Monitoring Report of the LARAP Package No. 6 Monitoring Report of the LARAP Package No. 7
12. Monitoring Report of the LARAP Package No. 12
: Kambang - Indrapura Province : Sumatera Barat A. Previous Status : • LARAP documents approved by World Bank on October 14, 2014. • Signed Action Plan of LARAP was given No Objection Letter NOL by the World Bank. B. Pending Issues, Concern and Actions a Inventory of affected assets and measurement by Land Acquisition committee of the Local Government are completed. b Implementation cost of LARAP will be included in APBN 2015. C. Update during this reporting month of August 2015 a Appraisal of affected assets are on going.13. Monitoring Report of the LARAP Package No. 13
: Sp. Rukis Tj. Kemuning Province : Bengkulu A. Previous Status : • World Bank issued on May 30, 2014 a No Objection Letter NOL on the revised LARAP documents for implementation. • Signed Action Plan of LARAP was given No Objection Letter NOL by the World Bank. • Monitoring Report No. 1 submitted to PMU on July 6, 2015. • World Bank issued on August 18, 2015 No Objection Letter NOL on the monitoring Report No.1. B. Pending Issues, Concern and Actions a Monitoring Reports No.2 of the LARAP s implementation remaining 41 PAP from the 190 total PAP in Kab. Bengkulu Selatan to be submitted to World Bank. C. Update during this reporting month of August 2015 a Compensation payment for the 41 remaining PAP in Kab. Bengkulu Selatan are completed. Monitoring Report No.2 under Preparation. b Negotiation of affected persons in Kab. Kaur is on-going completion.14. Monitoring Report of the LARAP Package No. 14
: Painan - Kambang Province : Sumatera Barat A. Previous Status : • World Bank issued on December 19, 2014 the No Objection Letter to the LARAP documents. • LARAP s signed action plan was given No Objection Letter NOL by World Bank. B. Pending Issues, Concern and Actions a PPK finalizing the land acquisition plan with the Local Government of Kab. Pesisir Selatan.Parts
» WINRIP DOC MPR CTC MPR No.32 2015 08 20150831 00281
» Current Implementation Situation Civil Works
» Disbursement WINRIP DOC MPR CTC MPR No.32 2015 08 20150831 00281
» World Bank Implementation Review Mission and Site Visit
» Package 17 Sp. Gunung Kemala
» Package No.15 Sibolga Procurement of Civil Works Contract Under Category 1 of the Loan Agreement
» Package No.7 Indrapura - Tapan AWP-2
» Package No.8 Bts. Kota Pariaman - Manggopoh AWP-2
» Package No.10 Sp. Empat Package No.12 Kambang - Indrapura AWP-2
» Technical Assistance for Capacity Building for Disaster Risk Reduction
» Technical Assistance for Capacity Building for Environmental Management
» Technical Assistance for Capacity Building for Road Safety
» Consolidated Update of the Progress of the Project
» Background WINRIP DOC MPR CTC MPR No.32 2015 08 20150831 00281
» Project Development WINRIP DOC MPR CTC MPR No.32 2015 08 20150831 00281
» Project Objective WINRIP DOC MPR CTC MPR No.32 2015 08 20150831 00281
» CTC Consultants WINRIP DOC MPR CTC MPR No.32 2015 08 20150831 00281
» DSC Consultants WINRIP DOC MPR CTC MPR No.32 2015 08 20150831 00281
» Detailed Design Preparation WINRIP DOC MPR CTC MPR No.32 2015 08 20150831 00281
» Procurements WINRIP DOC MPR CTC MPR No.32 2015 08 20150831 00281
» Civil Works Implementation WINRIP DOC MPR CTC MPR No.32 2015 08 20150831 00281
» Civil Works Progress WINRIP DOC MPR CTC MPR No.32 2015 08 20150831 00281
» 55.51 WINRIP DOC MPR CTC MPR No.32 2015 08 20150831 00281
» 71.36 WINRIP DOC MPR CTC MPR No.32 2015 08 20150831 00281
» 54.37 WINRIP DOC MPR CTC MPR No.32 2015 08 20150831 00281
» -43.19 WINRIP DOC MPR CTC MPR No.32 2015 08 20150831 00281
» 138 CD WINRIP DOC MPR CTC MPR No.32 2015 08 20150831 00281
» 1.09 2.27 11.28 WINRIP DOC MPR CTC MPR No.32 2015 08 20150831 00281
» 33.01 WINRIP DOC MPR CTC MPR No.32 2015 08 20150831 00281
» Quality Assurance WINRIP DOC MPR CTC MPR No.32 2015 08 20150831 00281
» Review Design Integration, Road Safety Aspects and Monitoring of Environmental Studies
» Environmental Quarterly Report Environmental and Social Considerations
» Monitoring Report of the LARAP Package No. 2
» Monitoring Report of the LARAP Package No. 5
» Monitoring Report of the LARAP Package No. 6 Monitoring Report of the LARAP Package No. 7
» Monitoring Report of the LARAP Package No. 8
» Monitoring Report of the LARAP Package No. 9
» Monitoring Report of the LARAP Package No. 10
» Monitoring Report of the LARAP Package No. 11
» Monitoring Report of the LARAP Package No. 14
» Monitoring Report of the LARAP Package No. 15
» Monitoring Report of the LARAP Package No.16
» Monitoring Report of the LARAP Package No.17
» Monitoring Report of the LARAP Package No.18
» Monitoring Report of the LARAP Package No.19
» Monitoring Report of the LARAP Package No. 20
» Monitoring Report of the LARAP Package No. 21
» Anti Corruption Issues WINRIP DOC MPR CTC MPR No.32 2015 08 20150831 00281
» Road Safety Audit WINRIP DOC MPR CTC MPR No.32 2015 08 20150831 00281
» Letter Database System, used to record all information of incoming and
» Document Library System, used to record all information of document and
» Implementation Support Components WINRIP DOC MPR CTC MPR No.32 2015 08 20150831 00281
» TRAINING TO SUPPORT PROJECT IMPLEMENTATION
» Management Information System WINRIP DOC MPR CTC MPR No.32 2015 08 20150831 00281
» Quality Assurance Project Risks and Mitigation Measures Current Situation Actions Required
Show more