Quality Assurance Project Risks and Mitigation Measures Current Situation Actions Required
Monthly Progress Report August 2015
Western I ndonesia National Roads I mprovement Project 8 - 1
8 CORRESPONDENCES
During the period the CTC received and issued letters. Lists of letters received and issued are shown in Appendix J.
Western I ndonesia National Roads I mprovement Project
ANNEXES Annex P-1 : Package No. 1
Annex P-2 : Package No. 2 Annex P-3 : Package No. 3
Annex P-4 : Package No. 4 Annex P-5 : Package No. 5
Annex P-6 : Package No. 6 Annex P-11: Package No.11
Annex P-13: Package No.13 Annex P-19 : Package No.19
ANNEX P-1
MONTH :
Package No. Time Elapsed Days
594 Name
Time Elapsed 92,81
Project Manager Scheduled Progress
84,21 Contractor
PT JAYA KONSTRUKSI MP, Tbk Actual Overall Progress
55,51 Supervision Consultant
Balance -28,70
- Insufficsent supply of aggregate for base course - Find out another aggregate supplier
Contract Sign Progress This Month
10,46 asphalt concrete
Commencement Date - Shortage of labor
Time for Complation Days 640
Take Over Date
Status date
Contract Amount Rp.
Accumulative Rp. 42,13
Contract Amount Add-1 + PPN Rp.
Include advance payment
Comp Add.1
Accum Actual
Accum Accum
Total Total
Last this
to this Sch to this
Month Month
Month Month
I G e n e r a l
8,25 7,22
2,13 3,39
5,51 5,24
II D r a i n a g e
34,19 23,78
17,89 0,69
18,58 17,16
III Earthworks
3,95 6,56
3,32 0,15
3,47 6,56
IV Pavement Widening
Shoulders
1,47 0,94
- -
- 0,62
V Granular Pavement
9,22 7,04
3,09 0,78
3,87 7,04
VI Asphalt Pavement
40,14 46,76
14,72 5,36
20,07 41,54
VII S t r u c t u r e s
1,09 5,36
3,49 0,11
3,60 5,30
VIII Reinstatement
Minor Works
1,20 1,91
0,13 -
0,13 0,34
IX Day Work
0,14 0,12
- -
- 0,11
X Routine Maintenance
Works
0,36 0,32
0,27 0,01
0,28 0,30
TOTAL 100,00
100,00 45,05
10,46 55,51
84,21
Note :
Jan Feb
Mar Apr
May Jun
Jul Aug
Sep Oct
Nov Dec
Jan Feb
Mar Apr
May Jun
Jul Aug
Sep Oct
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
0,22 0,87
1,69 5,62
11,11 18,06
24,50 31,58
38,99 46,36
52,53 60,68
67,46 31,90
35,31 40,53
47,72 56,69
65,59 75,18
84,21 94,42
100,00 0,10
0,58 0,79
1,59 2,93
3,71 4,79
5,98 8,60
11,28 12,62
16,08 18,71
21,04 25,88
32,67 37,50
42,27 45,05
55,51 0,12
0,29 0,90
4,03 8,18
14,35 19,71
25,60 30,39
35,08 39,91
44,60 48,75
14,27 14,65
15,06 19,18
23,31 30,13
28,70 0,48
0,21 0,80
1,34 0,78
1,08 1,19
2,62 2,68
1,34 3,46
2,63 2,33
01
T IM
E
August 25, 2015
BIHA - KRUI
MAJOR PROBLEMS ACTION TO BE TAKEN
EXECUTIVE SUMMARY REPORT
Agust-15
PROJECT DATA SUMMARY OF WORK PROGRESS
PROGRESS STATUS
RENARDET S.A JV SUPARJONO, ST,MT
A M
O U
N T
08-Jan-14 25-Nov-13
DISBURSEMENT 64.914.106.033,00
25-Agust-15
PHYSICAL PROGRESS MONITORING TABLE 2014
2015 Year
09-Okt-15
PHYSICAL WORK PROGRESS BY CATEGORY 134.909.211.000,00
154.073.015.000,00
Actual Progress Balance
Div Description
The month of time for complation Rivised Progress Schedul Add.1
Original Progress Schedul Month
- Condacted Meeting with contractor decision maker to find out the main problem
- Stone crusher out of order in the last half month - Inadequate Contractor cashflow
- Shortage of lab technician
10 20
