KESIMPULAN SARAN Analisis tekno ekonomi mikrohidro untuk desa mandiri energy di Kampung Lebakcipung, Jawa Barat

V. DAFTAR PUSTAKA Anonim. 2004.Manual Pembangunan PLTMH. JICA dan IBEKA.Jakarta. Anonim.2011.Instalasi Listrik Pertanian. Diklatkuliah. Energi Elektrifikasi Pertanian. Teknik Pertanian. Institut Pertanain Bogor. [BPS] Badan Satistik Nasional.2010. Data peta Kecamatan Cibeber Blue Print Pengolahan Energi Nasional, 2005. http:www.scribd.comdoc6099734 Blueprint pengelolaan-Energi-Nasional-20052025-Indonesia Damastuti, P A. 1997. Pembangkit Listrik Tenaga Mikrohidro. De garmo E P, Sullivan W G, Bontadelli J A, Wicks E M. 1997. Ekonomi Teknik Jakarta : PT prehallindo Heliyanto, B. 2000. Desa Mandri Energi, Bayumedia Publishing. Malang Pujawan, I N 2009. Ekonomi Teknik. Guna Widya. Indonesia Pusat Penelitian Kopi dan Kakao Indonesia. 2006. Pengolah Produk Primer dan Sekunder Kopi, Jember. Salim, N.2009. Kebijakan Insesntif untuk mendorong Pemanfaatan Energi Alternatif. Di dalam http:www.pelangi.or.idnews.php?hid=54. Diakses 17 februari 2011. Soetarno.1975. Sistem Listrik Mikrohidro unuk melesatarikan Desa. Universitas Gadjah Mada. Yogyakarta. Http:www.deptan.go.id.pesantrenalsintanprofilbunkebun2 .htm. Diakses 15 Juni 2011. LAMPIRAN Lampiran 2. Nilai NPV, Net BC, Pay back period dan Gross BC golongan tarif pelayanan sosial 2200 VA NPV : Rp 11.127.288 Net BC : Total PVB-C tahun ke 1-20 - PVB-C tahun ke 0 : Rp 27.472.7288 - - Rp -263600000 :1,04 Gross BC :PV B PV C : Rp 352.692.165 Rp 341564877 : 1,03 Pay back periode :tahun ke 17-18 Tahun Biaya C Penerimaan B DF 10 PV C PV B PV B-C Akumulasi PV 263.600.000 1 263600000 -263600000 -263600000 1 9.159.675 40950000 0,909 8326977 37227272,73 28900295 -234699705 2 9.159.675 40950000 0,826 7569979 33842975,21 26272996 -208426709 3 9.159.675 40950000 0,751 6881799 30766341,1 23884542 -184542167 4 9.159.675 40950000 0,683 6256181 27969401 21713220 -162828947 5 9.159.675 40950000 0,621 5687438 25426728,18 19739291 -143089657 6 9.159.675 40950000 0,564 5170398 23115207,44 17944810 -125144847 7 9.159.675 40950000 0,513 4700362 21013824,94 16313463 -108831384 8 9.159.675 40950000 0,467 4273056 19103477,22 14830421 -94000962 9 9.159.675 40950000 0,424 3884596 17366797,47 13482201 -80518761 10 9.159.675 49693815 0,386 3531451 19159116,9 15627666 -64891096 11 9.159.675 40950000 0,350 3210410 14352725,18 11142315 -53748781 12 9.159.675 40950000 0,319 2918555 13047931,99 10129377 -43619403 13 9.159.675 40950000 0,290 2653232 11861756,35 9208525 -34410879 14 9.159.675 40950000 0,263 2412029 10783414,86 8371386 -26039492 15 9.159.675 40950000 0,239 2192753 9803104,422 7610351 -18429141 16 9.159.675 40950000 0,218 1993412 8911913,111 6918501 -11510640 17 9.159.675 40950000 0,198 1812193 8101739,191 6289546 -5221094 18 9.159.675 40950000 0,180 1647448 7365217,447 5717769 496675 19 9.159.675 40950000 0,164 1497680 6695652,224 5197972 5694648 20 9.048.000 45596090 0,149 1344928 6777568,241 5432641 11127288 341564877 352692165,2 Lampiran 3. Perhitungan IRR golongan tarif pelayanan sosial 2200 VA Tahun Biaya C Penerimaan B DF 10 PV C PV B PV B-C Akumulasi PV 263.600.000 1 263600000 - 263600000 -263600000 1 9.159.675 40950000 0,904 8281804 37.025.316 28743513 -234856487 2 9.159.675 40950000 0,818 7488069 33.476.778 25988709 -208867778 3 9.159.675 40950000 0,739 6770406 30.268.335 23497929 -185369849 4 9.159.675 40950000 0,668 6121524 27.367.391 21245867 -164123982 5 9.159.675 40950000 0,604 5534832 24.744.477 19209645 -144914337 6 9.159.675 40950000 0,546 5004369 22.372.944 17368576 -127545761 7 9.159.675 40950000 0,494 4524746 20.228.702 15703956 -111841805 8 9.159.675 40950000 0,447 4091090 18.289.966 14198876 -97642930 9 9.159.675 40950000 0,404 3698997 16.537.039 12838043 -84804887 10 9.159.675 49693815 0,365 3344481 18.144.753 14800272 -70004615 11 9.159.675 40950000 0,330 3023943 13.519.092 10495148 -59509467 12 9.159.675 40950000 0,298 2734126 12.223.410 9489284 -50020183 13 9.159.675 40950000 0,270 2472085 11.051.908 8579823 -41440360 14 9.159.675 40950000 0,244 2235158 9.992.683 7757525 -33682835 15 9.159.675 40950000 0,221 2020939 9.034.976 7014037 -26668798 16 9.159.675 40950000 0,199 1827250 8.169.056 6341806 -20326992 17 9.159.675 40950000 0,180 1652125 7.386.127 5734002 -14592990 18 9.159.675 40950000 0,163 1493784 6.678.234 5184450 -9408540 19 9.159.675 40950000 0,147 1350618 6.038.186 4687568 -4720973 20 9.048.000 45596090 0,133 1206285 6.078.901 4872616 151643 338476631 338.628.274 Internal Rate of Return IRR : 10,6 Contoh perhitungan pada tahun ke 1 : Mengitung DF : 1 1 , 1 1  = 0,9 PV C : 0,9 x 9.159.675 = 8281804 PV B : 0,901 x 40950000 = 37025316 PV B – PV C = 37025316 – 8281804 = 28743513 Akumulasi PV = -263600000 + 28743513 = Rp -23485648 Lampiran 4. Nilai NPV, Net BC, Pay back period dan Gross BC golongan tarif rumah tangga 1300 VA Tahun Biaya C Penerimaan B DF 10 PV C PV B PV B-C Akumulasi PV 263.600.000 1 263600000 -263600000 -263600000 1 9.159.675 49770000 0,909 8326977 45.245.455 36918477 -226681523 2 9.159.675 49770000 0,826 7569979 41.132.231 33562252 -193119271 3 9.159.675 49770000 0,751 6881799 