63
a. Perhitungan Biaya Produksi Menurut Perusahaan
Tabel II.4 Perhitungan Biaya Produksi Menurut Perusahaan
Pesanan
Valve D 25mm Bare ROP
, 25 Unit PT. MBG PUTRA MANDIRI
HARGA POKOK PRODUKSI CUSTOMER
: PT. Eti Fire Systems Q T Y: 25
Unit PROYEK
: Valve D 25mm Bare ROP W O : 09
-1573 P O
: 00005337 ESTIMASI BIAYA
Keterangan Hrg Tarif
Jumlah NO.
UNSUR BIAYA Qty
Satuan Per-Qty
Rp Rp
1 Biaya Bahan Baku:
2.1 Hexagon 35
18 Kg
66.944 1.205.000
2.2 As kuningan
3,35 Kg
65.015 217.800
2.3 Kuningan dia 70x3000
98 Kg
60.000 5.880.000
2.4 Kuningan dia 32x3000
20 Kg
60.000 1.200.000
2.5 Kuningan dia 45x1500
20 Kg
60.000 1.200.000
2.6 Kuningan dia 70,5x3000
65 Kg
53,254 3.461.500
2.7 As stainles dia 8mm
2 Kg
55.000 110.000
2.8 As nylon dia 30
1 Kg
150.000 150.000
2.9 Per segitiga
25 Pcs
6.000 150.000
2.10 Kuningan dia 40x1500
3 Kg
60,000 180.000
2.11 Kuningan dia 60x3000
1.4 Kg
60,000 84.000
2.12 Kuningan dia 30x3000
5 Kg
60,000 300.000
Sub Total 1 14.138.300
2 Biaya Tenaga Kerja Produksi:
3.1 TK Mazak I
19,5 Jam
5.300 103.350
3.2 TK Mazak II
25,75 Jam
5.300 136.475
3.3 TK Welding
1,5 Jam
5.300 7.950
3.4 TK Matsura
4 Jam
5.300 21.200
3.5 TK Paofong
9,5 Jam
5.300 50.350
3.6 TK BW
1,5 Jam
5.300 7.950
Sub Total 2 327.275
3 Penyusutan Mesin Manufaktur:
4.1 Msn Mazak I
19,5 Jam
2.500 48.750
4.2 Msn Mazak II
25,75 Jam
2.500 64.375
4.3 Msn Welding
1.5 Jam
1.500 2.250
4.4 Msn Matsura
4 Jam
6.800 27.200
64
4.5 Msn Paofong
9,5 Jam
4.700 44.650
4.6 Msn BW
1,5 Jam
2.500 3.750
Sub Total 3 190.975
4 Biaya Subcount :
5.1 SC WO. 1573
_Multitama 8.250.000
Teknik Benjo 5.2
SC Galvanis Per
255.000 5.3
SC Ball Knop_BLPT
187.500 5.4
SC Spring + Galvanis 200.000
Sub Total 4 8.892.500
5 Biaya Overhead Produksi:
6.1 Msn Mazak I
19,5 Jam
12.200 237.900
6.2 Msn Mazak II
25,75 Jam
12.200 314.150
6.3 Msn Welding
1,5 Jam
12.200 18.300
6.4 Msn Matsura
4 Jam
12.200 48.800
6.5 Msn Paofong
9,5 Jam
12.200 115.900
6.6 Msn BW
1,5 Jam
12.200 18.300
Sub Total 5 753.350
6 Biaya Overhead Sesungguhnya
Proyek:
7.1 Lain-lain:
- Baut L Stainless 100
Pcs 9.750
975.000 - Oring 007.221.208
1 Pcs
132.500 132.500
- Oring 007 40
Pcs 500
20.000 - Oring 104
55 Pcs
500 27.500
- Oring 218 20
Pcs 2.375
47.500 - Ring Per
1 Pcs
20.000 20.000
- Baut Counter
1 Pcs
14.500 14.500
7.2 Akomodasi Transportasi
295.000 7.3
Fee Marketing 975.000
Sub Total 6 2.507.000
HPP = 1+2+3+4+5+6 26.809.400
HPP Per- Unit = HPP 25 Unit 1.072.376
Harga Jual Per- Unit 1.300.000
Laba yang dihasilkan 227.624
Tingkat Keuntungan 21.23
Sumber: Data Perusahaan diolah
Berdasarkan tabel II.4 dapat diketahui perhitungan komponen biaya oleh perusahaan sebagai berikut:
65
1. Biaya Bahan Baku