Planning SPORT AS AN EFFORT OF BUILDING CHILDREN CHARACTER.

THE 3 INTERNATIONAL SEMINAR ON PE, SPORT HEALTH 2013 Sport Science Faculty, Semarang State University - Gd F1 Kampus Sekaran Gunungpati Semarang, Indonesia 50229 Phonefax: +6224-858007 Page 368 introduction and the understanding of the technique of tracking in the open air are very important. The thing that one needs to consider is the readiness to do the activity, the guarantee of the safety and the comfort in doing it. Wherever one goes, whatever the track, or however uncomfortable the weather are not the significant problems for doing tracking if one is well-equipped. Tracking Management Management is the process of planning and organizing, leading and controlling the effort of the members of the organization and using all of the resources of the organization to achieve the predetermined goal. On the other hand, an activity can be defined as an effort made by a person or a group in an endeavor to attain a predetermined goal. In managing tracking one needs a high level of skill and creativity.

A. Elements of Tracking

1. Personnel, comprise planning, executing, and controlling. In managing an activity, one needs to consider the existing authorities in order that confusion of responsibilities and authorities can be avoided. Each of the elements of the personnel have to understand its own position and standing. 2. System has got to do with the managerial system being adopted, comprising job description or the description of tasks of each area, patterns of handling a problem and types of teamwork or individual work. A good system is one that is applied by and is recognized by all the personnel in the team. 3. Process has got to do with the accumulation of personnel in doing the activities. Process can run well when an individual in the activity has the same vision as the others in the effort to reach the goal.

B. A Way to Improve Tracking in Sambangan

1. Planning

a. Identification of problems in developing tracking 1 Selection of area for developing tracking Based on the data that have been collected through observation in the process of selecting the area for developing tracking in Sambangan, there are three areas or tracks as follows: a Tibuan Kroya Track Short Tracking Tibuan Kroya Track is the shortest track through 6 posts. Post-1 Ceburan is an area where there is a waterfall situated between two steep banks. Post-2 Campuan is the meeting of two rivers: Tukad Kapi and Tukad Gancan which unite into one which is called Tukad Banyu THE 3 INTERNATIONAL SEMINAR ON PE, SPORT HEALTH 2013 Sport Science Faculty, Semarang State University - Gd F1 Kampus Sekaran Gunungpati Semarang, Indonesia 50229 Phonefax: +6224-858007 Page 369 Mala. Post-3 Munduk Saab is a hill that looks like saab a cap for the container that is used for offerings. Post- 4 is a twin waterfall in a river flow. Post-6 is Tibuan Kroya is the last post. b Secret Garden Medium Tracking Secret Garden is a track under development and has 7 posts. Post-1 Cengana is an area of rice-fields which integrates the natural beauty of the hills and the terraces of rice-fields. Post-2 Tibuan Lesung is a river flow that resembles a mortar for pounding rice. Post- 3 Tibuan Aling-aling is a waterfall that is covered by a steep bank. Post-4 Bantenan is a plantation area and rice-fields. Post-5 Tibuan Kroya. Post-6 Tibuan Kembar. Post-7 Tibuan Pucuk, the three posts are in the area of waterfalls which are close to each other. Secret Garden track can be traveled through two tracks, the upper and the lower ones. The upper track starts from Cengana and finishes in Tibuan Pucuk and the lower track finishes in Cangana. c Tirta Kuning Long Tracking Tirta Kuning is the longest track and goes through 8 posts. Post-1 Cengana is in the area of rice-fields with the view of hills. Post-2 Tibuan Sarangan is a waterfall. Post-3 Bendungan Tiing Tali is a dam that is used for irrigation. Post- 4 Muara is an upland with rice-fields and a natural panorama of hills and from this post one can see the north sea of the island of Bali and the town of Singaraja. Post- 5 Tibuan Dedari is a waterfall. Post-7 Tibuan Cemara is the biggest and highest waterfall. Post-8 Tirta Kuning is a short cave with colored water. THE 3 INTERNATIONAL SEMINAR ON PE, SPORT HEALTH 2013 Sport Science Faculty, Semarang State University - Gd F1 Kampus Sekaran Gunungpati Semarang, Indonesia 50229 Phonefax: +6224-858007 Page 370 Figure-01. Track 2 Preparing the plan for tracking areas The selection of the areas of development needs a preparation of the plan for tracks that are divided into 3 tracks. A plan has to be made for 3 areas of tracking. This plan aims at finding the most suitable goals for the participating trackers. The plan of the tracking areas is adjusted to the specifications of the trackers, which include age, sex, and other characteristics. 3 The elements in the development of tracking A plan of developing the tracks has four essential elements: a Location which is an important element in terms of the accessibility of the tracks and accommodation at the existing attraction. In terms of locations of the development of the tracking areas, there are 17 locations that are THE 3 INTERNATIONAL SEMINAR ON PE, SPORT HEALTH 2013 Sport Science Faculty, Semarang State University - Gd F1 Kampus Sekaran Gunungpati Semarang, Indonesia 50229 Phonefax: +6224-858007 Page 371 attractive for their beautiful views and special characteristics. b The attraction of the view can add to the existing attraction or becomes the main attraction for the participating trackers. Thus there are 17 beautiful views. c The use of the areas being planned should match the environments. Many natural elements or environments such as mountain ranges, hills, springs, waterfalls, rivers, etc. The development activity that fits with the characteristics of the area becomes an attraction for the participating trackers. d The area should be available to be considered in the development of tracking Robert Mill Christie, 2000: 235. b. Analysis of the situation to decide whether planning is needed or not The planning of the development of tracking needs a situational analysis of the following aspects: 1 Marketing 2 Human resources 3 Production 4 Operation c. Determining the goal to be achieved d. Writing the design in an outline e. Discussion of the proposed plan with the management, colleagues, and relevant subordinates f. Doing a temporary analysis and determining the components g. Recruiting staff for each component and arranging tasks and responsibilities. h. Determining the outline of the plan together i. Communicating with the related units to discuss problems and determining data j. Collecting relevant data and then manipulate them for presentation in the form of information k. Preparing a design for the writing of a temporary plan as material for discussion with related parties l. Drafting the final plan to be tried out in the condition and situation faced. m. Approval for the plan and finally the plan can be implemented

2. Organizing