37.392.938 30511138 -162608132 4 9.159.675 49770000 0,683 6256181 33.993.580 27737398 -134870734 5 9.159.675 49770000 0,621 5687438 30.903.254 25215817 -109654917 6 9.159.675 49770000 0,564 5170398 28.093.867 22923470 -86731448 7 9.159.675 49770000 0,513 4700362 25.539.880 20839518 -65891930 8 9.159.675 49770000 0,467 4273056 23.218.072 18945016 -46946913 9 9.159.675 49770000 0,424 3884596 21.107.338 17222742 -29724171 10 9.159.675 58513815 0,386 3531451 22.559.609 19028157 -10696014 11 9.159.675 49770000 0,350 3210410 17.444.081 14233671 3537658 12 9.159.675 49770000 0,319 2918555 15.858.256 12939701 16477359 13 9.159.675 49770000 0,290 2653232 14.416.596 11763365 28240723 14 9.159.675 49770000 0,263 2412029 13.105.997 10693968 38934691 15 9.159.675 49770000 0,239 2192753 11.914.542 9721789 48656480 16 9.159.675 49770000 0,218 1993412 10.831.402 8837990 57494470 17 9.159.675 49770000 0,198 1812193 9.846.729 8034536 65529006 18 9.159.675 49770000 0,180 1647448 8.951.572 7304124 72833130 19 9.159.675 49770000 0,164 1497680 8.137.793 6640113 79473243 20 9.048.000 54416090 0,149 1344928 8.088.605 6743677 86216920 341.564.877 427.781.797 NPV : Rp 86.216.920 Net BC : Total PVB-C tahun ke 1-20 - PVB-C tahun ke 0 : Rp 349816920 - - Rp -263600000 :1,33 Gross BC :PV B PV C : Rp 427.781.797 Rp 341564877 : 1,25 Pay back periode : tahun ke 10-11 Lampiran 5. Nilai IRR golongan tarif rumah tangga 1300 VA Tahun Biaya C Penerimaan B DF 10 PV C PV B PV B-C Akumulasi PV 263.600.000 1 263600000 -263600000 -263600000 1 9.159.675 49.770.000 0,873 7999716 43.467.249 35467533 -228132467 2 9.159.675 49.770.000 0,763 6986652 37.962.663 30976011 -197156456 3 9.159.675 49.770.000 0,666 6101879 33.155.164 27053285 -170103171 4 9.159.675 49.770.000 0,582 5329152 28.956.475 23627323 -146475848 5 9.159.675 49.770.000 0,508 4654281 25.289.498 20635217 -125840632 6 9.159.675 49.770.000 0,444 4064875 22.086.898 18022023 -107818608 7 9.159.675 49.770.000 0,388 3550109 19.289.867 15739758 -92078850 8 9.159.675 49.770.000 0,338 3100532 16.847.045 13746514 -78332336 9 9.159.675 49.770.000 0,296 2707888 14.713.577 12005689 -66326648 10 9.159.675 58.513.815 0,258 2364968 15.107.881 12742913 -53583734 11 9.159.675 49.770.000 0,225 2065474 11.222.957 9157483 -44426252 12 9.159.675 49.770.000 0,197 1803907 9.801.709 7997802 -36428450 13 9.159.675 49.770.000 0,172 1575465 8.560.444 6984980 -29443470 14 9.159.675 49.770.000 0,150 1375952 7.476.371 6100419 -23343052 15 9.159.675 49.770.000 0,131 1201705 6.529.581 5327877 -18015175 16 9.159.675 49.770.000 0,115 1049524 5.702.691 4653167 -13362008 17 9.159.675 49.770.000 0,100 916615 4.980.516 4063902 -9298106 18 9.159.675 49.770.000 0,087 800537 4.349.796 3549259 -5748847 19 9.159.675 49.770.000 0,076 699159 3.798.948 3099790 -2649057 20 9.048.000 54.416.090 0,067 603174 3.627.585 3024411 375353 Internal Rate of Return IRR 14,5 Contoh perhitungan pada tahun ke 1 : Mengitung DF : 1 145 , 1 1  = 0,87 PV C : 0,87 x 9.159.675 = 7999716 PV B : 0,87 x 40950000 = 43.467.249 PV B – PV C = 43.467.249 – 7999716 = 35467533 Akumulasi PV = -263600000 + 35467533 = Rp -228132467 Lampiran 6. Nilai NPV, Net BC, Pay back period dan Gross BC golongan tarif rumah tangga 2200 VA Tahun Biaya C Penerimaa n B DF 10 PV C PV B PV B-C Akumulasi PV 263.600.00 1 26360000 -263600000 -263600000 1 9.159.675 50085000 0,909 8326977 45.531.818 37204841 -226395159 2 9.159.675 50085000 0,826 7569979 41.392.562 33822583 -192572576 3 9.159.675 50085000 0,751 6881799 37.629.602 30747802 -161824774 4 9.159.675 50085000 0,683 6256181 34.208.729 27952548 -133872226 5 9.159.675 50085000 0,621 5687438 31.098.844 25411407 -108460819 6 9.159.675 50085000 0,564 5170398 28.271.677 23101279 -85359540 7 9.159.675 50085000 0,513 4700362 25.701.524 21001163 -64358378 8 9.159.675 50085000 0,467 4273056 23.365.022 19091966 -45266411 9 9.159.675 50085000 0,424 3884596 21.240.929 17356333 -27910079 10 9.159.675 58828815 0,386 3531451 22.681.055 19149604 -8760475 11 9.159.675 50085000 0,350 3210410 17.554.487 14344077 5583602 12 9.159.675 50085000 0,319 2918555 15.958.625 13040070 18623671 13 9.159.675 50085000 0,290 2653232 14.507.840 11854609 30478280 14 9.159.675 50085000 0,263 2412029 13.188.946 10776917 41255198 15 9.159.675 50085000 0,239 2192753 11.989.951 9797197 51052395 16 9.159.675 50085000 0,218 1993412 10.899.955 8906543 59958938 17 9.159.675 50085000 0,198 1812193 9.909.050 8096857 68055795 18 9.159.675 50085000 0,180 1647448 9.008.227 7360779 75416575 19 9.159.675 50085000 0,164 1497680 8.189.298 6691618 82108193 20 9.048.000 54731090 0,149 1344928 8.135.428 6790500 88898693 34156487 7 430.463.57 NPV : Rp 88898693 Net BC : Total PVB-C tahun ke 1-20 - PVB-C tahun ke 0 : Rp 352498693 - - Rp -263600000 :1,34 Gross BC :PV B PV C : Rp 430.463.570 Rp 341564877 : 1,26 Pay back periode : tahun ke 10-11 Lampiran 7. Nilai IRR golongan tarif rumah tangga 2200 VA Tahun Biaya C Penerimaan B DF 10 PV C PV B PV B-C Akumulasi PV 263.600.000 1 263600000 -263600000 -263600000 1 9.159.675 50085000 0,873 7999716 43.742.358 35742642 -227857358 2 9.159.675 50085000 0,763 6986652 38.202.933 31216281 -196641077 3 