Implementation Support Components WINRIP DOC MPR CTC MPR No.32 2015 08 20150831 00281
Western I ndonesia National Roads I mprovement Project 6 - 6
DGH OfficialStaff related to the packages involved were also included as the participants.
As reported in previous MPR, the first implementation of this training was initially
proposed to be held in Jakarta the last week of January 2015, for 4 packages from 3 provinces, i.e: package 05: Sp. Rampa
Poriaha North Sumatera; package 11: Bantal Mukomuko and package 13: Sp. Rukis
Tj. Kemuning both in Bengkulu, and package 17: Sp. Gn. Kenanga
Pg. Tampak Lampung. However, it was then postponed and postponed again, because of the facts that::
It still had to await for the World Bank comments or approval ; as well as approval and signature of the Director General of Highways on the Draft Revision of the PMM;
It was still no clearance given to the local government budget, that resulting in transport cost problem for them to send participants to Jakarta or other provinces;
The fact that the Supervision Consultants and Contractors staff to be invited for training had not been mobilized yet. e.g: package 05: Sp. Rampa
Poriaha, North Sumatera, and package 17: Sp. Gn. Kemala
Pugung Tampak, Lampung.
The first socialization training could then be implemented after more than three months
later, by moving the location and changing the target group of participants. It was implemented in Bengkulu instead of Jakarta, from 6 May 2015 through 7 May 2015,
just for the participants from the packages located in Bengkulu province, i.e: package
06 Ps. Pedati Kerkap, package 11 Bantal
Mukomuko, package 19 Lais Bintunan, and package 13 Sp. Rukis
Tj;. Kemuning.
The second PMM Socialization Training would be addressed to packages 05, 15, 13, and 17; or,
two packages from North Sumatera package 05 and 15, and one each from Bengkulu package 13 and Lampung 17. Package 13 would be included again because the supervision consultants
SE of this package did not attend the first training yet.
It was initially proposed to be held in the 2
nd
week of March 2015, and then was also postponed to July 2015. However, it was then decided that there would be no training
delivery in July relating to Fasting Month and Idul Fitri. So the second PMM Socialization Training was then scheduled for the 4
th
week of August or the 1
st
week of September. It would be held in Sibolga or Padangsidempuan, North Sumatera.
This reporting month had been getting the preparation underway. The prospective
participants had been identified, and so had the locationvenues; the preparation of the materials and logistics was started.
Unfortunately, this second PMM Socialization Training, again, had probably to be
postponed. There were still some problems with package 15, that would result in delay of mobilization of contractor consultant staff who would be part of the main targets of this
training. So, consequently they would be absent from this training. Therefore, when CTC
Western I ndonesia National Roads I mprovement Project 6 - 7
informed PMU about the detailed delivery program and schedule of this training while preparing invitation letter for prospective participants, PMU considered for the time being
to postpone this training delivery in Sibolga, if only one package from North Sumatra could participate it. PMU would discuss this matter with CTC to find temporary measure or
alternative solution.
There was a thought, since there would be only three packages of different provinces
involved, then moving the location to Jakarta. The other idea was temporarily for the moment just distribute the PMM document to the respective participants of those
postponed training while awaiting for what would be decided by the PMU. The end of this month CTC-WINRIP realized this idea by asking the Professional Staff who visited the
project site in Bengkulu also brought some copies of PMM documents to be distributed to e.g: Head of Satker, PPK, SE, CIQM, GS. QM of the related package.