Unit Persiapan Bahan Baku Reaktor Fluidized Bed R-201 Kondensor E-202

TONI RIZKI ARUAN 080405010 UNIVERSITAS SUMATERA UTARA

BAB IV NERACA ENERGI

Basis perhitungan : 1 jam operasi Satuan operasi : kJjam Temperatur basis : 25 o C atau 298,15 K

4.1 Unit Persiapan Bahan Baku

Tabel 4.1 Neraca panas Unit Persiapan Bahan Baku Komponen Masuk kJjam Keluar kJjam Umpan 51.471,2110 - Produk - 51.471,2110 Total 51.471,2110 51.471,2110 4.2 Combuster B-201 Tabel 4.2 Neraca panas Combuster B-201 Komponen Masuk kJjam Keluar kJjam Alur 19 Alur 28 Alur 29 Alur 30 CH 4 34.814,3857 - 4.072,1172 - CO 2 562,1804 - 860,5762 1.429.679,9839 CO 25.101,2337 - - - H 2 62.733,4320 - - - N 2 45.627,4894 78,052,9792 13,0124 8.028.296,1165 O 2 - 21.003,5733 - 354.545,7154 C 2 H 6 - - 439,2046 - C 3 H 8 - - 380,5430 - C 5 H 12 - - 31,6823 - H 2 O - - - 2.177.691,5403 Panas Reaksi - - - -56.339.178,61 dQdt -44.622.653,6760 - Total -44.348.965,2660 -44.348.965,2660 Universitas Sumatera Utara TONI RIZKI ARUAN 080405010 UNIVERSITAS SUMATERA UTARA

4.3 Reaktor Fluidized Bed R-201

Tabel 4.3 Neraca panas Reaktor Fluidized Bed R-201 Komponen Masuk kJjam Keluar kJjam Alur 7 Alur 8 Alur 9 TKKS 51.471,2110 - - N 2 - 4.142,7163 404.586,9615 Bio Oil - - 3.194.824,5565 Arang - - 2.010.502,1050 Air - - 1.181.014,4871 CH 4 - - 390.083,8077 CO - - 224.544,3932 CO 2 - - 554.149,0829 H 2 - - 553.337,2820 H r - 35.891.536,518 dQdt 44.348.965,266 - Total 44.404.579,194 44.404.579,194 4.4 Cooler E-201 Tabel 4.4 Neraca panas Cooler E-201 Komponen Masuk kJjam Keluar kJjam Alur 9 Alur 10 Bio Oil 3.194.824,5565 1.293.461,17 Arang 2.010.502,1050 1.122.146,89 Air 1.181.014,4871 663.419,07 CH 4 390.083,8077 199.610,38 CO 224.544,3932 127.525,87 CO 2 554.149,0829 303.375,20 H 2 553.337,2820 319.985,79 N 2 404.586,9615 230.574,14 Air pendingin -4.252.944,17 - Total 4.260.098,51 4.260.098,51 Universitas Sumatera Utara TONI RIZKI ARUAN 080405010 UNIVERSITAS SUMATERA UTARA

