Perhitungan Biaya Produksi Menurut Perusahaan

63

a. Perhitungan Biaya Produksi Menurut Perusahaan

Tabel II.4 Perhitungan Biaya Produksi Menurut Perusahaan Pesanan Valve D 25mm Bare ROP , 25 Unit PT. MBG PUTRA MANDIRI HARGA POKOK PRODUKSI CUSTOMER : PT. Eti Fire Systems Q T Y: 25 Unit PROYEK : Valve D 25mm Bare ROP W O : 09 -1573 P O : 00005337 ESTIMASI BIAYA Keterangan Hrg Tarif Jumlah NO. UNSUR BIAYA Qty Satuan Per-Qty Rp Rp 1 Biaya Bahan Baku: 2.1 Hexagon 35 18 Kg 66.944 1.205.000 2.2 As kuningan 3,35 Kg 65.015 217.800 2.3 Kuningan dia 70x3000 98 Kg 60.000 5.880.000 2.4 Kuningan dia 32x3000 20 Kg 60.000 1.200.000 2.5 Kuningan dia 45x1500 20 Kg 60.000 1.200.000 2.6 Kuningan dia 70,5x3000 65 Kg 53,254 3.461.500 2.7 As stainles dia 8mm 2 Kg 55.000 110.000 2.8 As nylon dia 30 1 Kg 150.000 150.000 2.9 Per segitiga 25 Pcs 6.000 150.000 2.10 Kuningan dia 40x1500 3 Kg 60,000 180.000 2.11 Kuningan dia 60x3000 1.4 Kg 60,000 84.000 2.12 Kuningan dia 30x3000 5 Kg 60,000 300.000 Sub Total 1 14.138.300 2 Biaya Tenaga Kerja Produksi: 3.1 TK Mazak I 19,5 Jam 5.300 103.350 3.2 TK Mazak II 25,75 Jam 5.300 136.475 3.3 TK Welding 1,5 Jam 5.300 7.950 3.4 TK Matsura 4 Jam 5.300 21.200 3.5 TK Paofong 9,5 Jam 5.300 50.350 3.6 TK BW 1,5 Jam 5.300 7.950 Sub Total 2 327.275 3 Penyusutan Mesin Manufaktur: 4.1 Msn Mazak I 19,5 Jam 2.500 48.750 4.2 Msn Mazak II 25,75 Jam 2.500 64.375 4.3 Msn Welding 1.5 Jam 1.500 2.250 4.4 Msn Matsura 4 Jam 6.800 27.200 64 4.5 Msn Paofong 9,5 Jam 4.700 44.650 4.6 Msn BW 1,5 Jam 2.500 3.750 Sub Total 3 190.975 4 Biaya Subcount : 5.1 SC WO. 1573 _Multitama 8.250.000 Teknik Benjo 5.2 SC Galvanis Per 255.000 5.3 SC Ball Knop_BLPT 187.500 5.4 SC Spring + Galvanis 200.000 Sub Total 4 8.892.500 5 Biaya Overhead Produksi: 6.1 Msn Mazak I 19,5 Jam 12.200 237.900 6.2 Msn Mazak II 25,75 Jam 12.200 314.150 6.3 Msn Welding 1,5 Jam 12.200 18.300 6.4 Msn Matsura 4 Jam 12.200 48.800 6.5 Msn Paofong 9,5 Jam 12.200 115.900 6.6 Msn BW 1,5 Jam 12.200 18.300 Sub Total 5 753.350 6 Biaya Overhead Sesungguhnya Proyek: 7.1 Lain-lain: - Baut L Stainless 100 Pcs 9.750 975.000 - Oring 007.221.208 1 Pcs 132.500 132.500 - Oring 007 40 Pcs 500 20.000 - Oring 104 55 Pcs 500 27.500 - Oring 218 20 Pcs 2.375 47.500 - Ring Per 1 Pcs 20.000 20.000 - Baut Counter 1 Pcs 14.500 14.500 7.2 Akomodasi Transportasi 295.000 7.3 Fee Marketing 975.000 Sub Total 6 2.507.000 HPP = 1+2+3+4+5+6 26.809.400 HPP Per- Unit = HPP 25 Unit 1.072.376 Harga Jual Per- Unit 1.300.000 Laba yang dihasilkan 227.624 Tingkat Keuntungan 21.23 Sumber: Data Perusahaan diolah Berdasarkan tabel II.4 dapat diketahui perhitungan komponen biaya oleh perusahaan sebagai berikut: 65

1. Biaya Bahan Baku