Persamaan DAK Infrastruktur Lain-lain

7. Persamaan Penyerapan Tenaga Kerja Pertanian

HASIL ESTIMASI The SYSLIN Procedure Two-Stage Least Squares Estimation Model TKA Dependent Variable TKA Label TKA Analysis of Variance Sum of Mean Source DF Squares Square F Value Pr F Model 4 2.372E14 5.93E13 741.29 .0001 Error 71 5.68E12 8E10 Corrected Total 75 2.429E14 Root MSE 282839.159 R-Square 0.97662 Dependent Mean 1786110.93 Adj R-Sq 0.97530 Coeff Var 15.83548 Parameter Estimates Parameter Standard Variable Variable DF Estimate Error t Value Pr |t| Label Intercept 1 281444.6 153173.4 1.84 0.0703 Intercept UPHA 1 -228124 134628.1 -1.69 0.0946 UPHA LPDRBA 1 0.011010 0.006768 1.63 0.1082 D 1 -23714.2 73652.77 -0.32 0.7484 D LTKA 1 0.858153 0.054217 15.83 .0001 Durbin-Watson 2.690622 Number of Observations 76 First-Order Autocorrelation -0.34623

8. Persamaan Penyerapan Tenaga Kerja Non Pertanian

HASIL ESTIMASI The SYSLIN Procedure Two-Stage Least Squares Estimation Model TKNA Dependent Variable TKNA Label TKNA Analysis of Variance Sum of Mean Source DF Squares Square F Value Pr F Model 4 1.446E15 3.615E14 1449.06 .0001 Error 71 1.771E13 2.495E11 Corrected Total 75 1.464E15 Root MSE 499498.185 R-Square 0.98790 Dependent Mean 3063219.07 Adj R-Sq 0.98722 Coeff Var 16.30632 Parameter Estimates Parameter Standard Variable Variable DF Estimate Error t Value Pr |t| Label Intercept 1 1263240 683158.6 1.85 0.0686 Intercept RUPHNA 1 -1150185 659449.8 -1.74 0.0855 PDRBNA 1 0.006220 0.002281 2.73 0.0081 PDRBNA D 1 -87346.6 132521.4 -0.66 0.5120 D LTKNA 1 0.855178 0.053100 16.11 .0001 Durbin-Watson 2.284287 Number of Observations 76 First-Order Autocorrelation -0.14362