PT Industri Telekomunikasi Indonesia Persero
2014
annual report
Company pro le
Report to Shareholders
atas Kinerja Perusahaan
Management s Discussion and Analysis over The Company s Performance
LAPORAN TAHUNAN
076
LOKASI Location
PROVINSI Province
DESA KECAMATAN Village District
STATUS PROGRES PEKERJAAN Status Work Progress
Jawa Tengah Jawa Tengah
Jawa Timur Jawa Timur
Bali Riau
Riau Riau
Riau DukuhbendaBumijawa
ParangKarimunjawa Sana Laok 1Waru
Sana Laok 2Waru Tianyar TengahKubu
Cipang Kiri HuluRokan IV Koto Darul AmanRupat
Teluk LanusSungai Apit Sungai UpihKuala Kampar
98,5 100
99,9 99,8
99,7
100 100
98,5 93,1
TABEL REALISASI PENYELESAIAN PROYEK PLTS PROVINSI JAWA TENGAH-JAWA TIMUR-BALI-RIAU Realization Table of Project Completion of PLTS in Central Java - East Java - Bali - Riau
Mengingat bahwa Proyek TITO TELKOM, Proyek FTTH Green eld TELKOM, dan Proyek SMP BBM Pertamina
merupakan proyek-proyek yang berkontribusi besar pada target pencapaian tahun 2014, maka kendala
yang dialami pada ketiga proyek tersebut sangat mempengaruhi pencapaian target perusahaan secara
keseluruhan. Considering to the project TITO TELKOM, TELKOM
Green eld FTTH Project, and SMP BBM Project of Pertamina are projects that substantial contribute to
the achievement of the targets by 2014, then the constraints experienced in the three projects greatly
affect the general achievement of the target of the company.
2. Segmen Usaha MaintenanceManaged Service
Segmen usaha ini dijalankan dengan terus memperkuat kompetensi pengoperasian, pemeliharaan, dan
perbaikan melalui peningkatan kerja sama dengan vendor, baik secara teknis maupun komersial. Kegiatan
pengelolaan komponen dan suku cadang untuk jaringan telekomunikasi, perbaikan perangkat, serta
pemeliharaan jaringan telekomunikasi masih mendominasi segmen usaha ini.
2.1 Proyek SPMS
Dalam kegiatan pengelolaan komponen dan suku cadang, INTI menerima dua proyek besar, yaitu Spare
Part Management System SPMS untuk Nokia Siemens Network NSN senilai Rp 28,348 miliar dan Huawei
dengan total penjualan sebesar Rp 20,541 miliar. Untuk memenuhi permintaan kastemer pada proyek SPMS ini,
INTI mengoperasikan dua central warehouse CWH dan 86 satelit warehouse SWH yang tersebar di 75 kota
di Indonesia. Kegiatan yang dilakukan meliputi pengoperasian call center dan warehouse, pengiriman
modul-modul pengganti, serta penarikan kembali modul-modul yang rusak. Kegiatan ini berlangsung
selama 24 jam.
2. Segment Maintenance Managed Service
A business segment is run by continuing to strengthen the competence of the operation, maintenance, and
repair through increased cooperation with vendors, both technically and commercially. Management
activities of components and spare parts for the telecommunications network, device repair, and
maintenance of telecommunications networks still dominate this business segment.
2.1 Project SPMS
In the management of components and spare parts, INTI received two major projects, namely Parts Management
System SPMS for Nokia Siemens Networks NSN worth Rp. 28.348 billion and Huawei with total sales of
Rp 20.541 billion. To meet the customer demand on this SPMS project, INTI operates two central warehouse
CWH and 86 satellite warehouse SWH spread 75 cities in Indonesia. Activities include the operation of the
call center and warehouse, delivery of replacement modules, as well as the recall of defective modules. This
activity lasts for 24 hours.
PT Industri Telekomunikasi Indonesia Persero LAPORAN TAHUNAN
2014
annual report
077
Good Corporate Governance
Perusahaan
Corporate Social Responsibility
Financial Report
Peningkatan perolehan penjualan pada proyek SPMS ini dikarenakan peningkatan jumlah modul yang harus
didistribusikan. The increase in the sales of the project SPMS is because
an increasing number of modules that have to be distributed.
TAHUN Year
2014
TABEL REALISASI PENJUALAN SPMS Realization Table of SPMS Sales 2012 - 2014
2012 2013
TOTAL TRANSAKSI Total Transaction
dalam Rupiah in Rupiah
30,225,570,913 35,847,200,325
50,542,886,991