Implementation Support Components WINRIP DOC MPR CTC MPR No.36 2015 12 20151231 00329

Western I ndonesia National Roads I mprovement Project 6 - 6  The need for re-arrangement of the duty travel budget by the project, as well as the Amendment 4, that have been in process and the results should be waited;  At least three trainings initially scheduled to be delivered in this reporting month December were then postponed, i.e:  The fourth 4 th IFR Training or Training on Preparing Interim un-audited Financial Report IFR was initially scheduled to be held in Padang on the 2 nd week of December 2015. But it was then postponed by the PMU to mid of January next year 2016.  The PMM Application Training 3, initially scheduled for being delivered on the end of November 2015, was postponed to mid of January next year 2016.  The seventh 7 th RKPPL Training was scheduled to be carried out in January 2016 in Padang. Preparation has been underway.: identifying the prospective participants, venues, checking and modifying the training materials.  However, at the end of this reporting month, the project then informed that, unfortunately, all those three trainings will not be delivered earlier than March next year 2016, while awaiting the results of the duty travel budget re-arrangement and Amendment 4.  The work was then focused on the following activities:  Continue to prepare the implementation of those three training: modifying letter of invitation, checking the training materials, modifying the combination of packages involved as well as prospective participants as required in compliance with the CTC Timeline, identifying the suitable venues, etc.  Continuing to update the PMM related to the new organization structure of the Ministry of Public Works and Housing as well as the DGH,, new regulation, NCB procurement , and the experiences of implementing the project up to now.  Asking for confirmation of the mobilization of contractors an consultants in every package.  Assisting in revising the duty ravel budget plan for 2016-2017, as well as completing the draft of Amendment 4 annexes as required.

6.3.2 Progress

 In terms of training delivery, no training was delivered during this reporting month, so that no one was trained.  However, the preparation of the next training run better, some of the revisions of the PMM were done as required while awaiting for the new decree concerning for instant the revision of PMU organization

6.3.3 Activities Plan for next month January 2016

 Continuing the preparation of some training to be implemented on the first opportunity.  Continuing to update the PMM and other training materials as required.  Continuing to ask for confirmation of the mobilization of contractors and consultants staff of the respective packages. Western I ndonesia National Roads I mprovement Project 6 - 7 Summ ary of Wor kshops and Trai nings WI NRIP 2012 2016 Per : 31 th December 2015 No. Activities Location Date Number of Attendances Remarks Target Real. 1. Procurement Training for Procurement Working Group Procurement Committee Bandung 1-2 Nov, 2012 44 36 82 Completed Conducted before the CTC was mobilized 2. Workshop on Bid Documents Evaluation Jakarta 27 Feb.- 1Mar 2013 46 33 72 Completed 3 Workshop on World Bank Procurement Guidelines for WINRIP Tj. Pandan Belitung 24 -25 Apr. 2013 47 39 83 Completed 4. Workshop for Project Management Manual PMM Updating Jakarta 18 -19 ar.2014 47 38 81 Completed 5 RKPPL Training 1 First Training on Rencana Kerja Pengelolaan dan Pemantauan Lingkungan RKPPL or Environmental Management and Monitoring Work Plan Lampung 5-6 June 2014 10 13 130 Completed Mainly addressed to the Contractors Supervision Consultants of Package 01: Krui Biha 6 TPM Traaining 1 First Training on Third Party Monitoring Lampung 5-6 June 2014 10 13 130 Completed Mainly addressed to TPM Team members of Package 01: Krui-Biha 7 Workshop for Project Management Manual Finalization of Updating Bogor 12 -14 June 2014 45 33 73 Completed 8 RKPPL Training 2 Second Training on Rencana Kerja Penge-lolaan dan Pemantauan Lingkungan RKPPL or Environmental Manage- ment and Monitoring Work Plan Padang 18 -19 June 2014 18 25 138,9 Completed Mainly addressed to the Contractors Supervision Consultants of Packages 02 and 03 9 TPM Training 2 Second Training on Third Party Monitoring Padang 18-19 June 2014 18 25 138,9 Completed Mainly addressed to TPM team members of Packages 02 and 03 10 RKPPL Training 3 Third Training on Rencana Kerja Pengelolaan dan Pemantauan Lingkungan RKPPL or Environmental Management and Monitoring Work Plan Bengkulu 7-8 July 2014 10 11 110 Completed Mainly addressed to the Contractors Supervision Consultants of Packages 04: Ipuh Bantal 11 TPM Training 3 Third Training on Third Party Monitoring Bengkulu 7-8 July 2014 10 11 110 Completed Mainly addressed to TPM team members of Package 04 12 Workshop for Socialization of Updated Draft of Project Management Manual PMM Padang 10 -11 Sep. 2014 94 81 86 Completed 13 IFR Training 1 First Training on Interim unaudited Financial Report Padang 26-27 Nov. 2014 24 20 83 Completed Packages: 01, 02, 03 and 04; and related Satkers and PPKs. Sub-Total per 31 Dec. 2014 : 423 378 89