ADAPTATION IMPLEMENTATION OF ACTION
93
No Activities
Time Frames 2007-2009
Responsible Institutions
2009-2012 Responsible
Institutions 2012-2025
Responsible Institutions
2025-2050 Responsible
Institutions 1
Water Resource
1. Inventory of raw water intake
2. Rehabilitation of hydrology
network. 3. Restoration of
river watershed area in stages.
4. Conducting in pond develop-
ment programs of pond and
reservoirs. 5. Water saving
movement. 6. Inventory of peat
land area State Ministry of
Environment, De- partment of Public
Works, Department of Forestry, National
Coordination Body for Survey and
Mapping and Local Government.
1. Restoration of river watershed
area in stages. 2. Change in
operational and maintenance of
reservoir and its supporting struc-
tures to adjust to climate change.
3. Conduct geo hy- drology research
in order to know groundwater
catchments basin. 4. Water saving
movement 5. Monitoring the
watershed area land cover
State Ministry of Environment, De-
partment of Public Works, KMNRT and
Local Government. 1. Develop trench
dam technology. 2. Develop technol-
ogy that could enable salt water
to become drink- ing water
3. Rehabilitate water managementin
peat land area. 4. Restoration of
river watershed area in stages.
5. Water saving movement
State Ministry of Environment, De-
partment of Public Works, Department
of Forestry, KMNRT and Local Govern-
ment. 1. Conducting in
pond develop- ment programs
of pond and reservoirs
2. Restoration of river watershed
area in stages. 3. Water saving
movement State Ministry of
Environment, De- partment of Public
Works, Department of Forestry, KMNRT
and Local Govern- ment.
2 Agriculture
1. Increase the utili- zation of drought
prone map. 2. Conduct water
saving agriculture activities.
3. Implement good agriculture
practices. 4. Implement the
acceleration planting with
appropriate technology.
5. Rehabilitate and increase irrigation
network. 6. Optimize alternate
system in water irrigation distribu-
tion. Dept. of Marine
Affairs and Fisheries, State Ministry of
Environment, Dept. of Public Works and
Local Government. 1. Develop drought
early warning system.
2. Increase the utilization of
alternative water resource poten-
tial. 3. Empowered the
P3A institution. 4. Strengthened
the institution of water use farmer.
5. Empower the farmer group
to arrange the planting schedule
and decide the beginning of
planting season. 6. Develop food
diversiication policy.
State Ministry of Environment, Dept.
of Public Works and Local Government.
1. Conduct climate anomaly impact
analysis toward seasonal shift to
decide the begin- ning of planting
season 2. Conduct research
on superior seeds that resistance to
climate change. 3. Development of
adaptive track husbandry.
4. Research program on government
strategy and policy to address
climate change in agriculture sector.
Ministry of Environ- ment, Dept. of
Public Works and Lo- cal Government.
1. Improve various existing step and
strategy based on evaluation to
various concepts, strategy, efforts
and technology that have been
implemented in previous period.
2. Develop various innovative tech-
nology, particu- larly for superior
adaptive variation and technology
for management of land and water
that have been produced in previ-
ous period. Dept. of Agriculture,
KMNRT, State Minis- try of Environment,
Dept. of Public Works and Local
Government.