Market risk SIGNIFICANT AGREEMENTS Continued

2014 ANNUAL REPORT PT TOWER bERSAMA INFRASTRUCTURE Tbk 206 These Consolidated Financial Statements are Originally Issued in Indonesian Language Ekshibit E93 Exhibit E93 PT TOWER BERSAMA INFRASTRUCTURE Tbk DAN ENTITAS ANAK CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN UNTUK TAHUN YANG BERAKHIR 31 DESEMBER 2014 Disajikan dalam jutaan Rupiah, kecuali dinyatakan lain PT TOWER BERSAMA INFRASTRUCTURE Tbk AND SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED 31 DECEMBER 2014 Expressed in million Rupiah, unless otherwise stated 41. MANAJEMEN RISIKO KEUANGAN Lanjutan

41. FINANCIAL RISK MANAGEMENT Continued

a. Risiko pasar Lanjutan

a. Market risk Continued Risiko Nilai Tukar Mata Uang Asing Lanjutan

Foreign Exchange Rate Continued Sebagai hasil dari kontrak tersebut, Perusahaan dan entitas anak yakin bahwa Perusahaan dan entitas anak telah mengurangi beberapa risiko nilai tukar mata uang asing, meskipun aktivitas lindung nilai yang dilakukan oleh Perusahaan dan entitas anak tidak mencakup seluruh eksposur mata uang asing dan terdapat kemungkinan bahwa perjanjian pengganti atas aktivitas lindung nilai tersebut tidak tersedia pada saat kontrak lindung nilai tersebut telah selesai. As a result of these contracts, the Company and subsidiaries believe that the Company and subsidiaries have reduced some of the risk of foreign currency exchange rates, although hedging activity undertaken by the Company and subsidiaries do not include all foreign currency exposure and there is the possibility that a replacement agreement over the hedges are not available at the time of the hedge contract has been completed. Pada tanggal 31 Desember 2014, jika Rupiah menguat 1 terhadap Dolar Amerika Serikat namun seluruh variabel lainnya tetap, maka laba periode berjalan lebih tinggi sebesar Rp 45.033 2013 : Rp 93.251 terutama yang timbul sebagai akibat keuntungan selisih kurs atas penjabaran aset dan liabilitas moneter dalam mata uang asing. On 31 December 2014, if the Rupiah had strengthened by 1 against the US Dollar with all other variables held constant, profit for the period would have been Rp 45,033 2013 : Rp 93,251 higher, mainly as a result of foreign exchange gains on translation of monetary assets and liabilities denominated in foreign currency. Jika bagian utang berbunga dalam valuta asing Catatan 23 dan 24 yang telah dilindung nilai diukur dengan menggunakan kurs lindung nilainya, maka saldo utang berbunga pada 31 Desember 2014 dan 2013 setelah dikurangi biaya pinjaman yang belum diamortisasi masing-masing adalah sebagai berikut: If the hedged portion of foreign-currency interest- bearing-debt Notes 23 and 24 is valued using it’s hedge rate, the balance of interest-bearing debt on 31 December 2014 and 2013, net of unamortized borrowing costs are as follow: Kurs Kurs laporan posisi laporan posisi keuangan keuangan Rate of Kurs Rate of Kurs consolidated lindung consolidated lindung statements of nilai statements of nilai financial Hedging financial Hedging position date rate position date rate Pinjaman sindikasi 12.315.600 11.522.437 8.908.491 7.963.606 Syndication loans Surat utang 3.922.000 3.301.500 4.396.700 3.892.840 Notes Sewa pembiayaan 10.890 10.890 10.516 10.516 Finance lease Dikurangi : L e s s : Biaya pinjaman yang belum Unamortized borrowing costs diamortisasi Catatan 2d 186.249 186.249 334.756 334.756 Note 2d Jumlah - Bersih 16.062.241 14.648.578 12.980.951 11.532.206 T o t a l - N e t The balance of loans 2 0 1 3 Saldo pinjaman 2 0 1 4 Saldo pinjaman The balance of loans 207 LAPORAN TAhUNAN 2014 PT TOWER bERSAMA INFRASTRUCTURE Tbk These Consolidated Financial Statements are Originally Issued in Indonesian Language Ekshibit E94 Exhibit E94 PT TOWER BERSAMA INFRASTRUCTURE Tbk DAN ENTITAS ANAK CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN UNTUK TAHUN YANG BERAKHIR 31 DESEMBER 2014 Disajikan dalam jutaan Rupiah, kecuali dinyatakan lain PT TOWER BERSAMA INFRASTRUCTURE Tbk AND SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED 31 DECEMBER 2014 Expressed in million Rupiah, unless otherwise stated 41. MANAJEMEN RISIKO KEUANGAN Lanjutan

41. FINANCIAL RISK MANAGEMENT Continued