30 40
50 60
70 80
90 100
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
P H
Y S
ICA L
P R
O G
R E
S
THE MONTH OF TIME FOR COMPLATION
PROGRESS SCHEDULE PACKAGE 01
Original Sch Revised Sch
Actual
ESR Aug 2015_18AC27B P-1
ANNEX P-2
MONTH :
Package No. Time Elapsed Days
596 Name
Time Elapsed 81,64
Project Manager Scheduled Progress
81,03 - Contractor has insufficient manpower, Equipment
- The contractor have to add manpower, equipment Contractor
PT JAYA KONSTRUKSI MP, Tbk Actual Overall Progress
71,36 financial resource to excecute the available works
aspecialy for drainage work Supervision Consultant
Balance -9,67
- Delayed widening of exist pavement - DSC and Contractor has discussed with PPK regar-
Contract Sign Progress This Month
7,61 - Delayed of works Air Gadang Bridge
ding to Start of work Air Gadang Bridge Commencement Date
method of construction of precast retaining wall. Time for Complation Days
730 - Delayed of Work Asphalt Pavement
- PPK should coordinate with respective agency Take Over Date
Status date - Delayed relocation of existing electrical pool
- PPK should give notification to the utility company Contract Amount
Rp. Accumulative Rp.
55,18 - Delayed relocation of existing PDAM pool
Contract Amount Add-1 + PPN Include advance payment
Comp Accum
Actual Accum
Accum Total
Last this
to this Sch to this
Month Month
Month Month
I G e n e r a l
10,46 2,96
- 2,96
4,33 II
D r a i n a g e 3,53
3,24 0,38
2,86 3,24
III Earthworks
4,44 4,69
- 4,69
4,64 IV
Pavement Widening Shoulders
2,26 0,43
- 0,43
- V
Granular Pavement 10,49
10,94 -
10,94 10,94
VI Asphalt Pavement
52,09 33,38
6,08 39,46
41,61 VII
S t r u c t u r e s 14,35
7,33 1,65
8,98 14,85
VIII Reinstatement Minor
Works
1,65 0,37
0,26 0,63
0,87 IX
Day Work 0,12
0,04 -
0,04 0,09
X Routine Maintenance
Works
0,62 0,36
- 0,36
0,47 TOTAL
100,00 63,76
7,61 71,36
81,03
Note :
Year Month
Jan Feb
Mar Apr
May Jun
Jul Aug
Sep Oct
Nov Dec
Jan Feb
Mar Apr
May Jun
Jul Aug
Sep Oct
Nov Dec
2 3
4 5
6 7
8 9
10 11
12 13
14 15
16 17
18 19
20 21
22 23
24 Original Progress Schedul
0,45 0,90
2,20 3,45
7,17 13,58
17,48 20,63
27,88 33,56
38,81 44,72
50,52 56,13
62,58 67,95
73,65 79,35
Revised Progress Schedul 66,920
71,104 81,035
87,075 91,345
95,618 100,00
Actual Progress
- 0,13
1,02 2,19
4,11 5,96
9,69 13,85
22,55 25,61
31,45 33,73
40,41 44,25
49,98 55,715
58,61 58,346
63,7562 71,362
Balance 0,45
0,77 1,17
1,26 3,07
7,62 7,80
6,78 5,33
7,95 7,36
10,99 10,11
11,88 12,59
12,23 15,04
8,57 7,35
9,67 0,89
1,17 1,91
1,86 3,72
4,17 8,69
3,07 5,84
2,28 6,68
3,84 38,29
The month of time for complation DISBURSEMENT
05-Agust-15 109.215.635.435
05-Jan-16
PHYSICAL WORK PROGRESS BY CATEGORY Div
Description
PHYSICAL PROGRESS MONITORING TABLE 2014
2015
197.936.699.000,00
EXECUTIVE SUMMARY REPORT
Agust-15
PROJECT DATA SUMMARY OF WORK PROGRESS
PROGRESS STATUS
August 25, 2015
PADANG SAWAH-SIMPANG EMPAT MAJOR PROBLEMS
ACTION TO BE TAKEN
02
T IM
E
A M
O U
N T
RENARDET S.A JV 06-Dec-13
06-Jan-14
10 20
30 40
50 60
70 80
90 100
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
P H
Y S
ICA L
P R
O G
R E
S
THE MONTH OF TIME FOR COMPLATION
PROGRESS SCHEDULE PACKAGE 02
