- Mech change gasket outlet blow valve dig2 Loss 2 blow

xix 1-Dec-15 37 0.83 0.8 Delay chips filling due to limit sw itch stocker12 Problem ,repaired by electrical loss 3 blow s . Digester stop blow ing due to Washing plant problem Loss 8 blow s 2-Dec-15 50

0.0 -

3-Dec-15 49

0.0 -

4-Dec-15 38 0.0 Digester delay blow due to Washing plant problem Loss 5 blow s . Digester slow cook due to WL limited loss 5 blow s 5-Dec-15 46

0.0 Digester reduce set cook due to WL limited loss 2 blow s .

6-Dec-15 40

0.0 Digester reduce set cooks due to WL limited loss 8 blow s

7-Dec-15 44 0.0 Digester delay blow due to Washing plant problem loss 2 blow s . Digester reduce set cook due to WL limited loss 2 blow s 8-Dec-15 43 0.0 Digester delay liq.filling due to White Liquor limited Loss 5 blow s 9-Dec-15 45 0.0 Digester delay liq.filling due to White Liquor limited Loss 3 blow s 10-Dec-15 37 0.0 Digester Delay Liq.Filling due to White liquor Limited Loss 11 Blow s 11-Dec-15 44 0.0 Digester delay blow ing due to w ashing plant problem Loss 4 Blow s 12-Dec-15 46 0.0 Digester Loss 2 blow s due to H Factor is high Loss 2 Blow s 13-Dec-15 44 0.0 Digester delay blow ing due to w ashing plant tripped Loss 4 Blow s 14-Dec-15 47 0.75 1.00 1.8 Mech Changed gasket outlet blow valve dig2, Instrument Changed c\v bottomcirc.dig14 Loss 1 blow 15-Dec-15 44 5.08 5.1 Mech changed circ.pump dig14, Mech changed gasket bottom circ.pump dig06, Mech changed gasket c\v bottom circ.dig 14, Mech changed gasket casing circ.pump dig14. Loss 4 blow s 16-Dec-15 45 0.0 Digester Loss 2 blow s due to H Factor is high 17-Dec-15 46 1.67 1.7 Mech repair top cover dig05 Loss 1 Blow , Digester Loss 1 blow due to H Factor is high 18-Dec-15 43 0.50 0.5 Loss blow due to digester reduce flow steam to digester as per information from Turbine Loss 2 blow , Digester loss 4 blow s due to H Factor is high. 19-Dec-15 23

0.0 Digester loss 25 blow s dua to blow tank high level Washing Problem

20-Dec-15 43 3.25 3.3 Digester delay chip filling due to cover belt 411M-102 damage loss 4 blow s , Mech changed gasket midle circ.dig3 loss 1 blow 21-Dec-15 23

0.0 Digester stoped steaming due to Washing plant problem Loss 25 blow s

22-Dec-15 48

0.0 -

23-Dec-15 40

0.0 Digester slow cooking due to maintance quality loss 8 blow s

24-Dec-15 45

0.0 Digester stoped steaming due to pow er shortage loss 3 blow s

25-Dec-15 47 0.0 Mech changed gasket bottom Liq.heater dig13, Mech changed gasket blow valve dig14 Loss 1 blow . 26-Dec-15 39 0.0 Digester stoped steaming due to BSW stoped unbleached high level loss 9 blow s 27-Dec-15 47 0.0 Digester stoped due to flow chips less Loss 1 blow 28-Dec-15 44 2.00 2.0 Lost blow due to Mech change gasket outlet blow valve dig14, gasket drain blow line dig15, change gasket flushing line dig15, change gasket outlet LH dig4 Loss 4 blow s 29-Dec-15 46 0.48

0.5 Mech change gasket outlet blow valve dig2 Loss 2 blow

30-Dec-15 48

0.0 -

31-Dec-15 45

0.0 Lost blow s due to Blow Tank high level Loss 3 blow s

Dokumen yang terkait

Studi Kasus Audit Maintenance Rotating Equipmen,Pada PT. Toba Pulp Lestari, Tbk “Porsea” Medan

4 58 107

Studi Kasus Audit Maintenance Rotating Equipment Pada PT. Toba Pulp Lestari, Tbk, “Porsea”, Medan

9 109 107

Study Peningkatan Overall Equipment Effectiveness Melalui Penerapan Total Productive Maintenance Di PTPN IV PKS Pasir Mandoge

19 90 160

Usulan Perbaikan Efektivitas Mesin Dengan Menggunakan Metode Overall Equipment Efectiveness Sebagai Dasar Penerapan Total Productive Maintenance Di PT. Wika

6 57 150

Analisa Total Productive Maintenance Pada Mesin Thermoforming Dengan Menggunakan Metode Overall Equipment Effectiveness (OEE) di PT. Tirta Sibayakindo (TSI)

10 85 86

LAPORAN TUGAS AKHIR ANALISIS TOTAL PRODUCTIVE MAINTENANCE ANALISIS TOTAL PRODUCTIVE MAINTENANCE PENINGKATAN EFISIENSI PRODUKSI MESIN B-3 MELALUI OVERALL EQUIPMENT EFFECTIVENEES (OEE)(Study kasus : PT. Hartono Istana Teknologi).

6 15 14

Analisa Total Productive Maintenance Pada Mesin Thermoforming Dengan Menggunakan Metode Overall Equipment Effectiveness (OEE) di PT. Tirta Sibayakindo (TSI)

0 0 9

Analisa Total Productive Maintenance Pada Mesin Thermoforming Dengan Menggunakan Metode Overall Equipment Effectiveness (OEE) di PT. Tirta Sibayakindo (TSI)

0 0 2

Analisa Total Productive Maintenance Pada Mesin Thermoforming Dengan Menggunakan Metode Overall Equipment Effectiveness (OEE) di PT. Tirta Sibayakindo (TSI)

0 0 4

Analisa Total Productive Maintenance Pada Mesin Thermoforming Dengan Menggunakan Metode Overall Equipment Effectiveness (OEE) di PT. Tirta Sibayakindo (TSI)

0 0 9