9.159.675 50085000 0,666 6101879 33.365.007 27263128 -169377949 4 9.159.675 50085000 0,582 5329152 29.139.744 23810592 -145567357 5 9.159.675 50085000 0,508 4654281 25.449.558 20795277 -124772081 6 9.159.675 50085000 0,444 4064875 22.226.688 18161814 -106610267 7 9.159.675 50085000 0,388 3550109 19.411.955 15861846 -90748421 8 9.159.675 50085000 0,338 3100532 16.953.672 13853141 -76895280 9 9.159.675 50085000 0,296 2707888 14.806.701 12098813 -64796468 10 9.159.675 58828815 0,258 2364968 15.189.212 12824244 -51972224 11 9.159.675 50085000 0,225 2065474 11.293.988 9228514 -42743709 12 9.159.675 50085000 0,197 1803907 9.863.745 8059838 -34683872 13 9.159.675 50085000 0,172 1575465 8.614.624 7039160 -27644712 14 9.159.675 50085000 0,150 1375952 7.523.690 6147738 -21496974 15 9.159.675 50085000 0,131 1201705 6.570.908 5369203 -16127771 16 9.159.675 50085000 0,115 1049524 5.738.784 4689260 -11438511 17 9.159.675 50085000 0,100 916615 5.012.039 4095424 -7343087 18 9.159.675 50085000 0,087 800537 4.377.326 3576789 -3766298 19 9.159.675 50085000 0,076 699159 3.822.992 3123834 -642464 20 9.048.000 54731090 0,067 603174 3.648.584 3045410 2402946 Internal Rate of Return IRR 14,5 Contoh perhitungan pada tahun ke 1 : Mengitung DF : 1 146 , 1 1  = 0,873 PV C : 0,873 x 9.159.675 = 7999716 PV B : 0,87 3x 50085000 = 43.742.358 PV B – PV C = 43.742.358 – 7999716 = 35742642 Akumulasi PV = -263600000 + 35742642 = Rp -227857358 Lampiran 8a. Perhitungan biaya per kWh yang seharusnya dibayar masyarakat 365 rptahun l operasiona biaya + tetap Biaya = rphari hari per Biaya = 365 tahun 5.466.000 tahun 33.429.899  = Rp 106.564 hari Harga kWh = Rp 1.015 kWh Lampiran 8b. Contoh perhitungan biaya per kWh yang dibayar masyarakat dari hasil kuesioner Untuk tarif Rp 15.000 bulan Harga per kWh = 30 7 15 000 . 15   kW jam = 4,76 kWh arg hari jam daya faktor x kW terpasang Daya hari per Biaya kWh a H  hari jam x kW kWh a H 15 7 hari 106.564 Rp arg  Lampiran 9 Nilai NPV, Net BC, Pay back period dan Gross BC Alsin pengolahan kopi Tahun Biaya C Penerimaan B DF 10 PV C PV B PV B- C Akumulasi PV 29.000.000 1 29000000 - 29000000 -29000000 1 21.510.000 60.000.000 0,909 19554545 54.545.455 34990909 5990909 2 21.510.000 60.000.000 0,826 17776860 49.586.777 31809917 37800826 3 21.510.000 60.000.000 0,751 16160781 45.078.888 28918107 66718933 4 21.510.000 60.000.000 0,683 14691619 40.980.807 26289188 93008121 5 21.510.000 60.000.000 0,621 13356018 37.255.279 23899262 116907383 6 21.510.000 60.000.000 0,564 12141834 33.868.436 21726602 138633984 7 21.510.000 60.000.000 0,513 11038031 30.789.487 19751456 158385440 8 21.510.000 60.000.000 0,467 10034574 27.990.443 17955869 176341309 9 21.510.000 60.000.000 0,424 9122340 25.445.857 16323517 192664827 10 21.510.000 62.900.000 0,386 8293036 24.250.673 15957637 208622463 11 21.510.000 60.000.000 0,350 7539124 21.029.634 13490510 222112974 12 21.510.000 60.000.000 0,319 6853749 19.117.849 12264100 234377074 13 21.510.000 60.000.000 0,290 6230681 17.379.863 11149182 245526256 14 21.510.000 60.000.000 0,263 5664255 15.799.875 10135620 255661876 15 21.510.000 60.000.000 0,239 5149323 14.363.523 9214200 264876076 16 21.510.000 60.000.000 0,218 4681203 13.057.748 8376545 273252621 17 21.510.000 60.000.000 0,198 4255639 11.870.680 7615041 280867662 18 21.510.000 60.000.000 0,180 3868763 10.791.527 6922765 287790427 19 21.510.000 60.000.000 0,164 3517057 9.810.479 6293423 294083850 20 21.510.000 60.000.000 0,149 3197324 8.918.618 5721293 299805143 212126756 511.931.899 NPV :Rp 44.398.232 selama dua puluh tahun Net BC : Total PVB-C tahun ke 1-20 - PVB-C tahun ke 0 : Rp 328805143 - -29.000.000 : 11,3 Gross BC : PV B PV C :Rp 511.931.899 212.126.756 : 2,4 Payback periode tahun 1 Lampiran 10. Perhitungan titik impas produksi kopi = 4.723 kg tahun tahun per produksi tetap tidak biaya a h tetap Biaya T   arg kg kg T 12000 tahun 16.000.000 500 . 2 tahun 5.510.000   Lampiran 11. Rekapan data hasil kuisioner No Nama Keluarga Jum lah Keluarga orang Pengha silan Rp bulan Sumber Energi sebelum mikrohidro Biaya Iuran Mikrohidro Rp Peralatan Listrik 1 Umi 3 300.000 -600.000 Turbin, lampu minyak 13.000 Lampu 25 watt, setrika 2 Rati 1 Lampu minyak 11.000 Lampu 5 watt 3 Mariati 2 100.000 -200.000 Turbin, lampu minyak 17.000 v, parabola, lampu 7 watt dan 25 watt 4 Amusah 3 200.000 -300.000 Turbin, lampu minyak 17.000 Lampu 25 watt tv, parabola 5 Tunasih 4 100.000 -200.000 Lampu minyak 13.000 Lampu 25 watt, magic jar 6 Aminah 4 650.000 Turbin, lampu minyak 13.000 Lampu 25 watt, magic jar 7 Adna 7 300.000 Turbin, lampu minyak 13.000 Tv, lampu 25 watt 8 Djuhari 4 300.000 -500.000 Turbin, lampu minyak 15.000 Tv, setrika, lampu 25 watt 9 Abah Sadaih 5 Turbin, lampu minyak 13.000 Lampu, setrika 10 Heni 2 100.000 Lampu minyak 11.000 Lampu 11 Nurfiah 4 100.000 Turbin, lampu minyak 17.000 Tv, lampu 5 watt 12 Surtini 5 Turbin, surya 17.000 Tv, setrika, lampu 5 watt 13 Mur 4 200.000 Turbin, lampu minyak 15.000 Radio, lampu, vcd player, setrika, speaker 14 Tini 4 300.000 Turbin, lampu minyak 17.000 Tv, lapu, setrika, speaker, magic jar, vcd player 15 Unang 4 300.000 Turbin, lampu minyak 17.000 