Deskripsi Data ANALISIS DATA DAN PEMBAHASAN
Tabel 5.2 Perhitungan Anggaran Produksi
PT. Iskandar Indah Printing Textile Tahun 2014
Bulan Volume
Penjualan meter
Persediaan Akhir meter
Tersedia meter
Persediaan Awal meter
Produksi meter
Januari 788.122,00
157.624,40 945.746,40
157.541,40 788.205,00
Februari 779.215,00
155.843,00 935.058,00
157.624,40 777.433,60
Maret 770.324,00
154.064,80 924.388,80
155.843,00 768.545,80
April 818.721,00
163.744,20 982.465,20
154.064,80 828.400,40
Mei 843.298,00
168.659,60 1.011.957,60
163.744,20 848.213,40
Juni 870.631,00
174.126,20 1.044.757,20
168.659,60 876.097,60
Juli 810.341,00
162.068,20 972.409,20
174.126,20 798.283,00
Agustus 807.456,00
161.491,20 968.947,20
162.068,20 806.879,00
September 783.356,00
156.671,20 940.027,20
161.491,20 778.536,00
Oktober 819.895,00
163.979,00 983.874,00
156.671,20 827.202,80
November 842.479,00
168.495,80 1.010.974,80
163.979,00 846.995,80
Desember 869.687,00
173.937,40 1.043.624,40
168.495,80 875.128,60
Jumlah 9.803.525,00
1.960.705,00 11.764.230,00
1.944.309,00 9.819.921,00
Sumber: PT. Iskandar Indah Printing Textile Persediaan akhir = 20 x kebutuhan produksi
Persediaan awal bulan Januari data dari perusahaan
Setelah menyusun rencana produksi, untuk langkah berikutnya membuat anggaran biaya bahan baku.
1. Anggaran Kebutuhan Bahan Baku
Bahan baku yang dipergunakan untuk produksi kain grey adalah benang katun dan benang rayon. Dalam membuat kebutuhan anggaran bahan baku
PT. Iskandar Indah Printing Textile menetapkan terlebih dahulu standar pemakaian bahan baku. Untuk 1 ball benang yang beratnya 118,4 kg dapat
memproduksi 550,25 meter kain grey yang membutuhkan benang katun sebanyak 0,13 kg per meternya dan benang rayon sebanyak 0,11 kg per
meternya. Anggaran kebutuhan bahan baku dapat di lihat pada tabel 5.3
Tabel 5.3 Anggaran Kebutuhan Bahan Baku
PT. Iskandar Indah Printing Textile Tahun 2014
Bulan Produksi
meter Bahan Baku Benang
Katun Bahan Baku Benang
Rayon Pemakaian
kgm Jumlah kg
Pemakaian kgm
Jumlah kg Januari
788.205,00 0,13
98.919,73 0,11
83.155,63 Februari
777.433,60 0,13
97.567,92 0,11
82.019,24 Maret
768.545,80 0,13
96.452,50 0,11
81.081,58 April
828.400,40 0,13
103.964,25 0,11
87.396,24 Mei
848.213,40 0,13
106.450,78 0,11
89.486,51 Juni
876.097,60 0,13
109.950,25 0,11
92.428,30 Juli
798.283,00 0,13
100.184,52 0,11
84.218,86 Agustus
806.879,00 0,13
101.263,31 0,11
85.125,73 September
778.536,00 0,13
97.706,27 0,11
82.135,55 Oktober
827.202,80 0,13
103.813,95 0,11
87.269,90 November
846.995,80 0,13
106.297,97 0,11
89.358,06 Desember
875.128,60 0,13
109.828,64 0,11
92.326,07 Jumlah
9.819.921,00 1.232.400,09
1.036.001,67 Sumber: PT. Iskandar Indah Printing Textile
Sedangkan realisasi kebutuhan bahan baku pada PT. Iskandar Indah Printing Textile tahun 2014 dapat dilihat pada tabel 5.4
2. Anggaran Pembelian Bahan Baku
Di dalam melakukan pembelian bahan baku benang katun dan benang rayon, PT. Iskandar Indah Printing Textile melakukan pembelian
setiap bulan dua kali. Banyaknya pembelian bahan baku benang katun dan rayon merupakan jumlah yang dibutuhkan setiap kali produksi. Harga beli
bahan baku benang katun dan rayon tahun 2014 perusahaan memperkirakan sebesar Rp61.700kg sedangkan harga beli bahan baku
benang katun sebesar Rp43.400kg.
