Monitoring Report of the LARAP Package No. 11
16. Monitoring Report of the LARAP Package No.16
: Seblat - Ipuh Province : Bengkulu A. Previous Status : • World Bank issued on May 30, 2014 a No Objection Letter NOL on the revised LARAP documents for implementation. • World Bank issued No Objection Letter NOL on Monitoring Report No.1 and 2 for LARAP implementation. • Monitoring Report for 102 of the remaining 120 PAPs was given No Objection Letter NOL by World Bankon November 26, 2015. B. Pending Issues, Concern and Actions a LARAP documents for this Package covers only land acquisition for the road link. If there are land acquisition for the bridge site, a separate LARAP documents need to be prepared. b LARAP Implementation is underway for the remaining 120 PAP be allocated 2015 national budget and schedule to be settled on Dec 2015. C. Update during this reporting month of December 2015 a All of the total 259 PAPs already paid by Satker PJN I Bengkulu. b Data of the payments to the 18 PAP Balance from 259 PAPs are under preparation17. Monitoring Report of the LARAP Package No.17
: Sp. Gunung Kemala Pg. Tampak Province : Lampung A. Previous Status : • World Bank approved the corrected LARAP documents on November 12, 2013 • Monitoring Report for 154 of the total 2.273 PAPs was given No Objection Letter NOL on October 13, 2015. • Monitoring Report for 735 of the remaining 2.119 PAPs was given No Objection Letter NOL on November 26, 2015 B. Pending Issues, Concern and Actions a Monitoring Report for the compensation payments for the remaining 1.384 PAPs has to be submitted to World Bank. C. Update during this reporting month of December 2015 a Compensation payments for the remaining 2.220 from 2.273 PAP have been already released. And payment for the remaining 53 PAP is under process b PMU waiting data of payment progress from Satker PJN II Lampung18. Monitoring Report of the LARAP Package No.18
: Mukomuko Bts. Sumbar Province : Bengkulu The sub-project is proposed to be deleted from the WINRIP Program.Parts
» WINRIP DOC MPR CTC MPR No.36 2015 12 20151231 00329
» Current Implementation Situation Civil Works
» Disbursement WINRIP DOC MPR CTC MPR No.36 2015 12 20151231 00329
» Package No.12 Kambang - Indrapura AWP-2
» Package No.16 Seblat-Ipuh AWP-3
» Package No.14 Painan - Kambang AWP-3
» Package No.20 Lubuk Alung - Sicincin AWP-3
» Package No.21 Lubuk Alung - Kuraitaji AWP-3
» Technical Assistance for Capacity Building for Disaster Risk Reduction
» Technical Assistance for Capacity Building for Environmental Management
» Technical Assistance for Capacity Building for Road Safety
» World Bank Implementation Review Mission and Site Visit Background
» Project Development WINRIP DOC MPR CTC MPR No.36 2015 12 20151231 00329
» Project Objective WINRIP DOC MPR CTC MPR No.36 2015 12 20151231 00329
» CTC Consultants WINRIP DOC MPR CTC MPR No.36 2015 12 20151231 00329
» DSC Consultants WINRIP DOC MPR CTC MPR No.36 2015 12 20151231 00329
» Detailed Design Preparation WINRIP DOC MPR CTC MPR No.36 2015 12 20151231 00329
» Procurements WINRIP DOC MPR CTC MPR No.36 2015 12 20151231 00329
» Civil Works Implementation WINRIP DOC MPR CTC MPR No.36 2015 12 20151231 00329
» Civil Works Progress WINRIP DOC MPR CTC MPR No.36 2015 12 20151231 00329
» -5.06 WINRIP DOC MPR CTC MPR No.36 2015 12 20151231 00329
» 10 CD WINRIP DOC MPR CTC MPR No.36 2015 12 20151231 00329
» 93.20 WINRIP DOC MPR CTC MPR No.36 2015 12 20151231 00329
» 96.30 WINRIP DOC MPR CTC MPR No.36 2015 12 20151231 00329
» 70.32 WINRIP DOC MPR CTC MPR No.36 2015 12 20151231 00329
» -32.91 WINRIP DOC MPR CTC MPR No.36 2015 12 20151231 00329
» 350 CD WINRIP DOC MPR CTC MPR No.36 2015 12 20151231 00329
» -29.38 WINRIP DOC MPR CTC MPR No.36 2015 12 20151231 00329
» 161 CD WINRIP DOC MPR CTC MPR No.36 2015 12 20151231 00329
» -0.56 WINRIP DOC MPR CTC MPR No.36 2015 12 20151231 00329
» 415 CD WINRIP DOC MPR CTC MPR No.36 2015 12 20151231 00329
» 13.71 WINRIP DOC MPR CTC MPR No.36 2015 12 20151231 00329
» 769 CD WINRIP DOC MPR CTC MPR No.36 2015 12 20151231 00329
» 3.05 WINRIP DOC MPR CTC MPR No.36 2015 12 20151231 00329
» Quality Assurance WINRIP DOC MPR CTC MPR No.36 2015 12 20151231 00329
» Environmental Quarterly Report Environmental and Social Considerations
» Monitoring Report of the LARAP Package No. 1
» Monitoring Report of the LARAP Package No. 2
» Monitoring Report of the LARAP Package No. 3
» Monitoring Report of the LARAP Package No. 4
» Monitoring Report of the LARAP Package No. 5
» Monitoring Report of the LARAP Package No. 6
» Monitoring Report of the LARAP Package No. 7
» Monitoring Report of the LARAP Package No. 8
» Monitoring Report of the LARAP Package No. 9
» Monitoring Report of the LARAP Package No. 10
» Monitoring Report of the LARAP Package No. 11
» Monitoring Report of the LARAP Package No. 12
» Monitoring Report of the LARAP Package No. 15
» Monitoring Report of the LARAP Package No.16
» Monitoring Report of the LARAP Package No.17
» Monitoring Report of the LARAP Package No.18
» Monitoring Report of the LARAP Package No.19
» Monitoring Report of the LARAP Package No. 20
» Monitoring Report of the LARAP Package No. 21
» Anti Corruption Issues WINRIP DOC MPR CTC MPR No.36 2015 12 20151231 00329
» Road Safety Audit WINRIP DOC MPR CTC MPR No.36 2015 12 20151231 00329
» Letter Database System, used to record all information of incoming and
» Document Library System, used to record all information of document and
» Implementation Support Components WINRIP DOC MPR CTC MPR No.36 2015 12 20151231 00329
» 13, and 15. Being postponed by PMU, awaiting
» Management Information System WINRIP DOC MPR CTC MPR No.36 2015 12 20151231 00329