54.23 WINRIP DOC MPR CTC MPR No.53 2017 05 20170531 00492

Western I ndonesia National Roads I mprovement Project 4 - 6 Details of the Contract Package are shown in ANNEX P-12 Executive Summary Report . Package No. 13 : Sp. Rukis Tj. Kemuning The construction activities of this package are currently concentrating only at the segment No.3, Sta 43km 56km 13km because the segment No.1, Sta. O km 25km is almost completed except the minor works and the segment No.2, Sta. 25km 43km 18km is still under process for land acquisition and at the end of May 2017 likely to be settled for around 10km. Therefore, this month progress is only 1.61 against the scheduled 8.95 and the accumulative progress as of this month, 48.87 is much behind, -41.21 comparing with the scheduled, 90.08. The Contractor is in process for the extension of time due to unsettled land acquisition. Details of the work progress are shown in ANNEX P-13 Executive Summary Reports. Package No. 14: Painan - Kambang The actual progress of this month, 9.72 is quite huge against the scheduled, 5.08 This month progress is entirely from the progress of Asphalt paving works, 8.89. On the other hand, the progress of preparatory works for asphalt paving works, like pavements widening and shoulder, granular pavement, drainage are mostly zero or very small. Accordingly, the contractor is advised to increase work forces for such preparatory works mentioned the above to maintain the progress of asphalt paving works continuously in coming months as well. ANNEX P-14 Executive Summary Report shows the complete details of the project. Package No. 15: Sibolga Bts. Tapsel As mentioned in the previous report, this package is also much suffering with unsettled land acquisition because the project site is situated in the areas densely populated and the most of the existing roads are very narrow, nevertheless this month progress, 5.9 is fairly achieved comparing with previous months but, the progress as of this month is only 40.57 against the scheduled, 77.50 having significant slippage rate, -36.93. Consequently, unsettled land acquisition, 16.5km is the most important element to be solved earlier. The PPK is currently trying to settle those areas within July 2017. Detailed and work progresses of the contract package are shown in ANNEX P-15 Executive Summary Report . Package No. 16: Seblat Ipuh This month progress has been leaded by Granular Pavement, Drainage, Earthworks and a head progress is maintained as 1.53, comparing the actual progress as of this month, 8.68 and against the scheduled 7.15. On the other hand, progress of structure works, 0.97 is much lagged behind the scheduled, 1.92. ANNEX P-16 Executive Summary Report shows the complete details and work progress of the project.