58
annual report 2010 | PT Prima Layanan Enjiniring
PT. PRIMA LAYANAN NASIONAL ENJINIRING CATATAN ATAS LAPORAN KEUANGAN 31 DESEMBER 2010 DAN 2009
SERTA UNTUK TAHUN-TAHUN YANG BERAKHIR 31 DESEMBER 2010 DAN 2009 Lanjutan
8. KELEBIHAN KEKURANGAN PENAGIHAN ATAS PENGAKUAN PENDAPATAN KONTRAK
Jumlah progress Jumlah
pekerjaan penagihan
Rp Rp
Rp Rp
PT PLN Persero - pihak hubungan istimewa Catatan 22:
Review Detail Design Pembangunan PLTU SUMUT 2 x 200 MW
6.448.634.725 6.698.857.343
250.222.618 -
Design Review dan Approval Drawing PLTU NTB APBN Lombok 1 x 25 MW, PLTU NTT APBN Atambua
4 x 6 MW dan PLTP Ulumbu APBN 2 x 2,5 MW 14.438.033.110
13.973.919.786 -
464.113.323 Design Review dan Approval Drawing PLTU 1 NTB-Bima
1 x 10 MW, PLTU 2 NTT-Kupang 1 x 15 MW dan PLTU 1 NTT-Ende 2 x 7 MW
15.847.127.596 15.586.056.710
- 261.070.886
Supervisi Konstruksi PLTU Tanjung Jati B konsorsium dengan PT Jaya CM dan PT Amythas
2.897.759.379 3.001.094.286
103.334.907 -
Pekerjaan Design, Survey, Soil Investigation, Penyiapan Dokumen Lelang dan Proses Tender Transmisi
150500 kV dan Gardu Induk 150500 kV Tersebar di Wilayah Jawa Tengah, Jawa Timur dan Bali.
36.027.743.328 36.086.347.455
58.604.127 -
Pekerjaan Jasa Konsultan Pemeriksaan dan Persetujuan Enjiniring Proyek PLTU Di Luar Jawa Sebagai Bagian
Dari Proyek Percepatan 10.000 MW di Wilayah PLN Pembangkitan Sulmapa 8Lokasi PLTU
22.950.035.461 22.902.382.478
- 47.652.983
Design Engineering, Study AMDAL dan Study UKLUPL Gardu Induk dan Transmisi 500150 KV. Design Review
Terkait Pembangunan PLTU Cilacap Baru Gitet Rawalo 9.944.948.292
10.420.896.950 475.948.658
- Pekerjaan Supervisi Engineering PLTU Jabar Selatan 2
Pelabuhan Ratu 3 x 350 MW 19.832.810.496
19.975.193.916 142.383.420
- Pekerjaan Supervisi Engineering PLTU Jabar 1 Indramayu
3 x 300 MW 20.597.034.830
20.395.724.344 -
201.310.486 Pekerjaan Supervisi Enjiniring PLTU Tanjung Awar-Awar
2 x 350 MW 2.246.548.435
1.414.833.385 -
831.715.049 Pemeriksaan dan Persetujuan Enjiniring untuk
PLTU Bangka dan Belitung 9.154.565.086
8.911.749.441 -
242.815.645 Studi Kelayakan Engineering Services dan
Site Investigation 23.361.936.870
23.384.623.777 22.686.907
- Jumlah
1.053.180.637 2.048.678.373
2010 Kelebihan kekurangan
penagihan atas pengakuan pendapatan kontrak
Nama pelanggan
59
annual report 2010 | PT Prima Layanan Enjiniring
PT. PRIMA LAYANAN NASIONAL ENJINIRING CATATAN ATAS LAPORAN KEUANGAN 31 DESEMBER 2010 DAN 2009
SERTA UNTUK TAHUN-TAHUN YANG BERAKHIR 31 DESEMBER 2010 DAN 2009 Lanjutan
n LAPORAN KEUANGAN
Jumlah progress Jumlah
pekerjaan penagihan
Rp Rp
Rp Rp
PT PLN Persero - pihak hubungan istimewa Catatan 22:
Review Detail Design Pembangunan PLTU SUMUT 2 x 200 MW
3.348.413.926 5.149.392.371
1.800.978.445 -
Review Detail Design Pembangunan PLTU MEULABOH 2 x 100 MW
2.228.233.308 1.269.286.144
- 958.947.164
Review Detail Design Pembangunan PLTU Selat Panjang 2 X 7 MW
509.096.779 -
- 509.096.779
Review Detail Design Pembangunan PLTU Bengkalis 2 X 10 MW
475.800.845 -
- 475.800.845
Review Detail Design Pembangunan PLTU Tanjung 1.045.868.963
3.788.279.298 2.742.410.335
- Balai Karimun 2 X 7 MW
Design Review dan Approval Drawing PLTU NTB APBN Lombok 1 x 25 MW, PLTU NTT APBN
Atambua 4 x 6 MW dan PLTP Ulumbu APBN 2 x 2,5 MW
8.027.749.745 4.616.918.500
- 3.410.831.245
Pekerjaan Design, Survey, Soil Investigation, Penyiapan Dokumen Lelang, Studi AMDAL UKL -
UPL dan Proses Tender Transmisi 70 150 500 kV dan Gardu Induk 70 150 500 kV tersebar di
Wilayah DKI Jakarta, Banten, Jawa Tengah, DIY, Jawa Timur, NTT NTB
10.095.426.960 28.579.963.000
18.484.536.040 -
Design Review dan Approval Drawing PLTU 1 NTB-Bima 1 x 10 MW, PLTU 2 NTT-Kupang
1 x 15 MW dan PLTU 1 NTT-Ende 2 x 7 MW 4.822.625.128
- -
4.822.625.128 Design, Survey, Soil Investigation, Penyiapan
Dokumen Lelang dan Proses Tender Transmisi 500 kV TX Ungaran - Pedan Ke Mandirancan dan
Tanjung Jati B - TX Ungaran - Pedan 8.306.254.282
3.726.408.000 -
4.579.846.282 Pekerjaan Design, Survey, Soil Investigation,
Penyiapan Dokumen Lelang dan Proses Tender Transmisi 150500 kV dan Gardu Induk 150500 kV
Tersebar di Wilayah Jawa Tengah, Jawa Timur dan Bali.
8.222.103.319 7.270.592.000
- 951.511.319
Kajian Pemanfaatan Material PDP 170.382.903
- -
170.382.903 Pekerjaan Review Detail Design Peralatan EM dan
Trafo Interbus GI.275150 kV Simangkuk 1.285.497.837
1.661.220.000 375.722.163
- Pekerjaan Jasa Konsultan Pemeriksaan dan
Persetujuan Enjiniring Proyek PLTU Di Luar Jawa Sebagai Bagian Dari Proyek Percepatan 10.000 MW
di Wilayah PLN Pembangkitan Sulmapa 8 Lokasi PLTU
6.280.108.270 -
- 6.280.108.270
Pekerjaan Design Review dan Drawing Approval PLTU 2 Kalimantan Barat 2 x 27,5 MW
1.220.519.150 -
- 1.220.519.150
Jumlah 23.403.646.983
23.379.669.085 2009
Kelebihan kekurangan penagihan atas pengakuan
pendapatan kontrak Nama pelanggan