Western I ndonesia National Roads I mprovement Project 1 - 6

4. Package No.12 Kambang - Indrapura AWP-2

This sub-project is under implementation schedule AWP-2. The project roadline is located in the Province of Sumatera Barat having an approximate length of 55.20 kilometers. The Contract Package is procured thru the post qualification and International Competitive Bidding ICB procurement method using the Full e-Procurement System. During the period December 2015, refinement of contract documents in preparation to contract signing between the GOI and the winning responsive bidder, PT. Lancar Jaya M.A. PT. LTA JO has been under finalization. It is expected that the contract signing by both parties will be executed during the middle part of January 2016.

5. Package No.16 Seblat-Ipuh AWP-3

The sub-project is to be implemented under implementation schedule AWP-3. The Project road length covers 34.50 kilometers and is located in the Province of Bengkulu. The Contract Package is procured thru post qualification criteria and National Competitive Bidding NCB method using the Full e-Procurement System. Bid Evaluation and preparation of Bid Evaluation Report BER is on-going.

6. Package No.14 Painan - Kambang AWP-3

The Subject is to be implemented under implementation schedule AWP-3. The Project road lenght covers 31.50 kilometers and is located in the Province of West Sumatera. The Contract Package is procured thru post qualification criteria and National Competitive Bidding NCB using the Full e-Procurement System. The sub-project is under procurement procceeding with bid submissions and opening scheduled on January 5, 2016 at Padang.

7. Package No.20 Lubuk Alung - Sicincin AWP-3

The Subject is to be implemented under implementation schedule AWP-3. The Project road lenght covers 14.60 kilometers and is located in the Province of West Sumatera. The Contract Package is procured thru post qualification criteria and National Competitive Bidding NCB using the Full e-Procurement System. The sub-project is under procurement procceeding with bid submissions and opening scheduled on January 5, 2016 at Padang

8. Package No.21 Lubuk Alung - Kuraitaji AWP-3

The Subject is to be implemented under implementation schedule AWP-3. The Project road lenght covers 16.80 kilometers and is located in the Province of West Sumatera. The Contract Package is procured thru post qualification criteria and National Competitive Bidding NCB using the Full e-Procurement System. The sub-project is under procurement procceeding with bid submissions and opening scheduled on January 5, 2016 at Padang Western I ndonesia National Roads I mprovement Project 1 - 7 1.5 Procurement of Three 3 Consultancy Packages Under Category 3 of the Loan Agreement, Part 3: Road Sector Institutional Development

1. Technical Assistance for Capacity Building for Disaster Risk Reduction

The Technical Assistance for Disaster Risk reduction was canceled based on the following reasons: 1 An evaluation of this activity following guidance from the Minister of Public Works and Housing negate its effectiveness and efficiency. 2 In accordance with the results of meeting between DGH and the WB on the 12 of October 2015, it was decided to cancel the Technical Assistance for Capacity Building for Disaster Risk Reduction and replaced by a Technical Assistance for Slope Protection Design and Management under Loan Category-2 Work activity during the month on this technical assistance is the preparation of TOR and EE.

2. Technical Assistance for Capacity Building for Environmental Management

Propose to be deleted.

3. Technical Assistance for Capacity Building for Road Safety

Propose to be deleted.