Tv, lampu, magic jar, setrika 16 Ijah 5 300.000 Turbin, surya, lampu minyak 1.7000 Tv, lampu, magic jar, setrika 17 Inah 2 500.000 Turbin, lampu minyak 25.000 Lampu, kulkas, tv, magic com, setrika, mesin cuci, speaker, vcd player 18 Nani 2 500.000 Kayu bakar, surya 17.000 Lampu, magic com, setrika, tv, vcd player 19 Ela 3 500.000 Turbin, lampu minyak 21.000 Lampu, tv, magic com, kulkas, setrika 20 Ida 1 Kayu bakar, lampu minyak 17.000 Lampu, tv, magic com, vcd player 21 Amah 2 100.000 Lampu minyak 11.000 Lampu 5 watt 22 Suparni 4 100.000 Turbin, surya 17.000 Tv, lampu, magic com, setrika, speaker, vcd player Lampiran 11 Rekapan data hasil kuisioner lanjut No Nama Keluarga Jum lah Keluarga orang Pengha silan Rp bulan Sumber Energi sebelum mikrohidro Biaya Iuran Mikrohidro Rp Peralatan Listrik 23 Sukanta 4 200.000 Surya, lampu minyak 15.000 Lampu, setrika, tv 24 Otih 3 50.000- 100.000 Surya, lampu minyak 11.000 Lampu 25 Massan 5 20.000- 25.000 Lampu minyak 15.000 Tv, lampu 26 Minasih 4 100.000 Turbin, lampu minyak 17.000 Tv, lampu, vcd plsyer, setrika, sound system 27 Suparti 3 1.000.0 00 Turbin, surya, lampu minyak 17.000 Tv, lampu, setrika, magic jar 28 Murna 4 200.000 Turbin, surya, lampu minyak 17.000 Lampu 5 watt 29 Acih 5 Surya, minyak tanah 11.000 Lampu 5 watt 30 Artaena 5 200.000 Turbin, surya 17.000 Tv, lampu, dvd player, speaker 31 Endah 3 100.000 -200.000 Bara 17.000 Tv, lampu, vcd player, setrika, magic jar 32 Sujana 4 100.000 Surya 15.000 Tv, lampu, setrika 33 Heni 4 200.000 Turbin, surya 17.000 Tv, lampu, hitter, setrika, magic jar, vcd player 34 Aheni 4 100.000 Surya, minyak tanah 17.000 Tv, lampu, magic jar 35 Ramasi h 3 250.000 Surya, lampu minyak 17.000 Tv, lampu, magic com, setrika, vcd player 36 Nurjann ah 3 320.000 Surya, minyak tanah 17.000 Tv, lampu, magic com, setrika, vcd player 37 Yuyun 3 150.000 Surya, minyak tanah 11.000 Lampu, magic com 38 Misjaya 3 300.000 Turbin, surya 15.000 Tv, lampu 39 Ipay 3 700.000 Turbin, minyak tanah 15.000 Tv, lampu, magic jar, setrika, vcd player 40 Nurheni 2 Lampu minyak 11.000 Tv, lampu 41 Suhoma 3 Lampu minyak 11.000 Lampu 42 Uhen 5 Surya 11.000 Lampu 43 Asia 4 300.000 Surya 17.000 Tv, lampu, magic jar, hitter, vcd player, setrika, speaker 44 Yanah 4 100.000 Turbin, lilin 15.000 Tv, vcd player, speaker, lampu setrika Lampiran 11 Rekapan data hasil kuisioner lanjut No Nama Keluarga Jum lah Keluarga orang Pengha silan Rp bulan Sumber Energi sebelum mikrohidro Biaya Iuran Mikrohidro Rp Peralatan Listrik 45 Karsiah 4 25.000 Lampu minyak 11.000 Lampu 46 Sapni 4 300.000 Turbin, lampu minyak 17.000 Tv, spaker, vcd player, setrika, lampu 47 Marfudin 2 Turbin, lampu minyak Tidak member iuran karena sudah member lahan untuk rumah mikrohidro Tv, lampu, vcd player 48 Nimah 5 Surya 15.000 Tv, lampu 49 Subari 3 Turbin, surya 15.000 Tv, lampu 50 Nardi 3 Minyak tanah 11.000 Tv, lampu, radio 51 artasih 5 Surya, minyak tanah 15.000 Tv, lampu, setrika 754.000 ANALISIS TEK DESA MANDIRI E HEGARMANAH, CIB FAKUL INS EKNO EKONOMI MIKROHIDRO UNT ENERGI DI KAMPUNG LEBAKCIPUN IBEBER, DAN LEBAK PROVINSI BAN SKRIPSI HABLINUR AL-KINDI F14061699 LTAS TEKNOLOGI PERTANIAN STITUT PERTANIAN BOGOR BOGOR 2011 TUK UNG, ANTEN TECHNO-ECONOMIC ANALYSIS OF MICRO HYDRO AT ENERGY SELF-SUFFICIENT VILLAGE OF KAMPUNG LEBAKPICUNG, HEGARMANAH, CIBEBER, LEBAK, BANTEN PROVINCE Hablinur Al-Kindi and I Dewa Made Subrata, Yohanes Aris Purwanto Department of Mechanical And Biosystem Engineering, Faculty of Agricultural Technology, Bogor Agricultural University, IPB Dramaga Campus, PO Box 220, Bogor, West Java, Indonesia. Phone 62 22 7804529, e-mail: alkindi_thegreatyahoo.co.id ABSTRACT Model of Energy Independent Village based on micro hydro has been implemented in Kampung Lebakpicung, Hegarmanah, Cibeber, Lebak, Banten Province. This area located directly adjacent to the National Park area of Halimun Salak Mountain. Three main issues have been proposed in the development of energy independent village based on micro hydro namely providing the electricity for local community, developing economic productive using the idle electricity as well as coserving the forest area near village through reforestration. All of three issues have been running well since 2 years ago and this program was strongly supported by local community. Institution based on the local community initiative has also been developed to take responsibility on the sustainability of micro hydro project. This institution has responsibility to run the operational of the micro hydro and to develop the utilization of idle electricity during day time for productive economic activity for local community. The objectives of this study were: 1 to analyze cost of electricity produced by micro hydro. The cost analysis includes kW of electricity could be generated and the price per kW which was based on the operational cost and maintenance cost, 2. to determine the energy cost must be spent by households before and after micro hydro project. Maintenance and operational cost was analyzed in order to consider the cost must be paid by each household. The study was focused on the collection of data i.e. social