10 1.
Main Intake 8,2378 m
3
Perhitungan det
2. Regulatng Pond
14,5360 m
3
Perhitungan det
3 Tributary Intake 1 1,3997 m
3
Perhitungan det
4 Tributary Intake 2 1,5722 m
3
Perhitungan det
5 Tributary Intake 3 2,0482 m
3
Perhitungan det
6 Tributary Intake 4 2,3893 m
3
Perhitungan det
7 Tributary Intake 5 2,7762 m
3
Perhitungan det
8 Tributary Intake 6 2,2936 m
3
Perhitungan det
9 Tributary Intake 7 2,6712 m
3
Perhitungan det
10 Tributary Intake 8
0,3187 m
3
Perhitungan det
11 Tributary Intake 9 0,3706 m
3
Perhitungan det
12 Tributary Intake
10 2,7122 m
3
Perhitungan det
13 Tributary Intake
11 2,2078 m
3
Perhitungan det
Tabel 2.1 Debit rata-rata Main Intake Tributary Intake
TI
Laporan implementasi pengelolaan lingkungan dan pemantauan lingkungan PLTA Renun 2008-2010
Tabel 2.2
Catchment Area
Tributary Intake Catchment Area
km
2
TI-1 Lae Mbara 4,3
TI-2 Lae Mbontar 6,4
TI-3 Lae Simbara 7,9
TI-4 Lae Simartaban 5,7
TI-5 Lae Lembam 9,8
TI-6 Lae Sipatonga 7,1
TI-7 Lae Singilang 11,1
TI-8 Lae Patuak 19,7
TI-9 Lae Sipaha 8,6
TI-10 Lae Pinagar 24,1
TI-11 Lae Manaisai 17,4