Tabel 5.4 Realisasi Kebutuhan Bahan Baku
PT. Iskandar Indah Printing Textile Tahun 2014
Bulan Produksi
meter Bahan Baku Benang Katun
Bahan Baku Benang Rayon Pemakaian
kgm Jumlah kg
Pemakaian kgm
Jumlah kg Januari
786.857,50 0,12
92.352,00 0,10
76.960,00 Februari
776.953,00 0,12
91.168,00 0,10
76.012,80 Maret
767.598,75 0,12
90.102,40 0,10
75.065,60 April
825.375,00 0,12
96.851,20 0,10
80.748,80 Mei
845.184,00 0,12
99.219,20 0,10
82.643,20 Juni
873.797,00 0,12
102.534,40 0,10
85.484,80 Juli
796.211,75 0,12
93.417,60 0,10
77.907,20 Agustus
805.566,00 0,12
94.601,60 0,10
78.736,00 September
776.953,00 0,12
91.168,00 0,10
76.012,80 Oktober
825.375,00 0,12
96.851,20 0,10
80.748,80 November
845.184,00 0,12
99.219,20 0,10
82.643,20 Desember
873.797,00 0,12
102.534,40 0,10
85.484,80 Jumlah
9.798.852,00 0,12
1.150.019,20 0,10
958.448,00 Sumber: PT. Iskandar Indah Printing Textile
Contoh perhitungan pembelian bahan baku yang dilakukan oleh PT. Iskandar Indah Printing Textile untuk bulan Januari adalah sebagai
berikut: a.
Bahan Baku Katun Kebutuhan Bahan Baku
98.919,73 kg Persediaan akhir bahan baku
19.783,95 + Jumlah kebutuhan bahan baku
118.703,67 Persediaan awal bahan baku
22.342,35 - Pembelian bahan baku
96.361,32 kg b.
Benang Rayon Kebutuhan Bahan Baku
83.155,63 kg Persediaan akhir bahan baku
16.631,13 + Jumlah kebutuhan bahan baku
99.786,75 Persediaan awal bahan baku
18.434,24 - Pembelian bahan baku
81.352,51 kg Demikianlah perhitungan tersebut berlaku untuk bulan berikutnya
sampai dengan bulan Desember 2014. Anggaran pembelian bahan baku untuk tahun 2014 disajikan pada tabel 5.5 dan 5.6 sedangkan untuk
realisasinya disajikan pada tabel 5.7 dan 5.8
53
Tabel 5.5 Anggaran Pembelian Bahan Baku Benang Katun
PT. Iskandar Indah Printing Textile Tahun 2014
Bulan Kebutuhan
kg Persediaan
akhir kg Jumlah
Persediaan awal kg
Pembelian kg
Hargakg Rp
Jumlah Pembelian Januari
98.919,73 19.783,95
118.703,67 22.342,35
96.361,32 61.700,00
5.945.493.629,10 Februari
97.567,92 19.513,58
117.081,50 19.783,95
97.297,55 61.700,00
6.003.259.122,52 Maret
96.452,50 19.290,50
115.743,00 19.513,58
96.229,41 61.700,00
5.937.354.848,74 April
103.964,25 20.792,85
124.757,10 19.290,50
105.466,60 61.700,00
6.507.289.259,49 Mei
106.450,78 21.290,16
127.740,94 20.792,85
106.948,09 61.700,00
6.598.697.032,07 Juni
109.950,25 21.990,05
131.940,30 21.290,16
110.650,14 61.700,00
6.827.113.777,44 Juli
100.184,52 20.036,90
120.221,42 21.990,09
98.231,33 61.700,00
6.060.872.752,50 Agustus
101.263,31 20.252,66
121.515,98 20.036,90
101.479,07 61.700,00
6.261.258.871,97 September
97.706,27 19.541,25
117.247,52 20.252,66
96.994,86 61.700,00
5.984.582.781,79 Oktober
103.813,95 20.762,79
124.576,74 19.541,25
105.035,49 61.700,00
6.480.689.614,54 November
106.297,97 21.259,59
127.557,57 20.762,79
106.794,78 61.700,00
6.589.237.752,01 Desember
109.828,64 21.965,73
131.794,37 21.259,59
110.534,77 61.700,00
6.819.995.466,95 Jumlah
1.232.400,09 246.480,02 1.478.880,10
246.856,68 1.232.023,42
76.015.844.909,11
Sumber: PT. Iskandar Indah Printing Textile Persediaan akhir = 20 x kebutuhan produksi
Persediaan awal bulan Januari data dari perusahaan
Tabel 5.6 Anggaran Pembelian Bahan Baku Benang Rayon