ORIGINAL SCH REVISED SCH
ACTUAL
ESR Aug 2015_18AC27B P-2
ANNEX P-3
MONTH :
Package No. Time Elapsed Days
596 Name
Time Elapsed 81,64
Project Manager Scheduled Progress
82,69 Contractor
PT JAYA KONSTRUKSI MP, Tbk Actual Overall Progress
54,37 Supervision Consultant
Balance -28,32
- Insufficsent supply of aggregate for base course - Find out another aggregate supplier
Contract Sign Progress This Month
5,81
asphalt concrete
Commencement Date
- Shortage of labor
Time for Complation Days 730
Take Over Date Status date
Contract Amount Rp.
Accumulative Rp. 55,02
Contract Amount Add-1 + PPN Include advance payment
Comp Revised
Accum Actual
Accum Accum
Total Total
Last this
to this Sch to this
Month Month
Month Month
I G e n e r a l
10,21 10,21
1,36 0,07
1,43 3,66
II D r a i n a g e
13,17 13,17
7,31 0,64
7,95 11,58
III Earthworks
3,04 3,04
6,02 0,27
6,29 6,82
IV Pavement Widening
Shoulders
2,45 2,45
- V
Granular Pavement 11,27
11,27 8,52
0,82 9,34
11,25 VI
Asphalt Pavement
55,81 55,81
21,91 3,19
25,10 44,13
VII S t r u c t u r e s
0,80 0,80
2,78 0,44
3,22 4,15
VIII Reinstatement Minor
Works
2,27 2,27
0,11 -
0,11 0,14
IX Day Work
0,22 0,22
0,04 0,37
0,41 0,38
X Routine Maintenance
Works
0,76 0,76
0,51 0,01
0,52 0,58
TOTAL 100,00
100,00 48,56
5,81 54,37
82,69
Note :
Jan Feb
Mar Apr
May Jun
Jul Aug
Sep Oct
Nov Dec
Jan Feb
Mar Apr
May Jun
Jul Aug
Sep Oct
Nov Dec
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
0,26 1,00
1,67 2,45
4,78 7,45
10,70 14,27
21,53 30,10
36,95 44,01
51,62 58,67
65,63 73,03
79,97 87,04
70,14 74,54
82,69 89,96
95,76 97,82
100,00 0,24
0,48 2,07
2,43 2,87
5,45 5,70
7,01 12,43
14,45 19,30
24,38 29,11
30,11 32,97
39,72 43,28
43,98 48,56
54,37 0,02
0,52 0,40
0,02 1,91
2,00 5,00
7,26 9,10
15,65 17,65
19,63 22,51
28,56 32,66
33,31 36,69
26,16 25,98
28,32 0,24
1,59 0,36
0,44 2,58
0,25 1,31
5,42 2,02
4,85 5,08
4,73 1,00
03
T IM
E
August 25, 2015
MANGGOPOH - PADANG SAWAH
MAJOR PROBLEMS ACTION TO BE TAKEN
EXECUTIVE SUMMARY REPORT
Agust-15
PROJECT DATA SUMMARY OF WORK PROGRESS
PROGRESS STATUS
A M
O U
N T
- Inadequate Contractor cashflow - Condacted Meeting with contractor decision maker to
find out the main problem
RENARDET S.A JV 06-Dec-13
06-Jan-14
DISBURSEMENT
- Shortage of lab technician
05-Jan-16
25-Agust-15 - Stone crusher out of order in the last half month
143.688.963.000,00
79.053.043.038,00
PHYSICAL WORK PROGRESS BY CATEGORY
Original Progress Schedul Div
Description
Rivised Progress Schedul Actual Progress
Balance PHYSICAL PROGRESS MONITORING TABLE
Year 2014
2015 Month
The month of time for complation
10 20
30 40
50 60
70 80
90 100
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
P H
Y S
ICA L
P R
O G
R E
S
THE MONTH OF TIME FOR COMPLATION
PROGRESS SCHEDULE PACKAGE 03
ORIGINAL SCH Revised Sch
Actual
ESR Aug 2015_18AC27B P-3
ANNEX P-4
MONTH :
Package No. Time Elapsed Days
592 Name
Time Elapsed 81,10
Project Manager Scheduled Progress
89,47 Contractor
PT WASKITA KARYA - PT DAYA JO Actual Overall Progress
46,28 Supervision Consultant
Balance -43,19
Contract Sign Progress This Month
2,07 Commencement Date
Time for Complation Days 730
Take Over Date
Status date
Contract Amount Rp.
