Environmental Quarterly Report Environmental and Social Considerations
4. Monitoring Report of the LARAP Package No. 4
: Ipuh Bantal Province : Bengkulu A. Previous Status : • LARAP documents approved by World Bank on December 10, 2012 • Monitoring Report No.1, 2 and 3 already approved and No Objection Letter NOL were issued by World Bank B. Pending Issues, Concern and Actions • No more issue, LARAP fully completed. C. Update during this reporting month of July 2016 a Construction completed in April 11, 2016. b Total PAP = 261 ; Compensated = 261 ; Percent complete = 100.5. Monitoring Report of the LARAP Package No. 5
: Sp. Rampa Poriaha Province : Sumatera Utara A. Previous Status : • LARAP documents approved by World Bank on September 16, 2013. • World Bank accepted the revised LARAP documents and issued No Objection Letter on November 12, 2013 to the action plan implementation of the LARAP. • Additional LARAP documents approved by World Bank on January 8, 2016. B. Pending Issues, Concern and Actions a Still to be submitted is the implementation report from Satker of the completed relocation of the kiosk. b Existing permit on forest land for road project from Ministry of Forest still need to be clarified.. c Monitoring Report for the LARAP implementation of the completed relocation of the kiosk still to be prepared for submission to World Bank. d Monitoring Report for the compensation payments of the 68 PAP still to be prepared for submission to WB. C. Update during this reporting month of July 2016 a Monitoring Report for the payments of the 68 PAPs are under preparation. b Total PAP = 71 ; Compensated = 68; Percent Complete = 96.6. Monitoring Report of the LARAP Package No. 6
: Pasar Pedati - Kerkap Province : Bengkulu A. Previous Status :Parts
» WINRIP DOC MPR CTC MPR No.43 2016 7 20160729 00432
» Current Implementation Situation Civil Works
» Disbursement WINRIP DOC MPR CTC MPR No.43 2016 7 20160729 00432
» Package No.10 Sp. Empat Package No.16 Seblat-Ipuh AWP-3
» Package No.14 Painan - Kambang AWP-3
» Package No.20 Lubuk Alung - Sicincin AWP-3
» Package No.21 Lubuk Alung - Kuraitaji AWP-3
» World Bank Implementation Review Mission and Site Visit Background
» Project Development WINRIP DOC MPR CTC MPR No.43 2016 7 20160729 00432
» Project Objective WINRIP DOC MPR CTC MPR No.43 2016 7 20160729 00432
» CTC Consultants WINRIP DOC MPR CTC MPR No.43 2016 7 20160729 00432
» DSC Consultants WINRIP DOC MPR CTC MPR No.43 2016 7 20160729 00432
» Technical Assistance for Development of Slope Stabilization, Design and
» Detailed Design Preparation WINRIP DOC MPR CTC MPR No.43 2016 7 20160729 00432
» Procurements WINRIP DOC MPR CTC MPR No.43 2016 7 20160729 00432
» Civil Works Implementation WINRIP DOC MPR CTC MPR No.43 2016 7 20160729 00432
» Civil Works Progress WINRIP DOC MPR CTC MPR No.43 2016 7 20160729 00432
» -42.93 WINRIP DOC MPR CTC MPR No.43 2016 7 20160729 00432
» 136 CD WINRIP DOC MPR CTC MPR No.43 2016 7 20160729 00432
» 45.15 -11.28 WINRIP DOC MPR CTC MPR No.43 2016 7 20160729 00432
» 201 CD WINRIP DOC MPR CTC MPR No.43 2016 7 20160729 00432
» 656 CD WINRIP DOC MPR CTC MPR No.43 2016 7 20160729 00432
» 18.55 5.96 WINRIP DOC MPR CTC MPR No.43 2016 7 20160729 00432
» 17.41 WINRIP DOC MPR CTC MPR No.43 2016 7 20160729 00432
» Quality Assurance WINRIP DOC MPR CTC MPR No.43 2016 7 20160729 00432
» Review Design Integration, Road Safety Aspects and Monitoring of Environmental Studies
» The Contractor Action Plan on Environmental Management and Monitoring RKPPL
» Environmental Quarterly Report Environmental and Social Considerations
» Socialization of HIV-AIDs Campaign
» Monitoring Report of the LARAP Package No. 1
» Monitoring Report of the LARAP Package No. 2
» Monitoring Report of the LARAP Package No. 3
» Monitoring Report of the LARAP Package No. 4
» Monitoring Report of the LARAP Package No. 5
» Monitoring Report of the LARAP Package No. 6
» Monitoring Report of the LARAP Package No. 7
» Monitoring Report of the LARAP Package No. 8
» Monitoring Report of the LARAP Package No. 9
» Monitoring Report of the LARAP Package No. 10
» Monitoring Report of the LARAP Package No. 11
» Monitoring Report of the LARAP Package No. 12
» Monitoring Report of the LARAP Package No. 13 Monitoring Report of the LARAP Package No. 14
» Monitoring Report of the LARAP Package No. 15
» Monitoring Report of the LARAP Package No.16
» Monitoring Report of the LARAP Package No.17
» Monitoring Report of the LARAP Package No.18
» Monitoring Report of the LARAP Package No.19
» Monitoring Report of the LARAP Package No. 20
» Monitoring Report of the LARAP Package No. 21
» Anti Corruption Issues WINRIP DOC MPR CTC MPR No.43 2016 7 20160729 00432
» Road Safety Audit WINRIP DOC MPR CTC MPR No.43 2016 7 20160729 00432
» Letter Database System, used to record all information of incoming and
» Document Library System, used to record all information of document and
» Implementation Support Components WINRIP DOC MPR CTC MPR No.43 2016 7 20160729 00432
» TRAINING TO SUPPORT PROJECT IMPLEMENTATION
» PPK WINRIP DOC MPR CTC MPR No.43 2016 7 20160729 00432
» Road Safety Audit Management Information System
Show more