PT. Iskandar Indah Printing Textile Tahun 2014
Bulan Kebutuhan
kg Persediaan
akhir kg Jumlah
Persediaan awal kg
Pembelian kg
Hargakg Rp
Jumlah Pembelian Rp
Januari 83.155,63
16.631,13 99.786,75
18.434,24 81.352,51
43.400,00 3.530.699.064,20
Februari 82.019,24
16.403,85 98.423,09
16.631,13 81.791,97
43.400,00 3.549.771.422,48
Maret 81.081,58
16.216,32 97.297,90
16.403,85 80.894,05
43.400,00 3.510.801.738,75
April 87.396,24
17.479,25 104.875,49
16.216,32 88.659,17
43.400,00 3.847.808.162,02
Mei 89.486,51
17.897,30 107.383,82
17.479,25 89.904,57
43.400,00 3.901.858.252,94
Juni 92.428,30
18.485,66 110.913,96
17.897,30 93.016,65
43.400,00 4.036.922.760,16
Juli 84.218,86
16.843,77 101.062,63
18.485,66 82.576,97
43.400,00 3.583.840.428,56
Agustus 85.125,73
17.025,15 102.150,88
16.843,77 85.307,11
43.400,00 3.702.328.578,34
September 82.135,55
16.427,11 98.562,66
17.025,15 81.537,51
43.400,00 3.538.727.964,38
Oktober 87.269,90
17.453,98 104.723,87
16.427,11 88.296,76
43.400,00 3.832.079.595,79
November 89.358,06
17.871,61 107.229,67
17.453,98 89.775,69
43.400,00 3.896.264.910,41
Desember 92.326,07
18.465,21 110.791,28
17.871,61 92.919,67
43.400,00 4.032.713.650,22
Jumlah 1.036.001,67 207.200,33 1.243.202,00 207.169,36 1.036.032,64
44.963.816.528,26
Sumber: PT. Iskandar Indah Printing Textile Persediaan akhir = 20 x kebutuhan produsi
Persediaan awal bulan Januari data dari Perusahaan
Tabel 5.7 Realisasi Pembelian Bahan Baku Benang Katun
PT. Iskandar Indah Printing Textile Tahun 2014
Bulan Kebutuhan
kg Persediaan
Akhir kg Jumlah
Persediaan awal kg
Pembelian kg
Hargakg Rp
Jumlah Pembelian Rp
Januari 92.352,00
18.470,40 110.822,40
22.342,35 88.480,05
63.400,00 5.609.635.170,00
Februari 91.168,00
18.233,60 109.401,60
18.470,40 90.931,20
63.400,00 5.765.038.080,00
Maret 90.102,40
18.020,48 108.122,88
18.233,60 89.889,28
63.400,00 5.698.980.352,00
April 96.851,20
19.370,24 116.221,44
18.020,48 98.200,96
63.400,00 6.225.940.864,00
Mei 99.219,20
19.843,84 119.063,04
19.370,24 99.692,80
63.400,00 6.320.523.520,00
Juni 102.534,40
20.506,88 123.041,28
19.843,84 103.197,44
63.400,00 6.542.717.696,00
Juli 93.417,60
18.683,52 112.101,12
20.506,88 91.594,24
63.400,00 5.807.074.816,00
Agustus 94.601,60
18.920,32 113.521,92
18.683,52 94.838,40
63.400,00 6.012.754.560,00
September 91.168,00
18.233,60 109.401,60
18.920,32 90.481,28
63.400,00 5.736.513.152,00
Oktober 96.851,20
19.370,24 116.221,44
18.233,60 97.987,84
63.400,00 6.212.429.056,00
November 99.219,20
19.843,84 119.063,04
19.370,24 99.692,80
63.400,00 6.320.523.520,00
Desember 102.534,40
20.506,88 123.041,28
19.843,84 103.197,44
63.400,00 6.542.717.696,00
Jumlah 1.150.019,20 230.003,84 1.380.023,04 231.839,31 1.148.183,73
72.794.848.482,00
Persediaan akhir = 20 x kebutuhan produksi Persediaan awal bulan Januari data dari Perusahaan
Tabel 5.8 Realisasi Pembelian Bahan Baku Benang Rayon
PT. Iskandar Indah Printing Textile Tahun 2014
Bulan Kebutuhan
kg Persediaan
Akhir kg Jumlah
Persediaan Awal kg
Pembelian kg
Hargakg Rp
Jumlah Pembelian Rp
Januari 76.960,00
15.392,00 92.352,00
18.434,24 73.917,76 44.800,00 3.311.515.648,00
Februari 76.012,80
15.202,56 91.215,36
15.392,00 75.823,36 44.800,00 3.396.886.528,00
Maret 75.065,60
15.013,12 90.078,72