Accumulative Rp.
28,91
Contract Amount Add-1 + PPN Include advance payment
Comp Accum
Actual Accum
Accum Total
Last this
to this Sch to this
Month Month
Month Month
I G e n e r a l
7,59 0,49
0,02 0,47
2,36 II
D r a i n a g e 12,26
1,67 0,13
1,80 11,73
III Earthworks
3,58 2,36
0,01 2,35
3,43 IV
Pavement Widening Shoulders
3,39 0,31
0,58 0,89
2,43 V
Granular Pavement 18,07
14,28 0,78
15,05 17,29
VI Asphalt Pavement
49,27 23,65
0,53 24,18
47,87 VII
S t r u c t u r e s
2,55 1,11
0,11 1,22
2,44 VIII
Reinstatement Minor Works
2,95 0,17
0,01 0,16
1,66 IX
Day Work 0,14
0,00 0,00
0,11 X
Routine Maintenance Works
0,20 0,18
0,01 0,17
0,16 TOTAL
100,00 44,21
2,07 46,28
89,47
Note :
Year Month
Jan Feb
Mar Apr
May Jun
Jul Aug
Sep Oct
Nov Dec
Jan Feb
Mar Apr
May Jun
Jul Aug
Sep Oct
Nov Dec
The month of time for complation 1
2 3
4 5
6 7
8 9
10 11
12 13
14 15
16 17
18 19
20 21
22 23
24 Schedl Progress Original
0,11 0,32
0,75 1,14
6,57 10,29
12,85 15,81
20,08 24,22
32,76 40,88
47,93 55,61
63,45 69,09
75,72 81,55
83,699 89,467
94,619 97,053
98,800 100,00
Actual Progress -
0,18 0,40
0,53 0,56
0,78 0,87
1,45 3,73
5,35 8,10
9,35 13,79
21,76 32,97
35,43 39,36
50,15 44,21
46,28
Balance
0,11 0,14
0,35 0,61
6,01 9,51
11,98 14,36
16,35 18,88
24,66 31,53
34,14 33,85
30,48 33,66
36,35 31,39
39,49 43,19
0,22 0,13
0,03 0,22
0,09 0,58
2,27 1,62
2,76 1,25
4,44 7,97
2014 2015
04
T IM
E August 25, 2015
IPUH - BANTAL
MAJOR PROBLEMS ACTION TO BE TAKEN
ENDRO KUSUMOJOYO, ST.MT A
M O
U N
T
- Field Eng Technical justification of variant order not finilzed yet
RENARDET S.A JV
- Productivity of Stone crusher is too low
09-Jan-16
EXECUTIVE SUMMARY REPORT
Agust-15
PROJECT DATA SUMMARY OF WORK PROGRESS
PROGRESS STATUS
- No effort to catchup behind schedul
10-Jan-14 14-Nov-13
DISBURSEMENT
31-Mei-15 54.045.746.058,00
PHYSICAL PROGRESS MONITORING TABLE PHYSICAL WORK PROGRESS BY CATEGORY
Div Description
186.936.750.000,00
10 20
30 40
50 60
70 80
90 100
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
P H
Y S
ICA L P
R O
G R
E S
THE MONTH OF TIME FOR COMPLATION
PROGRESS SCHEDULE PACKAGE 04
Schedule Actual
ESR Aug 2015_18AC27B P-4
ANNEX P-5
MONTH :
Package No. Time Elapsed Days
68 Name
SIMPANG RAMPA - PORIAHA Time Elapsed
12,59 Project Manager
Ir.Juara M.Siahaan
Scheduled Progress 3,89
Contractor PT. NUSA KONSTRUKSI ENJINIRING Tbk.
