Monthly Progress Report October 2013
Western I ndonesia National Roads I mprovement Project 35
Pariaman-Manggopoh, No.10 Sp. Empat-Sp. Air Balam and No.12 Kambang- Indrapura on October 7, 2013
• Submission LARAP Report of Packages No. 15 : Sibolga-Batas Tapsel In
Sibolga-North Sumatera Province On October 22, 2013 •
Pre Implementation Review Mission During October 28 – October 31,2013 •
No Objection Letter for Amandment No. 1 WINRIP 8043-ID •
Mobilization the Financial Management Specialist. The following table summarized the CTC personnel field activities during October
2013.
.
Date Position
Destination Purpose
2-4 October Senior
Highway Engineer, Senior Road
Safety Engineer,
Highway Engineer Bengkulu and
Lampung Feasibility
Study for
Replacement Road Seblat – Ketahun and Betungan Tais
Bengkulu Rantau Tijang – Kota Agung
23-25 October Quality
Assurance Engineer
Bengkulu Project
Orientation and
Coordination with PPK Package Ipuh-Bantal
6.2.2 Design and Supervision Consultant DSC
The Design and Supervision Consultant DSC will be responsible for design of WP 2 and WP 3 civil works and supervision of all civil works. They will have the role of
‘Engineer’ under a FIDIC-type contract. The tasks include the preparation and maintenance of a quality assurance plan, validation and updating of designs,
supervision of all civil works, environmental and social monitoring and management, and support for financial and progress monitoring and reporting.
The DSC will also be responsible for quality assurance of materials and workmanship, certifying whether or not contractors have achieved the required
results, as well as documentation and reporting based on the financial management plan. They will prepare a Quality Assurance system covering all subprojects, and
continuously monitor the effectiveness of their supervision procedures. The team will be contracted and managed by DGH through the Bina Marga Regional Office Balai
II, and will be based in Padang, West Sumatra.
DSC contract was negotiated in Balai Besar Pelaksanaan Jalan Nasional II Balai-II of DGH. The negotiation result and draft contract have been sent to WB on 25 March
2013 for review and approval. The Bank issued no objection letter on the negotiation results and draft contract with letter dated 19 April 2013.
6.2.3 Road Sector Institutional Development
This component consists of technical assistance for capacity building for the new environmentrisk mitigation and road safety unit to enhance its capacity for disaster
risk assessment and planning, risk mapping of land-slides, coastal erosion, earthquake and floods, analysis of alternative road designs for road segments
passing through critical environmental assets and vulnerable areas.