSI)

0 0 4

Analisa Total Productive Maintenance Pada Mesin Thermoforming Dengan Menggunakan Metode Overall Equipment Effectiveness (OEE) di PT. Tirta Sibayakindo (TSI)

0 0 9