Actual Overall Progress 1,09
Supervision Consultant Balance
-2,80 Contract Sign
Progress This Month 0,52
Commencement Date Time for Complation Days
540 Take Over Date
Status date
Contract Amount Rp.
Accumulative Rp.
2,30
Include advance payment
Comp Accum
Actual Accum
Accum Total
Last this
to this Sch to this
Month Month
Month Month
I G e n e r a l
8,09 0,57
0,57 0,46
1,68 II
D r a i n a g e 2,77
- -
- 0,03
III Earthworks
21,28 -
- 0,63
2,06 IV
Pavement Widening Shoulders
1,28 -
- -
- V
Granular Pavement 8,04
- -
- -
VI Asphalt Pavement
38,75 -
- -
- VII
S t r u c t u r e s 16,22
- -
- 0,10
VIII Reinstatement Minor
Works
3,48 -
- -
- IX
Day Work 0,10
- -
- 0,01
X Routine Maintenance
Works
- -
- -
TOTAL 100,00
0,57 0,57
1,09 3,88
Note :
Year Month
Jun Jul
Aug Sep
Oct Nov
Dec Jan
Feb Mar
Apr May
Jun Jul
Aug Sep
Oct Nov
Dec The month of time for complation
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 Schedl Progress Original
0,22 0,99
3,89 8,90
16,87 23,69
36,44 41,47
46,63 52,88
57,21 61,53
66,93 71,12
79,57 90,71
96,82 100,00
100,00
Actual Progress -
0,57 1,09
Balance 0,22
0,42 2,80
0,57 0,52
1,09 -
- -
- -
- -
- -
-
2016
25-Agust-15 2.468.388.980,00
08-Des-16
2015 PHYSICAL PROGRESS MONITORING TABLE
107.321.260.310,00 RENARDET S.A JV
05
T IM
E
August 25, 2015
MAJOR PROBLEMS ACTION TO BE TAKEN
A M
O U
N T
EXECUTIVE SUMMARY REPORT
Agust-15
PROJECT DATA SUMMARY OF WORK PROGRESS
PROGRESS STATUS
DISBURSEMENT
18-Jun-15 17-Mar-15
Div Description
PHYSICAL WORK PROGRESS BY CATEGORY
10 20
30 40
50 60
70 80
90 100
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19
P H
Y S
ICA L
P R
O G
R E
S
THE MONTH OF TIME FOR COMPLATION
PROGRESS SCHEDULE PACKAGE 05
Series1 Series2
ESR Aug 2015_18AC27B P-05
ANNEX P-6
MONTH :
Package No. Time Elapsed Days
167 Name
Time Elapsed 37,11
Project Manager DINAR PANGAYOMAN, ST
Scheduled Progress 8,17
Contractor PT. WASKITA KARYA Tbk
Actual Overall Progress 2,27
Supervision Consultant RENARDET S.A JV PT. CIPTA STRADA
Balance -5,90
Contract Sign Progress This Month
1,10 Commencement Date
Time for Complation Days 450
Calendar Days Take Over Date
Status date
Contract Amount Rp.
Accumulative Rp.