4.5 Kondensor E-202

Tabel 4.5 Neraca panas Kondensor E-202 Komponen Masuk kJjam Keluar kJjam Alur 14 Alur 15 Bio Oil 1.293.461,17 265.468,21 Arang 112,2147 27,2145 Air 663.419,07 164.760,77 CH 4 199.610,38 44.695,44 CO 127.525,87 31.973,42 CO 2 303.375,20 71.965,19 H 2 319.985,79 80.046,14 N 2 230.574,14 58.098,36 Air pendingin -2.421.029,08 - Total 717.034,75 717.034,75 4.6 Cooler E-203 Tabel 4.6 Neraca panas Cooler E-203 Komponen Masuk kJjam Keluar kJjam Alur 16 Alur 17 Bio Oil 265.468,21 129.800,86 Arang 27,2145 13,4790 Air 164.760,77 82.117,8225 Air pendingin -218.324,03 - Total 211.932,16 211.932,16 4.7 Kolom Absorber AD-301 Tabel 4.7 Neraca Panas Kolom Absorber AD-301 Komponen Masuk kJjam Keluar kJjam Alur 18 Alur 25 Alur 19 Alur 20 CH 4 44.695,4458 - 34.814,3857 - CO 2 71.965,1929 - 562,1809 - CO 31.973,4258 - 25.101.2337 - H 2 80.046,1014 - 62.733,4320 - N 2 58.098,3629 - 45.627,4894 - K 2 CO 3 - 41.962,4077 - - H 2 O - 2.246.715,8288 - 3.626.984,0479 KHCO 3 - - - 112.341,4593 H r - -2.514.819,33 dQdt -1.182.111.8642 - Total 1.393.344,9010 1.393.344,9010 Universitas Sumatera Utara TONI RIZKI ARUAN 080405010 UNIVERSITAS SUMATERA UTARA 4.8 Heat Exchanger E-302 Tabel 4.8 Neraca panas Heat Exchanger E-302 Senyawa Masuk kJjam Keluar kJjam Alur 20 Alur 22 Alur 21 Alur 24 K 2 CO 3 - 195.824,57 - 118.060,58 H 2 O 3.626.984,0479 12.051.509,77 5.208.893,9775 6.775.370,18 KHCO 3 112.341,4593 - 157.278,0431 - Sub Total 3.739.325,5073 12.247.334,34 5.366.172,0206 6.893.430,76 Total 12.259.602,78 12.259.602,78 4.9 Kolom Stripper S-301 Tabel 4.9 Neraca panas Kolom Stripper S-301 Komponen Masuk kJjam Keluar kJjam Alur 21 Alur 22 Alur 23 KHCO 3 157.278,0431 - - H 2 O 5.208.893,9775 12.051.509,7738 - K 2 CO 3 - 195.824,5691 - CO 2 - - 71.965,1929 ΔH r - 2.509.682,52 dQdT 9.462.810,0361 - Total 14.828.982,06 14.828.982,06 4.10 Cooler E-301 Tabel 4.10 Neraca panas Cooler E-301 Senyawa Masuk kJjam Alur 24 Keluar kJjam Alur 25 K 2 CO 3 118.060,5827 41.962,4077 H 2 O 6.775.370,1806 2.246.715,829 Air pendingin -4.604.752,5269 - Total 2.288.678,236 2.288.678,236 4.11 Cooler CO 2 E-303 Tabel 4.11 Neraca panas Cooler E-303 Senyawa Masuk kJjam Alur 24 Keluar kJjam Alur 25 CO 2 71.965,1929 35.495,2089 Air pendingin -36.469,984 - Total 35.495,2089 35.495,2089 Universitas Sumatera Utara TONI RIZKI ARUAN 080405010 UNIVERSITAS SUMATERA UTARA

BAB V SPESIFIKASI PERALATAN

Dokumen yang terkait

Pra-Rancangan Pabrik Pembuatan Fenol dari Tandan Kosong Kelapa Sawit dengan Proses Pirolisis dengan Kapasitas 10.000 Ton/Tahun

20 136 445

Pra Rancangan Pabrik Pembuatan Selulosa Asetat Dari Tandan Kosong Kelapa Sawit Dengan Proses Pulping Dan Asetilasi Dengan Kapasitas Produksi 3.500 Ton/Tahun

37 136 397

Pra Rancangan Pabrik Pembuatan Dimetil Eter Dari Syngas Hasil Gasifikasi Tandan Kosong Kelapa Sawit Dengan Kapasitas Produksi 50.000 Ton/Tahun

56 164 239

Pra Rancangan Pabrik Pembuatan Gas Hidrogen Dengan Bahan Baku Cangkang Kelapa Sawit Melalui Proses Gasifikasi Dengan Kapasitas Produksi 46.000 Ton/Tahun

12 132 954

Pra Rancangan Pabrik Pembuatan Pektin Dari Kulit Buah Kakao Dengan Kapasitas Produksi 12.000 Ton/Tahun

21 88 308

Pra Rancangan Pabrik Pembuatan Furfural dari Bahan Baku Tandan Kosong Kelapa Sawit dengan Kapasitas 700 kg/Tahun

22 102 380

Pra Rancangan Pabrik Pembuatan Crude Corn Oil (CCO) Dari Biji Jagung Dengan Kapasitas Bahan Baku 3.000 Ton/Tahun

29 137 182

Pra Rancangan Pabrik Pembuatan Bio Oil Dengan Bahan Baku Tandan Kosong Kelapa Sawit Melalui Proses Pirolisis Cepat Dengan Kapasitas Produksi 12.000 Ton/Tahun

33 122 482

Pra Rancangan Pabrik Pembuatan Selulosa Asetat Dari Tandan Kosong Kelapa Sawit Dengan Proses Pulping Dan Asetilasi Dengan Kapasitas Produksi 3.500 Ton/Tahun

3 6 258

BAB II TINJAUAN PUSTAKA - Pra Rancangan Pabrik Pembuatan Selulosa Asetat Dari Tandan Kosong Kelapa Sawit Dengan Proses Pulping Dan Asetilasi Dengan Kapasitas Produksi 3.500 Ton/Tahun

1 2 12