15.202,56 74.876,16 44.800,00 3.354.451.968,00
April 80.748,80
16.149,76 96.898,56
15.013,12 81.885,44 44.800,00 3.668.467.712,00
Mei 82.643,20
16.528,64 99.171,84
16.149,76 83.022,08 44.800,00 3.719.389.184,00
Juni 85.484,80
17.096,96 102.581,76
16.528,64 86.053,12 44.800,00 3.855.179.776,00
Juli 77.907,20
15.581,44 93.488,64
17.096,96 76.391,68 44.800,00 3.422.347.264,00
Agustus 78.736,00
15.747,20 94.483,20
15.581,44 78.901,76 44.800,00 3.534.798.848,00
September 76.012,80
15.202,56 91.215,36
15.747,20 75.468,16 44.800,00 3.380.973.568,00
Oktober 80.748,80
16.149,76 96.898,56
15.202,56 81.696,00 44.800,00 3.659.980.800,00
November 82.643,20
16.528,64 99.171,84
16.149,76 83.022,08 44.800,00 3.719.389.184,00
Desember 85.484,80
17.096,96 102.581,76
16.528,64 86.053,12 44.800,00 3.855.179.776,00
Jumlah 958.448,00 191.689,60 1.150.137,60 193.026,88 957.110,72
42.878.560.256,00
Persediaan akhir = 20 x kebutuhan produksi Persediaan awal bulan Januari data dari perusahaan
3. Anggaran Pemakaian Bahan Baku
Setelah menyusun anggaran pembelian bahan baku benang katun dan benang rayon, langkah selanjutnya adalah menyusun anggaran
pemakaian bahan baku. Dengan Anggaran ini perusahaan dapat menentukan harga pokok produk yang dihasilkan. Anggaran pemakaian
bahan baku benang katun dan benang rayon dapat dilihat pada tabel 5.9 dan 5.10.
Tabel 5.9 Anggaran Pemakaian Biaya Bahan Baku Benang Katun
PT. Iskandar Indah Printing Textile Tahun 2014
Bulan Kebutuhan
kg Hargakg
Rp Jumlah Pemakaian
Rp Januari
98.919,73 61.700,00
6.103.347.186,75 Februari
97.567,92 61.700,00
6.019.940.466,56 Maret
96.452,50 61.700,00
5.951.119.120,43 April
103.964,25 61.700,00
6.414.594.237,34 Mei
106.450,78 61.700,00
6.568.013.230,89 Juni
109.950,25 61.700,00
6.783.930.350,96 Juli
100.184,52 61.700,00
6.181.384.668,05 Agustus
101.263,31 61.700,00
6.247.946.504,65 September
97.706,27 61.700,00
6.028.476.735,60 Oktober
103.813,95 61.700,00
6.405.320.801,38 November
106.297,97 61.700,00
6.558.584.927,93 Desember
109.828,64 61.700,00
6.776.427.044,81 Jumlah
1.232.400,09 76.039.085.275,35
Sumber: PT. Iskandar Indah Printing Textile
Sedangkan untuk realisasi pemakaian bahan baku dapat dilihat pada tabel 5.11 dan 5.12
Tabel 5.10 Anggaran Pemakaian Biaya Bahan Baku Benang
Rayon PT. Iskandar Indah Printing Textile Tahun 2014
Bulan Kebutuhan
kg Hargakg
Rp Jumlah
Pemakaian Rp Januari
83.155,63 43.400,00 3.608.954.233,50
Februari 82.019,24
43.400,00 3.559.635.224,32 Maret
81.081,58 43.400,00 3.518.940.654,46
April 87.396,24
43.400,00 3.792.996.911,48 Mei
89.486,51 43.400,00 3.883.714.694,58
Juni 92.428,30
43.400,00 4.011.388.081,12 Juli
84.218,86 43.400,00 3.655.098.372,10
Agustus 85.125,73
43.400,00 3.694.456.877,30 September
82.135,55 43.400,00 3.564.682.783,20
Oktober 87.269,90
43.400,00 3.787.513.460,36 November
89.358,06 43.400,00 3.878.139.669,46
Desember 92.326,07
43.400,00 4.006.951.320,82 Jumlah
1.036.001,67 44.962.472.282,70
Sumber: PT. Iskandar Indah Printing Textile
Tabel 5.11 Realisasi Pemakaian Biaya Bahan Baku Benang Katun
PT. Iskandar Indah Printing Textile Tahun 2014
Bulan Kebutuhan
kg Hargakg
Rp Jumlah Pemakaian
Rp Januari
92.352,00 63.400,00
5.855.116.800,00 Februari
91.168,00 63.400,00
5.780.051.200,00 Maret