15,00
Include advance payment
Comp Accum
Actual Accum
Accum Total
Last this
to this Sch to this
Month Month
Month Month
I G e n e r a l
0,83 0,68
- 0,68
0,58 II
D r a i n a g e 2,09
- -
1,65 III
Earthworks 7,20
0,06 0,56
0,63 3,58
IV Pavement Widening
Shoulders 4,02
- -
- V
Granular Pavement 11,07
- 0,31
1,28 VI
Asphalt Pavement 70,65
- -
0,47 VII
S t r u c t u r e s 0,92
0,04 0,19
0,23 -
VIII Reinstatement Minor
Works 2,38
0,12 -
0,12 0,19
IX Day Work
- -
- -
X Routine Maintenance
Works 0,85
0,27 0,03
0,30 0,42
TOTAL 100
1,18 0,79
2,27 8,17
Note :
Year Month
March Apr
May June
July August
Sep Oct
Nop Dec
Jan Feb
March Apr
May The month of time for complation
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 Schedl Progress Original
0,17 0,59
1,28 3,09
4,38 8,17
14,27 25,82
38,49 49,93
62,08 75,00
85,36 95,41
100,00
Actual Progress 0,07
0,33 0,76
1,04 1,18
2,27
Balance -0,15
-0,26 -0,53
-2,04 -3,20
-5,90 0,42
0,29 0,13
1,10 2,27
- -
- -
- -
-
6 T
IM E
August 25, 2015
KERKAP - PASAR PEDATI MAJOR PROBLEMS
EXECUTIVE SUMMARY REPORT
Agust-15
PROJECT DATA SUMMARY OF WORK PROGRESS
PROGRESS STATUS
02-Jun-16
DISBURSEMENT ACTION TO BE TAKEN
A M
O U
N T
- Field Eng is not finalized yet - Lag of office engineer
- All of Job Mix Formula not finalized yet
27-Feb-15 11-Mar-15
12.977.620.500,00 25-Agust-15
2016
PHYSICAL PROGRESS MONITORING TABLE
2015
86.517.470.000 PHYSICAL WORK PROGRESS BY CATEGORY
Div Description
10 20
30 40
50 60
70 80
90 100
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
P H
Y S
ICA L P
R O
G R
E S
THE MONTH OF TIME FOR COMPLATION
PROGRESS SCHEDULE PACKAGE 06
Series1 Series2
ESR Aug 2015_18AC27B P-06
ANNEX P-11
MONTH :
Package No. Time Elapsed Days
183 Name
Time Elapsed 25,42
Project Manager Satker Wilayah I
Scheduled Progress 14,17
Contractor PT. HUTAMA KARYA, Tbk JO PT. DMT
Actual Overall Progress 11,28
Supervision Consultant RENARDET S.A JV PT. CIPTA STRADA
Balance 2,89
Contract Sign Progress This Month
1,28 Commencement Date
Take Over Date Time for Complation Days
720 Calendar Days
Status date
Contract Amount Rp.
Accumulative Rp. 18,48
Include advance payment
Comp Accum
Actual Accum
Accum Total
Last this
to this Sch to this
Month Month
Month Month
I G e n e r a l
0,89 0,888
0,00 0,888
0,888 II
D r a i n a g e 1,97
0,185 0,06
0,249 1,913
III Earthworks
26,30 3,307
0,14 3,450
6,532 IV
Pavement Widening Shoulders
5,13 -
- -
- V
Granular Pavement 7,31
3,204 0,02
3,220 1,807
VI Asphalt Pavement
48,54 -
- -
1,367 VII
S t r u c t u r e s 5,54
2,280 1,05
3,327 1,386
VIII Reinstatement Minor
Works 4,00
- -
- 0,200
IX Day Work
- -
- -
- X
Routine Maintenance Works
0,32 0,134
0,01 0,148
0,081 TOTAL
100,00 10,00
1,28 11,28
14,17
Note :
Year Month
March Apr
May June
July August
Sep Oct
Nop Dec
Jan Feb
March Apr
May June
July August
Sep Oct
Nop Dec
Jan Feb
The month of time for complation 1
2 3
4 5
6 7
8 9
10 11
12 13
14 15
16 17
18 19
20 21
22 23
24 Schedl Progress Original
0,39 2,18
4,68 7,70
9,91 14,17
18,72 22,96
27,34 30,87
35,92 42,90
49,60 57,19
64,53 71,98
74,96 80,07
85,18 89,48