economic, potency of electricity, technical data of micro hydro. It was found that the potency of micro hydro power plant was 25-74 kW. The cost of electricity from micro hydro power plant was Rp 1.015kWh. This price was higher than that price of electricity supplied by National Electricity Company with subsidy scheme of 450 Watt, i.e Rp. 415kWh. The price of electricity that paid by the community was Rp. 239kWh. If it was assumed that initial cost for installation of micro hydro power plant was under scheme of grant through CSR Corporate Social Responsibility of Natioanal Electriocity Company PT PLN, it was resulted the nett present value NPV was Rp. 16.578.189,- at year of 20, payback period at year between 15 to 16. Net BC was 1,1 and Gross BC was 1,07 with IRR at 11 percent. BEP of electricity produced by micro hydro power plant was 162.744 kWyear. Utilization of the idle electricity produced by micro hydro power plant at Kampung Lebakpicung during day time could be considered by installing the small scale coffee processing unit. Key word: energy independent village. micro hydro, cost of electricity, coffee processing HABLINUR AL-KINDI F14061699. ANALISIS TEKNO EKONOMI MIKROHIDRO UNTUK DESA MANDIRI ENERGI DI KAMPUNG LEBAKCIPUNG, HEGARMANAH, CIBEBER, DAN LEBAK PROVINSI BANTEN. Dibawah bimbingan I Dewa Made Subrata dan Yohanes Aris Purwanto.2011 RINGKASAN Pemanfaatan energi terbarukan berupa pembangkit listrik tenaga mikrohidro PLTMH, merupakan salah satu solusi untuk menerangi desa yang masih gelap. Selain itu, dengan adanya PLTMH di sebuah desa, diharapkan akan mengembangkan desa tersebut menjadi desa mandiri energi. Karena PLTMH dapat mengembangkan potensi ekonomi di suatu desa. Kampung Lebakpicung berada di kabupaten Lebak, Provinsi Banten. Kampung ini berada dekat dengan Taman Nasional Gunung Halimun. Sehingga akses menuju kesana sangat sulit dan listrik dari Perusahaan Listrik Negara PLN belum dapat dinikmati oleh penduduk disana. Pembangunan PLTMH di Kampung Lebakpicung merupakan program corporate social responsibility CSR PLN yang bekerja sama dengan Pusat Penelitian Lingkungan Hidup PPLH IPB. PLTMH telah berjalan selama satu tahun dan masyarakat Kampung Lebakpicung telah bisa memanfaatkanya. Tujuan penelitian ini adalah untuk menghitung tarif lisrik dalam rupiah per kWh yang harus dibayar. Metode yang dilakukan adalah dengan membagikan kuisioner kepada masyarakat. Isi kusesioner tersebut antara lain pendapatan per bulan, tarif listrik yang dibayar, barang elektronik yang dipunyai, sumber energi sebelum ada mikrohidro dan kesan terhadap pembangunan mikrohidro. Tarif per bulan yang digunakan berdasarkan jumlah jenis barang elektronik yang dipunyai setiap rumah tangga.Total semua iuran adalah RP 754.000 per bulan. Setelah dihitung analisis biayanya pembangunan PLTMH di Kampung Lebakpicung tidak layak untuk bisnis, dikarenakan iuran yang dibayar sangat kecil hanya sebesar Rp 239 kWh yang seharusnya Rp 1.015kWh. Hal ini disebabkan besarnya biaya awal sebesar Rp 263.600.000 dan biaya perbaikan sebesar Rp 5.466.000 per tahun Akan tetapi pembangunan PLTMH dimaksudkan untuk memberikan pelayanan listrik pada Kampung Lebakpicung maka masyrakat tidak wajib membayarnya. Dalam perhitungan NPV, IRR, dan Payback period dilakukan dengan membuat asumsi. Tarif listrik golongan pelayanan social 2200 VA, tarif listrik untuk rumah tangga 1300 VA dan 2200 VA dianggap sebagai pemasukan benefit dan tarif PLTMH sebagai pengeluaran cost. Tujuan pengasumsian untuk mengetahui keuntungan yang didapat oleh masayarakat Kampung Lebakpicung dibanding dengan tarif PLN. Untuk golongan tarif rumah tangga 2200 VA diadapat nilai NPV Rp 88.898.000, IRR 14,6 dan Payback Period 10 hingga 11 tahun Salah satu ciri desa mandiri energi adalah desa tersebut mandiri dalam bidang ekonomi. Kampung Lebakpicung memiliki komoditas khas yaitu kopi. Alat mesin pengolahan yang dibeli adalah mesin sangrai kopi dan pembubuk yang menggunakan energi listrik. Setelah dihitung analisis biaya, harga kopi pokok kopi sbesar Rp 2.200kg., NPV pada tahun ke 20 sebesar Rp 29.9805143, dan titk impas sebesar 4.723 kg tahun. I. PENDAHULUAN LATAR BELAKANG Salah satu ciri dari negara besar adalah negara yang mandiri akan kebutuhan energi listirk nya. Kebutuhan energi listrik merupakan kebutuhan yang vital bagi masyarakat. Energi listrik merupakan bentuk energi yang sering digunakan oleh masyarakat. Indonesia memiliki sumber energi terbarukan renewable energy diantaranya adalah energi bersumber dari cahaya matahari, panas bumi, angin dan air. Pengadaan energi listrik di pedesaan bukan hanya memberikan energi bagi kebutuhan rumah tangga akan tetapi dapat meningkatkan penghasilan rumah tangga dengan memproduksi suatu produk dari desa tersebut. Penyediaan energi terbarukan bagi masyarakat pedesaan dan daerah terpencil antara lain karena: 1 lokasi sumberdaya energi terbarukan umumnya berada di pedesaan dan desa terpencil, 2 penyediaan energi konvensional di daerah ini memerlukan biaya tinggi terutama karena biaya distribusi yang relatif tinggi, 3 mengurangi ketergantungan pada bahan bakar fosil, dan 4 pemanfaatan energi