Monitoring Report of the LARAP Package No. 9
15. Monitoring Report of the LARAP Package No. 15
: Sibolga Bts. Tapsel Province : Sumatera Utara A. Previous Status : • World Bank approved the LARAP documents on February 6, 2014 for implementation in acquiring Road Right of Ways and removal of obstruction. B. Pending Issues, Concern and Actions a 1065 from total 1448 PAP is under negosiationcompensation process. b Monitoring Report No.1 for LARAP implementation for compensation of 40 out of the 1448 PAP still to be prepared by SATKER RIN North Sumatra. C. Update during this reporting month of August 2015 a 40 from total 1448 PAP already received compensation payment from Satker PJN North Sumatera.16. Monitoring Report of the LARAP Package No.16
: Seblat - Ipuh Province : Bengkulu A. Previous Status : • World Bank issued on May 30, 2014 a No Objection Letter NOL on the revised LARAP documents for implementation. • World Bank issued No Objection Letter NOL on Monitoring Report No.1 for LARAP implementation. B. Pending Issues, Concern and Actions a LARAP documents for this Package covers only land acquisition for the road link. If there are land acquisition for the bridge site, a separate LARAP documents need to be prepared. b LARAP Implementation is underway for the remaining 311 PAP be allocated 2015 national budget and schedule to be settled on August 2015. C. Update during this reporting month of August 2015 a No update this period. b Payment negotiation of the PAP is on-going.17. Monitoring Report of the LARAP Package No.17
: Sp. Gunung Kemala Pg. Tampak Province : Lampung A. Previous Status : • World Bank approved the corrected LARAP documents on November 12, 2013 B. Pending Issues, Concern and Actions a Appraisal results under disclosure process by Land Acquisition Committee to the PAP.Parts
» WINRIP DOC MPR CTC MPR No.32 2015 08 20150831 00281
» Current Implementation Situation Civil Works
» Disbursement WINRIP DOC MPR CTC MPR No.32 2015 08 20150831 00281
» World Bank Implementation Review Mission and Site Visit
» Package 17 Sp. Gunung Kemala
» Package No.15 Sibolga Procurement of Civil Works Contract Under Category 1 of the Loan Agreement
» Package No.7 Indrapura - Tapan AWP-2
» Package No.8 Bts. Kota Pariaman - Manggopoh AWP-2
» Package No.10 Sp. Empat Package No.12 Kambang - Indrapura AWP-2
» Technical Assistance for Capacity Building for Disaster Risk Reduction
» Technical Assistance for Capacity Building for Environmental Management
» Technical Assistance for Capacity Building for Road Safety
» Consolidated Update of the Progress of the Project
» Background WINRIP DOC MPR CTC MPR No.32 2015 08 20150831 00281
» Project Development WINRIP DOC MPR CTC MPR No.32 2015 08 20150831 00281
» Project Objective WINRIP DOC MPR CTC MPR No.32 2015 08 20150831 00281
» CTC Consultants WINRIP DOC MPR CTC MPR No.32 2015 08 20150831 00281
» DSC Consultants WINRIP DOC MPR CTC MPR No.32 2015 08 20150831 00281
» Detailed Design Preparation WINRIP DOC MPR CTC MPR No.32 2015 08 20150831 00281
» Procurements WINRIP DOC MPR CTC MPR No.32 2015 08 20150831 00281
» Civil Works Implementation WINRIP DOC MPR CTC MPR No.32 2015 08 20150831 00281
» Civil Works Progress WINRIP DOC MPR CTC MPR No.32 2015 08 20150831 00281
» 55.51 WINRIP DOC MPR CTC MPR No.32 2015 08 20150831 00281
» 71.36 WINRIP DOC MPR CTC MPR No.32 2015 08 20150831 00281
» 54.37 WINRIP DOC MPR CTC MPR No.32 2015 08 20150831 00281
» -43.19 WINRIP DOC MPR CTC MPR No.32 2015 08 20150831 00281
» 138 CD WINRIP DOC MPR CTC MPR No.32 2015 08 20150831 00281
» 1.09 2.27 11.28 WINRIP DOC MPR CTC MPR No.32 2015 08 20150831 00281
» 33.01 WINRIP DOC MPR CTC MPR No.32 2015 08 20150831 00281
» Quality Assurance WINRIP DOC MPR CTC MPR No.32 2015 08 20150831 00281
» Review Design Integration, Road Safety Aspects and Monitoring of Environmental Studies
» Environmental Quarterly Report Environmental and Social Considerations
» Monitoring Report of the LARAP Package No. 2
» Monitoring Report of the LARAP Package No. 5
» Monitoring Report of the LARAP Package No. 6 Monitoring Report of the LARAP Package No. 7
» Monitoring Report of the LARAP Package No. 8
» Monitoring Report of the LARAP Package No. 9
» Monitoring Report of the LARAP Package No. 10
» Monitoring Report of the LARAP Package No. 11
» Monitoring Report of the LARAP Package No. 14
» Monitoring Report of the LARAP Package No. 15
» Monitoring Report of the LARAP Package No.16
» Monitoring Report of the LARAP Package No.17
» Monitoring Report of the LARAP Package No.18
» Monitoring Report of the LARAP Package No.19
» Monitoring Report of the LARAP Package No. 20
» Monitoring Report of the LARAP Package No. 21
» Anti Corruption Issues WINRIP DOC MPR CTC MPR No.32 2015 08 20150831 00281
» Road Safety Audit WINRIP DOC MPR CTC MPR No.32 2015 08 20150831 00281
» Letter Database System, used to record all information of incoming and
» Document Library System, used to record all information of document and
» Implementation Support Components WINRIP DOC MPR CTC MPR No.32 2015 08 20150831 00281
» TRAINING TO SUPPORT PROJECT IMPLEMENTATION
» Management Information System WINRIP DOC MPR CTC MPR No.32 2015 08 20150831 00281
» Quality Assurance Project Risks and Mitigation Measures Current Situation Actions Required