93,91 96,18
99,45 100,00
Actual Progress 1,477
5,59 6,59
9,13 10,00
11,28
Balance
1,08 3,42
1,92 1,43
0,09 2,89
1,00 2,54
0,87 1,28
11,28 -
- -
- -
- -
PHYSICAL PROGRESS MONITORING TABLE
2015 2016
2017
PHYSICAL WORK PROGRESS BY CATEGORY Div
Description
228.899.717.000,00 38.454.934.220,00
25-Agust-15
23-Feb-15
DISBURSEMENT
11-Feb-17 18-Dec-14
A M
O U
N T
- Field Eng not finalized yet
EXECUTIVE SUMMARY REPORT
Agust-15
PROJECT DATA SUMMARY OF WORK PROGRESS
PROGRESS STATUS 11
T IM
E August 25, 2015
BANTAL - MUKOMUKO MAJOR PROBLEMS
ACTION TO BE TAKEN
10 20
30 40
50 60
70 80
90 100
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
P H
Y S
ICA L P
R O
G R
E S
THE MONTH OF TIME FOR COMPLATION
PROGRESS SCHEDULE PACKAGE 11
Schedule Actual
ESR Aug 2015_18AC27B P-11
ANNEX P-13
MONTH :
Package No. Time Elapsed Days
34 Name
SIMPANG RUKIS-TANJUNG KEMUNING Time Elapsed
4,72 Project Manager
Scheduled Progress 0,18
Contractor PT. WASKITA KARYA
Actual Overall Progress 0,36
Supervision Consultant Balance
0,18 Contract Sign
Progress This Month 0,36
Commencement Date Time for Complation Days
720 Take Over Date
Status date
Contract Amount Rp.
Accumulative Rp. 10,00
Include advance payment
Comp Accum
Actual Accum
Accum Total
Last this
to this Sch to this
Month Month
Month Month
I G e n e r a l
0,38 -
0,23 0,23
0,09 II
D r a i n a g e 1,87
- -
III Earthworks
16,52 -
0,12 0,12
0,08 IV
Pavement Widening Shoulders
4,11 -
- V
Granular Pavement 8,43
- -
VI Asphalt Pavement
64,33 -
- VII
S t r u c t u r e s 2,05
- -
VIII Reinstatement Minor
Works
2,14 -
- IX
Day Work -
- -
X Routine Maintenance
Works
0,18 -
- TOTAL
100,00 -
0,36 0,36
0,18
Note :
Year Month
Jul Aug
Sep Oct
Nov Dec
Jan Feb
Mar Apr
May Jun
Jul Aug
Sep Oct
Nov Dec
Jan Feb
Mar Apr
May Jun
Jul The month of time for complation
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 Schedl Progress Original
0,02 0,18
1,36 3,84
6,14 8,99
13,40 19,90
25,57 31,62
37,60 43,77
47,03 54,02
61,25 66,09
70,84 75,45
80,10 84,24
87,79 92,11
96,33 99,00
100,00
Actual Progress -
0,36
Balance
0,02 0,18
0,36 0,36
- -
- -
- -
- -
- -
-
Div Description
PHYSICAL PROGRESS MONITORING TABLE 2015
2016 2017
292.700.000.000,00 29.270.000.000,00
PHYSICAL WORK PROGRESS BY CATEGORY DISBURSEMENT
10-Jul-17 25-Agust-15
A M
O U
N T
RENARDET S.A JV 18-Dec-14
22-Jul-15
EXECUTIVE SUMMARY REPORT
Agust-15
PROJECT DATA SUMMARY OF WORK PROGRESS
PROGRESS STATUS
13
T IM
E
August 25, 2015
MAJOR PROBLEMS ACTION TO BE TAKEN
10 20
30 40
50 60
70 80
90 100
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25
P H
Y S
ICA L
P R
O G
R E
S
THE MONTH OF TIME FOR COMPLATION
PROGRESS SCHEDULE PACKAGE 13
SCHEDULE ACTUAL
ESR Aug 2015_18AC27B P-13
ANNEX P-19
MONTH :
Package No. Time Elapsed Days
167 Name
Time Elapsed 55,67
Project Manager DINAR PANGAYOMAN,ST
Scheduled Progress 53,77
Contractor Actual Overall Progress
33,01 Supervision Consultant
Balance -20,76
Contract Sign Progress This Month
14,43 Commencement Date
Time for Complation Days 300 Calendar Days
Take Over Date
Status date
Contract Amount Rp.