terbarukan tidak hanya untuk menyediakan energi bagi keperluan rumah tangga akan tetapi juga untuk menambah penghasilan rumah tangga dengan memperkenalkan dan mengimplementasikan kegiatan-kegiatan atau usaha untuk menambah penghasilan Salim, 2009. Desa Mandiri Energi adalah desa yang dapat mandiri dalam penyediaan energi sehingga desa tersebut dapat mecinptakan lapangan kerja sehingga mengurangi pengangguran di desa tersebut. Tujuan utama pengembangan Desa Mandiri Energi adalah pengurangan kemiskinan dan membuka lapangan kerja serta untuk mensubstitusi bahan bakar minyak Keberadaan Desa Mandiri Energi diperlukan agar para penduduk desa tidak pergi ke kota karena kurangnya pekerjaan di desa. Dengan Desa Mandiri Energi, suatu desa akan mempunyai satu, dua atau lebih produk yang dapat dijual dengan kuantitas yang banyak dan kualitas yang baik. Desa Mandiri Energi akan mengurangi biaya distribusi bahan bakar ke desa-desa yang memerlukan biaya yang besar. Jika desa tersebut terdapat di dekat Taman Nasional, maka akan mengurangi penggunaan kayu bakar dalam pemenuhan energi masyarakat disana. Sampai saat ini pemanfaatan sumber-sumber energi terbarukan masih belum maksimal dan baru termanfaatkan sekitar 3.3 dari potensi sebesar 162.2 GWe Blue Print Pengelolaan Energi Nasional, 2005. Pembangunan infrastruktur jaringan listrik untuk daerah-daerah yang terpencil memerlukan investasi yang besar. Sementara kebutuhan listrik di daerah yang padat penduduknya semakin meningkat sejalan dengan meningkatnya aktivitas ekonomi dan bertambahnya penduduk sehingga pemerintah juga harus menyediakan tambahan daya listrik untuk memenuhi kebutuhan tersebutPembangunan energi bersakla kecil adalah alternatif untuk menyediakan energi listrik di perdesaan. Salah satu nya adalah pembutan mikrohidro bagi desa yang berdekatan dengan aliran sungai yang deras. Mikrohidro adalah suatu pembangkit listrik skala kecil yang menggunakan tenaga air sebagai tenaga penggeraknya seperti, saluran irigasi, sungai atau air terjun alam dengan cara memanfaatkan tinggi terjunan head dan jumlah debit air . Pembangkit Listrik Tenaga Mikrohidro PLTMH dapat di buat di desa-desa yang jauh dari akses jalan. Dengan menggunakan tenaga aliran air disungai atau air terjun, PLTMH dapat memberikan listrik yang cukup bagi masyarakat dan dapat meningkatkan kegiatan ekonomi. PLTMH berfungsi juga untuk mengalihakan penebangan hutan atau perusakan hutan untuk memenuhi kebutuhan energi untuk memasak. Model Desa Mandiri Energi Berbasis Mikro Hidro telah dilaksanakan di daerah yang berbatasan langsung dengan Taman Nasional Gunung Halimun-Salak. Pengembangan mikro hidro di area ini harus didukung dengan keberlanjutan operasionalnya. Dengan demikian, keberlanjutan operasi dan pemeliharaan mikrohidro menjadi isu utama. Berdasarkan pertimbangan tersebut, maka perlu diketahui: 1 berapa biaya yang harus dikeluarkan oleh masyarakat untuk akses energi listrik tersebut, 2 berapa biaya operasional dan pemeliharaan agar keberlanjutan mikrohidro tersebut dapat dipertahankan. Desa mandiri energi ini terdapat di Kampung Lebakpicung terdiri dari sebuah rukun tetangga RT 1 yang secara administratif masuk ke dalam RW 04, Desa Hegarmanah, Kecamatan Cibeber gambar 1, Kabupaten Lebak, Provinsi Banten . Gambar satu adalah peta kecamatan cibeber yang berada di dekat Taman Nasional Gunung Salak. Pengoperasian mikrohidro di desa ini sudah berjalan satu tahun yang lalu. Pengadaan mikrohidro di kampung lebakpicung atas alternatif badan Pengajian Pemeliharaan Lingkungan Hidup PPLH IPB yang dan di danai oleh Perusahaan Listrik Negara PLN. Pengadaan PLTMH ini diahrapkan dapat mengemabngakn potensi ekonomi yang ada di kampung ini yaitu kopi dan gula aren. Setelah adanya PLTMH di kampung Lebakpicung perlu penelitian lanjutan salah satunya tentang pengemabangan ekonomi. Iuran masyarakat yang sudah di tetapkan perlu dikaji lagi agar keberadaan PLTMH di Kampung Lebakpicung dapat bertahan lama dan dimanfaatkan sebaiknya oleh warga Kampung Lebak picung. Hal ini disebabkan iuran yang di tetapkan masih bersifat sementara dan belum disesuaikan dengan kebutuhan perawatan PLTMH setiap bulanya. . Pembutan PLTMH yang dilakukan kurang lebih setahun yang lalu adalah kerjasama antara Perusahaan Listrik Negara PLN dan Badan Pusat Penelitian Lingkungan Hidup PPLH Institut Pertanian Bogor. Sebelum peneitian ini, tim sebeluimnya telah mengidentifikasi lokasi penempatan PLTMH untuk Kampung Lebakpicung , menngukur debit maksimum dan minimum, dan pembuatan PLTMH. Gambar 1. Peta kecamatan Cibeber Setelah dibuatnya PLTMH di Kampung Lebakpicung perlu dinalisis tentang biaya energi per kWh agar diketahui apakah PLTMH di Kampung Lebakpicung menguntungkan bagi masyarakat atau tidak dan jumlah daya listrik yang dihasilkan oleh PLTMH apakah dapat digunakan untuk kegiatan ekonomi. Sehingga keberadaan PLTMH di Kampung Lebakpicung dapat meningktatkan pendapatan setiap rumah tangga disana. Tekno ekonomi adalah Perpaduan sinergi aspek-aspek teknologi, ekonomi, sosial dan budaya untuk meningkatkan optimalisasi, efisiensi dan efektivitas dalam pengembangan sumber daya alam. Analisis tekno ekonomi yang akan dilakukan adalah analisis keberadaan teknologi PLTMH terhadap sosial penduduk Kampung Lebakpicung, beserta biaya pengembangan teknologi PLTMH berupa unit pengolahan kopi. TUJUAN Tujuan dari penelitian ini adalah : 1 Menghitung potensi daya PLTMH di Kampung Lebakpicung 2 Menganalisis biaya energi yang harus dikeluarkan oleh rumah tangga sebelum dan seseudah adanya listrik mikro hidro, 3 Menghitung biaya listrik yang diproduksi oleh mikrohidro. Analisis biaya mencakup daya listrik kW yang diproduksi dan harga per kW yang berdasarkan pada biaya operasional dan pemeliharaan 4 Menghitung nilai NPV, IRR, dan Payback period 5 Membuat perencanaan awal pembuatan unit kopi di Kampung Lebakpicung II. TINJAUAN PUSTAKA

