Review Design Integration, Road Safety Aspects and Monitoring of Environmental Studies

Western I ndonesia National Roads I mprovement Project 4 - 14

4.6.2.2 Social Issues

1. Monitoring Report of the LARAP Package No. 1

: Krui Biha Province : Lampung A. Previous Status : • LARAP implementation documents approved by World Bank on January 4, 2013 • Monitoring Report No.1 revised approved by World Bank on June 26, 2013 • Monitoring Report No.2 approved by World Bank on October 20, 2015. B. Pending Issues, Concern and Actions • No more issue, LARAP fully completed. C. Update during this reporting month of June 2016 a Construction completed in January 20, 2016. b Total PAP = 2,815 ; Compensated = 2,815 ; Percent complete = 100.

2. Monitoring Report of the LARAP Package No. 2

: Padang Sawah Sp. Empat Province : Sumatera Barat A. Previous Status : • LARAP documents approved by World Bank on January 13, 2013 • Monitoring Report No.1 revised approved by World Bank on July 19, 2013 • Additional LARAP Implementation documents approved by World Bank on July 21, 2014 • Monitoring Report No.2 approved by World Bank on Feb. 12, 2015 B. Pending Issues, Concern and Actions a Compensation for 24 PAP along the road link is under compensation payment process by Local Government of West Sumatera Province b Price negotiation between the Land Acquisition Committee and the remaining 1 PAP along Air Gadang Bridge is still to be finalized. C. Update during this reporting month of June 2016 a Construction completed in April 19, 2016. b Total PAP = 466 ; Compensated = 442 ; Percent complete = 94,85. c No update this period

3. Monitoring Report of the LARAP Package No. 3

: Manggopoh Padang Sawah Province : Sumatera Barat A. Previous Status : • LARAP documents approved by World Bank on January 4, 2013 • Monitoring Reports No.1, 2, 3, 4 and 5 already approved and World Bank issued No Objection Letter NOL. • Monitoring Report for the remaining 1 PAP already submitted to WB B. Pending Issues, Concerns and Actions Western I ndonesia National Roads I mprovement Project 4 - 15 • No more issue, LARAP fully completed. C. Update during this reporting month of June 2016 a Construction completed on March 17, 2016. b Total PAP = 1,338 ; Compensated = 1,338 ; Percen complete = 100.

4. Monitoring Report of the LARAP Package No. 4

: Ipuh Bantal Province : Bengkulu A. Previous Status : • LARAP documents approved by World Bank on December 10, 2012 • Monitoring Report No.1, 2 and 3 already approved and No Objection Letter NOL were issued by World Bank B. Pending Issues, Concern and Actions • No more issue, LARAP fully completed. C. Update during this reporting month of June 2016 a Construction completed in April 11, 2016. b Total PAP = 261 ; Compensated = 261 ; Percent complete = 100.

5. Monitoring Report of the LARAP Package No. 5

: Sp. Rampa Poriaha Province : Sumatera Utara A. Previous Status : • LARAP documents approved by World Bank on September 16, 2013. • World Bank accepted the revised LARAP documents and issued No Objection Letter on November 12, 2013 to the action plan implementation of the LARAP. • Additional LARAP documents approved by World Bank on January 8, 2016. B. Pending Issues, Concern and Actions a Still to be submitted is the implementation report from Satker of the completed relocation of the kiosk. b Existing permit on forest land for road project from Ministry of Forest still need to be clarified.. c Monitoring Report for the LARAP implementation of the completed relocation of the kiosk still to be prepared for submission to World Bank. d Monitoring Report for the compensation payments of the 68 PAP still to be prepared for submission to WB. C. Update during this reporting month of June 2016 a Documents for the payments of the 68 PAPs are under preparation. b Total PAP = 71 ; Compensated = 68; Percent Complete = 96.

6. Monitoring Report of the LARAP Package No. 6

: Pasar Pedati - Kerkap Province : Bengkulu A. Previous Status : • World Bank issued on May 30, 2015 a No Objection Letter on the revised LARAP documents for