90.102,40 63.400,00
5.712.492.160,00 April
96.851,20 63.400,00
6.140.366.080,00 Mei
99.219,20 63.400,00
6.290.497.280,00 Juni
102.534,40 63.400,00
6.500.680.960,00 Juli
93.417,60 63.400,00
5.922.675.840,00 Agustus
94.601,60 63.400,00
5.997.741.440,00 September
91.168,00 63.400,00
5.780.051.200,00 Oktober
96.851,20 63.400,00
6.140.366.080,00 November
99.219,20 63.400,00
6.290.497.280,00 Desember
102.534,40 63.400,00
6.500.680.960,00 Jumlah
1.150.019,20 72.911.217.280,00
Sumber: PT. Iskandar Indah Printing Textile
Tabel 5.12 Realisasi Pemakaian Biaya Bahan Baku Benang Rayon
PT. Iskandar Indah Printing Textile Tahun 2014
Bulan Kebutuhan
Kg Hargakg
Rp Jumlah Pemakaian
Rp Januari
76.960,00 44.800,00
3.447.808.000,00 Februari
76.012,80 44.800,00
3.405.373.440,00 Maret
75.065,60 44.800,00
3.362.938.880,00 April
80.748,80 44.800,00
3.617.546.240,00 Mei
82.643,20 44.800,00
3.702.415.360,00 Juni
85.484,80 44.800,00
3.829.719.040,00 Juli
77.907,20 44.800,00
3.490.242.560,00 Agustus
78.736,00 44.800,00
3.527.372.800,00 September
76.012,80 44.800,00
3.405.373.440,00 Oktober
80.748,80 44.800,00
3.617.546.240,00 November
82.643,20 44.800,00
3.702.415.360,00 Desember
85.484,80 44.800,00
3.829.719.040,00 Jumlah
958.448,00 42.938.470.400,00
Sumber: PT. Iskandar Indah Printing Textile
Langkah kedua yang perlu dilakukan sebelum melakukan analisis pembelian bahan baku yang ekonomis menggunakan metode Economic
Order Quantity dan perencanaan persediaan bahan baku menggunakan safety
stock dan reorder point adalah mengumpulkan data yang berkaitan dengan
kebutuhan bahan baku yang diperlukan perusahaan. Selama ini PT. Iskandar Indah Printing Textile memperoleh bahan baku
dengan mengandalkan kiriman dari supplier setelah mengadakan transaksi pembelian. PT. Iskandar Indah Printing Textile tidak menggunakan metode
EOQ untuk mengendalikan persediaan bahan baku benang. Dalam memenuhi kebutuhan bahan baku, perusahaan harus
menanggung beberapa biaya persediaan yang meliputi biaya pesan dan biaya simpan.
1. Biaya Pemesanan
Biaya yang dikeluarkan sehubungan dengan kegiatan pemesanan bahan baku. Biaya ini berubah sesuai dengan frekuensi pemesanan. Biaya
pemesanan yang ditanggung oleh PT. Iskandar Indah Printing Textile, antara lain:
a. Biaya Telepon
Biaya yang timbul karena pemakaian jasa komunikasi dalam mengadakan transaksi pemesanan bahan baku. Perusahaan melakukan
pemesanan sebanyak 24 kali dalam setahun, biaya telepon sekali pesan Rp200.000.
Jadi dalam setahun perusahaan mengeluarkan biaya telepon sebesar Rp200.000 x 24 kali pesan = Rp4.800.000.
b. Biaya Faximile
Biaya ini timbul karena melakukan pemesanan dengan jasa telepon, perusahaan mengirimkan faximile dengan tujuan untuk
memastikan bahwa perusahaan benar-benar telah memesan bahan baku terhadap supllier yang bersangkutan. Pemesanan terjadi 24 kali
dalam setahun dan biaya faximile sekali pesan Rp25.000. Jadi besarnya faximile Rp25.000 x 24 kali pesan = Rp600.000.
c. Biaya Administrasi
Biaya yang terjadi karena adanya transaksi pembayaran dari pembelian bahan baku. Setiap mengadakan transaksi perusahaan
menanggung biaya administrasi sebesar Rp92.000. Jadi besarnya biaya administrasi dalam setahun Rp92.000 x 24 = Rp2.208.000.