2.1 PEMBANGKIT LISTRIK TENAGA AIR

Energi air adalah energi yang telah dimanfaatkan secara luas di Indonesia yang dalam skala besar telah digunakan sebagai pembangkit listrik. Pemanfaatan energi air pada dasarnya adalah pemanfaatan energi potensial gravitasi. Energi mekanik aliran air yang merupakan transformasi dari energi potensial gravitasi dimanfaatkan untuk menggerakkan turbin atau kincir. Umumnya turbin digunakan untuk membangkitkan energi listrik sedangkan kincir untuk pemanfaatan energi mekanik secara langsung dan dari energi mekanik tersebut dikonversi menjadi energi listrik. Pada umumnya untuk mendapatkan energi mekanik aliran air ini, perlu beda tinggi air yang diciptakan dengan menggunakan bendungan. Akan tetapi dalam menggerakkan kincir, aliran air pada sungai dapat dimanfaatkan ketika kecepatan alirannya memadai anonim,2004. Pemanfaatan energi air dalam skala kecil dapat berupa penerapan kincir air dan turbin. Dikenal ada tiga jenis kincir air berdasarkan sistem aliran airnya, yaitu : overshot, breast-shot, dan under-shot. Pada kincir overshot, air melalui atas kincir dan kincir berada di bawah aliran air. Air memutar kincir dan air jatuh ke permukaan lebih rendah. Kincir bergerak searah jarum jam. Pada kincir breast-shot, kincir diletakkan sejajar dengan aliran air sehingga air mengalir melalui tengah-tengah kincir. Air memutar kincir berlawanan dengan arah jarum jam. Pada kincir under-shot, posisi kincir air diletakkan agak ke atas dan sedikit menyentuh air. Aliran air yang menyentuh kincir menggerakkan kincir sehingga berlawanan arah dengan jarum jam. Pemanfaaan enegi listrik skala kecil dengan menggunakan turbin contohnya adalah mikrohidro.

2.2 MIKROHIDRO

Mikrohidro atau yang dimaksud dengan Pembangkit Listrik Tenaga Mikrohidro PLTMH, adalah suatu pembangkit listrik skala kecil yang menggunakan tenaga air sebagai tenaga penggeraknya seperti, saluran irigasi, sungai atau air terjun alam dengan cara memanfaatkan tinggi terjunan head dan jumlah debit air. Mikrohidro merupakan sebuah istilah yang terdiri dari kata mikro yang berarti kecil dan hidro yang berarti air. Secara teknis, mikrohidro memiliki tiga komponen utama yaitu air sebagai sumber energi, turbin, dan generator. Mikrohidro mendapatkan energi dari aliran air yang memiliki perbedaan ketinggian tertentu. Pada dasarnya, mikrohidro memanfaatkan energi potensial jatuhan air head. Semakin tinggi jatuhan air maka semakin besar energi potensial air yang dapat diubah menjadi energi listrik. Di samping faktor geografis tata letak sungai, tinggi jatuhan air dapat pula diperoleh dengan Gambar 2. Contoh turbin pada mikrohidro tipe open flume membendung aliran air sehingga permukaan air menjadi tinggi. Air dialirkan melalui sebuah pipa pesat kedalam rumah pembangkit yang pada umumnya dibagun di bagian tepi sungai untuk menggerakkan turbin atau kincir air mikrohidro. Energi mekanik yang berasal dari putaran poros turbin akan diubah menjadi energi listrik oleh sebuah generator. Mikrohidro bisa memanfaatkan ketinggian air yang tidak terlalu besar, misalnya dengan ketinggian air 2.5 meter dapat dihasilkan listrik 400 watt. Relatif kecilnya energi yang dihasilkan mikrohidro dibandingkan dengan PLTA skala besar, berimplikasi pada relatif sederhananya peralatan serta kecilnya areal yang diperlukan guna instalasi dan pengoperasian mikrohidro. Hal tersebut merupakan salah satu keunggulan mikrohidro, yakni tidak menimbulkan kerusakan lingkungan. Perbedaan antara Pembangkit Listrik Tenaga Air PLTA dengan mikrohidro terutama pada besarnya tenaga listrik yang dihasilkan, PLTA dibawah ukuran 100 KW digolongkan sebagai mikrohidro. Dengan demikian, sistem pembangkit mikrohidro cocok untuk menjangkau ketersediaan jaringan energi listrik di daerah-daerah terpencil dan pedesaan Soetarno, 1975. Beberapa keuntungan yang terdapat pada pembangkit listrik tenaga listrik mikrohidro adalah sebagai berikut Soetarno, 1975: a. Dibandingkan dengan pembangkit listrik jenis yang lain, PLTMH ini cukup murah karena menggunakan energi alam. b. Memiliki konstruksi yang sederhana dan dapat dioperasikan di daerah terpencil dengan tenaga terampil penduduk daerah setempat dengan sedikit latihan. c. Tidak menimbulkan pencemaran. d. Dapat dipadukan dengan program lainnya seperti irigasi dan perikanan. e. Dapat mendorong masyarakat agar dapat menjaga kelestarian hutan sehingga ketersediaan air terjamin. Alasan-alasan