Accumulative Rp.
15,00
Include advance payment
Comp Accum
Actual Accum
Accum Total
Last this
to this Sch to this
Month Month
Month Month
I G e n e r a l
0,43 0,30
- 0,30
0,30 II
D r a i n a g e 3,15
0,08 0,89
0,97 3,14
III Earthworks
11,96 10,55
0,00 10,55
11,19 IV
Pavement Widening Shoulders
5,30 -
- -
0,78 V
Granular Pavement 10,69
7,23 3,13
10,36 10,68
VI Asphalt Pavement
59,66 0,06
10,14 10,20
25,38 VII
S t r u c t u r e s 2,00
0,36 0,24
0,60 2,00
VIII Reinstatement Minor
Works 6,79
- -
- 0,29
IX Day Work
X Routine Maintenance
Works 0,03
- 0,03
0,03 0,01
TOTAL 100,00
18,58 14,43
33,01 53,77
Note :
Year Month
March April
May June
July Aug
Sept Oct
Nov Des
The month of time for complation 1
2 3
4 5
6 7
8 9
10 Schedl Progress Original
0,12 1,92
14,12 21,50
32,25 53,77
76,91 91,81
99,04 100,00
Actual Progress 0,11
1,24 9,65
14,75 18,58
33,01
Balance -0,01
-0,68 -4,47
-6,75 -13,67
-20,76 8,40
5,10 3,83
14,43 33,01
- -
- -
- -
- PT RODATEKNINDO PURAJAYA
2015 PHYSICAL WORK PROGRESS BY CATEGORY
Div Description
25-Agust-15
33.689.452.000
5.053.417.800,00
PHYSICAL PROGRESS MONITORING TABLE DISBURSEMENT
27-Feb-15 11-Mar-15
04-Jan-16 RENARDET S.A JV
EXECUTIVE SUMMARY REPORT
Agust-15
PROJECT DATA SUMMARY OF WORK PROGRESS
PROGRESS STATUS
19
T IM
E August 25, 2015
BINTUNAN-LAIS
MAJOR PROBLEMS ACTION TO BE TAKEN
A M
O U
N T
- Field Eng not finalized yet
10 20
30 40
50 60
70 80
90 100
1 2
3 4
5 6
7 8
9 10
P H
Y S
ICA L P
R O
G R
E S
THE MONTH OF TIME FOR COMPLATION
PROGRESS SCHEDULE PACKAGE 19
Series1 Series2
ESR Aug 2015_18AC27B P-19
Western I ndonesia National Roads I mprovement Project
ATTACHMENTS : Attachment No.1 : Action Plans
Attachment No.2 : Action Plans Attachment No.3 : Summary of Studies and Reports on
Environmental Activity
Page of
NO. PACKAGE
LENGTH KM
STATUSPROBLEMS ACTION PLAN
TARGET RESPONSIBILITY BY
1 Krui - Biha,
PT. Jaya Konstruksi MP, Tbk
Kontrak : 25112015 25
1. Progress
Plan : 65,588 Actual : 42,837
Delay : -22,751
2. AMP Production was not
sufficient to fullfil the needs until the due date of contract
November 6, 2015
3. The delay of IPC’s submission
1. Hot mix production
300 tonsday should be fullfiled for three
months
2. If the production of hot
mix of 300 tonsday can be fullfiled, so the
time extension will be considered.
3. IPC for June 2015 to
be reported to PPK and GS to Director of
General Highways July, August, September
2015 1.
PT. Jaya Konstruksi :
- Operational
Director -
Head of Division of Region II
- GS Package 01
2. PT. Jaya Konstruksi
: -
Operational Director
- Head of Division
of Region II -
GS Package 01 3.
PPK, GS, SE
2 Padang Sawah - Sp
Empat PT. Jaya Konstruksi
MP, Tbk Kontrak : 6122013