Detailed Design Preparation WINRIP DOC MPR CTC MPR No.6 2013 06 2013 06 12 00225.
Monthly Progress Report June 2013
Western I ndonesia National Roads I mprovement Project 15
All three 3 Procurement Teams or Pokja evaluated all qualification documents submitted by those Applicants. Submission of the Application Evaluation Report AER to
the Bank was on 9 May 2012 for two packages Package No.1 and No.4 and on 20 June 2012 for other two packages Package No.2 and No.3. The Bank still reviews the
AERs and requested the Pokja to submit supporting documents. The latest request from the Bank was sent to DGH on 15 March 2013 for board of director and board of
commissioner information of the Government’s Entity participated in the prequalification. Finally, the Bank approved the AERs with issuance letter Ref. No. WINRIP120 dated 22
April 2013. All the prequalified Bidders have been announced by DGH on 17 May 2013. The results of prequalification are summarized as the table below.
No Singles JO Legal Name
Participate and Result of the PQ Package
No.1 Package
No.2 Package
No.3 Package
No.4
1 PT. AdhiKarya Persero, Tbk.
Passed NA
NA Passed
2 PT. AdhiKarya - PT. AngkasapuriKonsursindo, JO.
NA Passed
Passed NA
3 PT. BangunCiptaKonstruksi - PT. AmartaKarya Persero, JO.
Passed NA
NA NA
4 PT. BrantasAbipraya Persero
Passed NA
Passed NA
5 PT. Citra GadingAsritama
NA NA
NA Passed
6 PT. ConblocInfratecno
Passed NA
Passed NA
7 PT. Duta Graha Indah, Tbk.
Passed Passed
Passed NA
8 PT. HutamaKarya Persero
NA Passed
Passed NA
9 PT. HutamaKarya Persero - PT. SuciKarya Bad inusa, JO.
Passed NA
NA Passed
10 PT. Jaya Konstruksi MP, Tbk. Passed
Passed Passed
Failed 11 Kuk Dong Eng. Corp. - PT. Duta Graha Indah, Tbk., JO.
NA NA
NA Passed
12 PT. Multi Structure Passed
Passed Passed
Passed 13 PT. NindyaKarya Persero
NA Failed
Passed Failed
14 PT. NindyaKarya Persero - PT. RindangTigasatuPratama, JO. Passed
NA NA
NA 15 Pan Asia Corp. - PT. AnugerahKarya Agra Sentosa, JO.
Passed NA
Passed Failed
16 PT. PP Persero, Tbk. NA
Passed Passed
NA 17 PT. PP Persero Tbk - PT. Tri Citra Perdana JO.
Passed NA
NA Passed
18 PT. WaskitaKarya Persero NA
Passed Passed
NA 19 PT. WaskitaKarya Persero - PT. AngkasaPuriKonsursindo, JO.
Passed NA
NA NA
20 PT. WaskitaKarya Persero - PT. DayaMuliaTurangga, JO. NA
NA NA
Passed 21 PT. WijayaKarya – PT. LubukMinturunKaryaPersada, JO.
NA Passed
Passed Passed
22 PT. Yasa Patria Perkasa NA
NA Passed
NA 23 PT. AngkasaTeknik Raya
NA Failed
Failed NA
24 PT. BangunCipta - Barettamuda KSO. NA
NA Failed
NA 25 PT. BumiRejo
Failed NA
NA Failed
26 PT. CiptaKarya Prima Mandiri NA
Failed Failed
NA 27 PT. SumberBatu
NA Failed
NA NA
28 Synohidro Co. Ltd. NA
Failed Failed
NA 29 PT. TelagaMegabuana - PT. Mawatindo Road Construction, JO
NA NA
Failed NA
Number Of Applicants submitted the document 13
13 18
12
Number Of Qualified Applicant 12
8 13
8
Number Of Applicant failed to fulfill the qualification requirement
1 5
5 4
Note : NA = Not Applied for Prequalification
.
The consolidated multiple contracts ICB Bidding Documents for four 4 packages under AWP-1 had been concurred by Bank on 31 October 2012. Following the Bank’s approval
for prequalified Bidders, the Invitation for Bid was sent to all prequalified Bidders on 27 May 2013 and the Bidding Document approved by the Bank was issued.
Pre Bid Meetings were held in 10 June 2013: in Lampung for Package No.1 Krui – Biha, in Padang for Package No. 2 Padang Sawah – Sp. Empat and Package No.3
Manggopoh – Padang Sawah, and in Bengkulu for Package No.4 Ipuh – Bantal. CTC