2. Biaya Penyimpanan
Biaya yang timbul karena perusahaan melakukan penyimpanan dalam pengadaan persediaan bahan baku. Biaya-biaya yang terjadi selama tahun
2014 adalah sebagai berikut: a.
Biaya listrik Biaya ini timbul karena adanya pemakaian listrik selama bahan
baku disimpan di gudang untuk menunggu proses produksi selanjutnya, seperti: penerangan dan menjaga suhu gudang agar tidak
terlalu panas. Untuk mengetahui besarnya listrik yang diserap oleh
bagian gudang, maka harus diketahui besarnya daya keseluruhan yang digunakan perusahaan kemudian dibandingkan antara besarnya daya
keseluruhan. Diketahui besarnya biaya listrik selama tahun 2014 adalah Rp7.000.000 dan daya listrik yang digunakan keseluruhan
adalah 1800 watt. Bagian gudang menggunakan sebesar 450 watt dan bagian lain seperti bagian administrasi, produksi dan lain-lain sebesar
1350 watt. Menurut keterangan diatas, maka dapat dihitung besarnya biaya listrik per tahun yang diserap oleh bagian gudang adalah:
b. Biaya Tenaga Kerja Gudang
Biaya ini dikeluarkan untuk gaji karyawan di bidang gudang yang mengatur dan menjaga aliran bahan baku. Setiap bulannya
perusahaan mengeluarkan biaya untuk gaji karyawan bagian gudang sebesar Rp1.300.000 untuk 3 karyawan. Jadi, besarnya biaya tenaga
kerja dalam setahun adalah: Rp1.300.000 x 3 x 12 bulan = Rp46.800.000
c. Biaya Pemeliharaan Gudang
Biaya yang timbul karena adanya pemeliharaan terhadap gudang. Biaya pemeliharaan gudang per tahun ditetapkan oleh pihak
perusahaan sebesar Rp2.000.000. Datum yang diperlukan untuk melakukan pembelian secara ekonomis bahan
baku dapat dilihat pada tabel 5.13 dan 5.14.
Tabel 5.13 Pembelian Bahan Baku Benang
PT. Iskandar Indah Printing Textile Tahun 2014
Bulan Benang
Katun kg Benang
Rayon kg Jumlah
ball Januari
88.480,05 73.917,76
162.397,81 Februari
90.931,20 75.823,36
166.754,56 Maret
89.889,28 74.876,16
164.765,44 April
98.200,96 81.885,44
180.086,40 Mei
99.692,80 83.022,08
182.714,88 Juni
103.197,44 86.053,12
189.250,56 Juli
91.594,24 76.391,68
167.985,92 Agustus
94.838,40 78.901,76
173.740,16 September
90.481,28 75.468,16
165.949,44 Oktober
97.987,84 81.696,00
179.683,84 November
99.692,80 83.022,08
182.714,88 Desember
103.197,44 86.053,12
189.250,56 Jumlah
1.148.183,73 957.110,72 2.105.294,45
Sumber: PT. Iskandar Indah Printing Textile
Tabel 5.14 Biaya Pemesanan dan Biaya Penyimpanan Bahan Baku
PT. Iskandar Indah Printing Textile Tahun 2014
Biaya Pemesanan
Jumlah Rp 1. Biaya telepon
4.800.000 2. Biaya Faximile
600.000 3. Biaya Administrasi
2.208.000 Total Jumlah
7.608.000
Biaya Penyimpanan
Jumlah Rp 1. Biaya listrik
1.750.000 2. Biaya tenaga kerja
46.800.000 3. Biaya pemeliharaan
gudang 2.000.000
Total Jumlah 50.550.000
Sumber: PT. Iskandar Indah Printing Textile
Perhitungan Biaya Pemesanan dan Biaya Penyimpanan a.
Biaya Pemesanan setiap kali pesan = Total biaya pesan
Frekuensi pemesanan
= Rp7.608.000,00 24
= Rp317.000,00 b.
Biaya Penyimpanan per kg bahan baku = Total biaya simpan
Jumlah pembelian benang
= Rp50.550.000,00 2.105.294,45
= Rp24,01