pemasangan PLTMH antara lain Soetarno, 1975 : a. Di daerah itu ada potensi aliran air yang dapat dimanfaatkan untuk pembangkit listrik. b. Daerah itu sulit atau jauh untuk dicapai jaringan PLN. Dan kalaupun dipasang biayanya akan mahal. c. Daerah tersebut berpenduduk maju dalam segala bidang baik pertanian, peternakan, perindustrian ringan, pendidikan, dan lain sebagainya. Ada persyaratan-persayratan yang harus dipenuhi untuk membangun PLTMH, yaitu persyaratan teknik sipil, teknik listrik, ekonomi dan politik, dan persayratan biaya Soetarno, 1975. Persyaratan teknik sipil sangat penting karena mempengaruhi dan menentukan besarnya biaya, sulit atau tidaknya pembangunan PLTMH dianggap menguntungkan apabila pekerjaan sipilnya maksimum 30 dari seluruh biaya. Maka dari itu, di dalam menentukan lokasi sentral harus diadakan peninjauan dan penelitian terhadap keadaan topografi, keadaan hidrologi,, keadaan tinggi jatuh air head, dan keadaan bahan bangunan dan tenaga kerja. Penelitiaan keadaan topografi Untuk mengetahui situasi tanah, apakah berbukit-bukit, landai, lereng-lereng dan sebagainya. Peninjauan dan penelitian keadaan hidrologi dipandang penting sekali, karena harus dipastikan bahwa aliran saluran pengairan tetap konstan mengalir selama minimum 5 tahun. Peninjauan meliputi hidrologi meliputi : a. Kondisi sumber air dengan situasi sekitarnya, curah hujan rata-rata setiap tahun serta lainya yang secara langsung atau tidak langsung mempengaruhi banyak sedikitnya air. b. Kondisi air sungai apakah mengandung kapur, belerang, zat besi, atau air tersebut mengandung zat-zat lain, serta air tersebut tawar atau tidak dan sebagainya. c. Pengukuran debit air sungai mata air. d. Bila air sungai diperhatikan apakah air dari sungai tersebut setelah atau sebelum untuk mengairi sawah. Keadaan tinggi jatuh air head perlu diperhatikan apakah terjunan terbuat dari air alam atau buatan. Juga perlu ditinjau kemiringan sungai, karean hal ini akan berguna dalam peninjauan lebih lanjut kemungkinan penambahan head.. keadaan bahan bangunan dan tenaga kerja apakah cukup tersedia di daerah tersebut, atau harus mendatangkan dari daerah lain. Persayratan teknik listrik yang perlu diperhatikan dalam menentukan efesien atau tidaknya suatu PLTMH di bangun disuatu daerah adalah : a. Jarak anatara sumber air sentral listrik dengan daerah yang akan diberi tenaga listrik tidak begitu jauh. b. Daerah yang akan diberi tenaga listrik mempunyai banyak rumah yang tetap c. Baik atau tidaknya daerah tersebut untuk dilalui jaringan distribusi tenaga listrik. d. Daerah tersebut belum mendapat tenaga listrik dari PLN. e. Adanya distribusi rakyat atau setelah adanya tenaga lsitrik, industri berkembang. Persyaratan ekonomi dan politik di suatu daerah desa berfungsi melengkapi persyaratan teknik. Persyaratan ini adalah analisa dan penelitian tentang bagaimana keadaan prasarana, keadaan demografinya, keadaan kesuburan dan pengolahan tanah, dan Pemilikan tanah dibanding dengan jumlah penduduk. Keadaan prasarana yang meliputi : a. Keadaan perumahan penduduk. b. Penghasilan penduduk, yaitu kemampuan penduduk untuk memperguanakan enaga listrik. c. Keadaan pendidikan umum, agama dan kesehatan. Keadaan demografinya yang meliputi jumlah penduduk, baik laki-laki maupun perempuan, baik orang dewasa maupun anak-anak, dan jumlah kelahiran dan kematian rata-rata tiap tahun. Untuk saat ini perlu dipertimbangkan apakah darerah yang akan didirikan PLTMH ini mampu atau tidak ikut membiayai pembangunan PLTMH tersebut. Dengan sendirinya prioritas akan diberikan pada daerah yang mampu dan diharapkan modal bisa kembali. Akan teteapi bila di pandang dari segi sosial politik sangat perlu, maka pemerintah pusat langsung medidirkan PLTMH di daerah yang dikehendaki. Membiayai suatu PLTMH ada perbandingan harga yang bisa diapakai dari 100 total biaya pembangunan PLTMH. Bangunan sipil 25 dari biaya total, pembangkit 30 dari biaya total, dan transmisi 45 dari biaya total. Apabila perbandingan pembiayaan PLTMH tersebut teralu jauh meleset, bisa ditunda pelaksanaanya Beberapa komponen yang digunakan untuk Pembangkit Listrik Tenaga Mikrohidro baik komponen utama maupun bangunan penunjang, antara lain Anonim,2004: a. DamBendungan Pengalih intake. Dam pengalih berfungsi untuk mengalihkan air melalui sebuah pembuka di bagian sisi sungai ke dalam sebuah bak pengendap. b. Bak Pengendap Settling Basin. Bak pengendap digunakan untuk memindahkan partikel- partikel pasir dari air. Fungsi dari bak pengendap adalah sangat penting untuk melindungi komponen-komponen berikutnya dari dampak pasir. c. Saluran Pembawa Headrace. Saluran pembawa mengikuti kontur dari sisi bukit untuk menjaga elevasi dari air yang disalurkan. d. Pipa Pesat Penstock. Penstock dihubungkan pada sebuah elevasi yang lebih rendah ke sebuah roda air, dikenal sebagai sebuah turbin. e. Turbin. Turbin berfungsi untuk mengkonversi energi aliran air menjadi energi putaran mekanis. f. Pipa Hisap. Pipa hisap berfungsi untuk menghisap air, mengembalikan tekanan aliran yang masih tinggi ke tekanan atmosfer. g. Generator. Generator berfungsi untuk menghasilkan listrik dari putaran mekanis.