PIUTANG USAHA Annual Report PLNE 2010

58 annual report 2010 | PT Prima Layanan Enjiniring PT. PRIMA LAYANAN NASIONAL ENJINIRING CATATAN ATAS LAPORAN KEUANGAN 31 DESEMBER 2010 DAN 2009 SERTA UNTUK TAHUN-TAHUN YANG BERAKHIR 31 DESEMBER 2010 DAN 2009 Lanjutan

8. KELEBIHAN KEKURANGAN PENAGIHAN ATAS PENGAKUAN PENDAPATAN KONTRAK

Jumlah progress Jumlah pekerjaan penagihan Rp Rp Rp Rp PT PLN Persero - pihak hubungan istimewa Catatan 22: Review Detail Design Pembangunan PLTU SUMUT 2 x 200 MW 6.448.634.725 6.698.857.343 250.222.618 - Design Review dan Approval Drawing PLTU NTB APBN Lombok 1 x 25 MW, PLTU NTT APBN Atambua 4 x 6 MW dan PLTP Ulumbu APBN 2 x 2,5 MW 14.438.033.110 13.973.919.786 - 464.113.323 Design Review dan Approval Drawing PLTU 1 NTB-Bima 1 x 10 MW, PLTU 2 NTT-Kupang 1 x 15 MW dan PLTU 1 NTT-Ende 2 x 7 MW 15.847.127.596 15.586.056.710 - 261.070.886 Supervisi Konstruksi PLTU Tanjung Jati B konsorsium dengan PT Jaya CM dan PT Amythas 2.897.759.379 3.001.094.286 103.334.907 - Pekerjaan Design, Survey, Soil Investigation, Penyiapan Dokumen Lelang dan Proses Tender Transmisi 150500 kV dan Gardu Induk 150500 kV Tersebar di Wilayah Jawa Tengah, Jawa Timur dan Bali. 36.027.743.328 36.086.347.455 58.604.127 - Pekerjaan Jasa Konsultan Pemeriksaan dan Persetujuan Enjiniring Proyek PLTU Di Luar Jawa Sebagai Bagian Dari Proyek Percepatan 10.000 MW di Wilayah PLN Pembangkitan Sulmapa 8Lokasi PLTU 22.950.035.461 22.902.382.478 - 47.652.983 Design Engineering, Study AMDAL dan Study UKLUPL Gardu Induk dan Transmisi 500150 KV. Design Review Terkait Pembangunan PLTU Cilacap Baru Gitet Rawalo 9.944.948.292 10.420.896.950 475.948.658 - Pekerjaan Supervisi Engineering PLTU Jabar Selatan 2 Pelabuhan Ratu 3 x 350 MW 19.832.810.496 19.975.193.916 142.383.420 - Pekerjaan Supervisi Engineering PLTU Jabar 1 Indramayu 3 x 300 MW 20.597.034.830 20.395.724.344 - 201.310.486 Pekerjaan Supervisi Enjiniring PLTU Tanjung Awar-Awar 2 x 350 MW 2.246.548.435 1.414.833.385 - 831.715.049 Pemeriksaan dan Persetujuan Enjiniring untuk PLTU Bangka dan Belitung 9.154.565.086 8.911.749.441 - 242.815.645 Studi Kelayakan Engineering Services dan Site Investigation 23.361.936.870 23.384.623.777 22.686.907 - Jumlah 1.053.180.637 2.048.678.373 2010 Kelebihan kekurangan penagihan atas pengakuan pendapatan kontrak Nama pelanggan 59 annual report 2010 | PT Prima Layanan Enjiniring PT. PRIMA LAYANAN NASIONAL ENJINIRING CATATAN ATAS LAPORAN KEUANGAN 31 DESEMBER 2010 DAN 2009 SERTA UNTUK TAHUN-TAHUN YANG BERAKHIR 31 DESEMBER 2010 DAN 2009 Lanjutan n LAPORAN KEUANGAN Jumlah progress Jumlah pekerjaan penagihan Rp Rp Rp Rp PT PLN Persero - pihak hubungan istimewa Catatan 22: Review Detail Design Pembangunan PLTU SUMUT 2 x 200 MW 3.348.413.926 5.149.392.371 1.800.978.445 - Review Detail Design Pembangunan PLTU MEULABOH 2 x 100 MW 2.228.233.308 1.269.286.144 - 958.947.164 Review Detail Design Pembangunan PLTU Selat Panjang 2 X 7 MW 509.096.779 - - 509.096.779 Review Detail Design Pembangunan PLTU Bengkalis 2 X 10 MW 475.800.845 - - 475.800.845 Review Detail Design Pembangunan PLTU Tanjung 1.045.868.963 3.788.279.298 2.742.410.335 - Balai Karimun 2 X 7 MW Design Review dan Approval Drawing PLTU NTB APBN Lombok 1 x 25 MW, PLTU NTT APBN Atambua 4 x 6 MW dan PLTP Ulumbu APBN 2 x 2,5 MW 8.027.749.745 4.616.918.500 - 3.410.831.245 Pekerjaan Design, Survey, Soil Investigation, Penyiapan Dokumen Lelang, Studi AMDAL UKL - UPL dan Proses Tender Transmisi 70 150 500 kV dan Gardu Induk 70 150 500 kV tersebar di Wilayah DKI Jakarta, Banten, Jawa Tengah, DIY, Jawa Timur, NTT NTB 10.095.426.960 28.579.963.000 18.484.536.040 - Design Review dan Approval Drawing PLTU 1 NTB-Bima 1 x 10 MW, PLTU 2 NTT-Kupang 1 x 15 MW dan PLTU 1 NTT-Ende 2 x 7 MW 4.822.625.128 - - 4.822.625.128 Design, Survey, Soil Investigation, Penyiapan Dokumen Lelang dan Proses Tender Transmisi 500 kV TX Ungaran - Pedan Ke Mandirancan dan Tanjung Jati B - TX Ungaran - Pedan 8.306.254.282 3.726.408.000 - 4.579.846.282 Pekerjaan Design, Survey, Soil Investigation, Penyiapan Dokumen Lelang dan Proses Tender Transmisi 150500 kV dan Gardu Induk 150500 kV Tersebar di Wilayah Jawa Tengah, Jawa Timur dan Bali. 8.222.103.319 7.270.592.000 - 951.511.319 Kajian Pemanfaatan Material PDP 170.382.903 - - 170.382.903 Pekerjaan Review Detail Design Peralatan EM dan Trafo Interbus GI.275150 kV Simangkuk 1.285.497.837 1.661.220.000 375.722.163 - Pekerjaan Jasa Konsultan Pemeriksaan dan Persetujuan Enjiniring Proyek PLTU Di Luar Jawa Sebagai Bagian Dari Proyek Percepatan 10.000 MW di Wilayah PLN Pembangkitan Sulmapa 8 Lokasi PLTU 6.280.108.270 - - 6.280.108.270 Pekerjaan Design Review dan Drawing Approval PLTU 2 Kalimantan Barat 2 x 27,5 MW 1.220.519.150 - - 1.220.519.150 Jumlah 23.403.646.983 23.379.669.085 2009 Kelebihan kekurangan penagihan atas pengakuan pendapatan kontrak Nama pelanggan