Monthly Progress Report August 2013 Western I ndonesia National Roads I mprovement Project 41 6.9 Project Risks and Mitigation Measures 6.9.1 Risks Related to Delays Since the detailed engineering design DED is under responsibility of the Design and Supervision Consultant DSC, delay on DSC establishment affected to the procurement of AWP-2 and AWP-3 sub-projects. As discussed previously above, the DED of several subprojects of WP-2 and WP-3 were prepared and completed by respective P2JN. The CTC has then been instructed by DGH to review the DEDs of seven packages completed by the P2JNs package 5, 6, 11, 13, 15, 17 and 19.

6.9.2 Financial Risks

The following factors will be monitored during implementation of the loan project. • Loan Amount • Actual Tender Prices • Price Adjustment • Currency Fluctuation • Current Estimated Situation No risk was detected until preparation of this report since the main program of the loan civil works implementation has not yet been started with contract sign.

6.9.3 Risks Related to Quality

The quality of work is inherently tied to the competence of the Contractors and the diligence of the Supervision Teams. The competence or otherwise of contractors shall be considered at the time of bid evaluation and prior to the award of any contract. The quality of supervision however is influenced by the following factors: • Ensuring that supervision staff levels are fully manned with competent, honest, qualified and experienced personnel. • The provision of properly equipped laboratories with properly trained operators for each package. Package supervision comes under the responsibilities of the immediate supervision teams and the relevant DSC but the Quality Assurance Engineer from CTC, when mobilized, will periodically monitor their performance. Monthly Progress Report August 2013 Western I ndonesia National Roads I mprovement Project 42 7 ISSUES and RECOMMENDATIONS

7.1 Current Situation

The main issue during August 2013 is still the procurement of four 4 packages under AWP-1. The committees had finished their Bid Evaluation Report BER and CTC also had made consolidated report for all packages. Proposed BER had been sent to the World Bank for approval. The existing road conditions of the four packages under AWP-1, which are predicted being deteriorated rapidly by the traffic during almost a year, shall be anticipated. Another issue is establishment and mobilization of the Design and Supervision Consultant DSC especially the Design Team. The DEDs for AWP-2 and AWP-3 packages, including the 7 packages under CTC review at the current time, shall be completed soonest and the procurement can be started immediately.

7.2 Action Required

Based on the past experience when the Pokja need long time to prepared the AER, for this bidding stage hopefully the POKJA could be finalized the Bidding Evaluation Report BER in sufficient time as scheduled with full support from CTC WINRIP. It is required to immediately mobilize the Design Team of DSC contract signing process following up the contract signing on June 11, 2013. Western I ndonesia National Roads I mprovement Project Appendix A Overall Loan Progress Exchange Rate : 1 equal to IDR 9,750 31 August 2013 Estimated Contractors or Total Est. Budget Starting Completion Consultants Man-Month WB + GOI Remarks Date Date Name Excl. the PIP Original Revised Physical Man-Month Physical Man-Month Physical Man-Month Supp. Staff USD, Excl.VAT Excl. VAT Excl. VAT MM MM MM 1 Betterment and Capacity 314,900,000.00 Expansion of National Roads 1.A AWP-1 ICB DGH 81,630,000.00 Procurement process prequalification. 1.B AWP-2 and AWP-3 ICB NCB DGH 227,100,000.00 Detailed Engineering Design preparation. 1.C Contingency - DGH 6,170,000.00 2 Implementation Support 16,000,000.00 2.A Core Team Consultants CTC QCBS DGH 6-Nov-12 15-Feb-16 PT. Perentjana Djaja 556 5,000,000.00 1,276,700.00 28.780 160.02 24.284 135.02 -4.496 -25.00 Ongoing Joint Venture with Rp21,415,400,000.00 Yongma Engineering Co.Ltd. Or US equivalent total : PT. Epadascon Permata 3,473,151.28 2.B Design Superv. Consultants QCBS DGH 19-Jun-13 18-Nov-16 Renardet S.A. 1,068 10,000,000.00 820,600.00 1.342 14.33 0.780 8.33 -0.562 -6.00 Mobilization process. Joint Venture with Rp51,818,705,000.00 PT Cipta Strada Or US equivalent total : PT. Daya Creasi Mitrayasa 6,135,338.97 PT. Seecons PT. Yodya Karya 2.C Incremental Operating Cost Varies PMU 1,000,000.00 Including Technical Audits 3 Road Sector Institutional 1,000,000.00 Development 3.A Capacity Building for NCB DGH 350,000.00 Preparation of TOR. Disaster Risks Reduction 3.B Capacity Building for NCB DGH 350,000.00 Preparation of TOR. Environmental Management 3.C Capacity Building for NCB DGH 300,000.00 Preparation of TOR. Road Safety 4 Contingency for Disaster DGH - Risk Response 5 Unallocated DGH 18,100,000.00 Total 350,000,000.00 9,608,490.26 0.309 160.02 0.255 135.02 -0.054 -25.00 Appendix - A OVERALL PROGRESS STATUS Description WESTERN INDONESIA NATIONAL ROADS IMPROVEMENT PROJECT WINRIP IBRD LOAN No. 8043-ID Proc. Method Category Planned Actual Balance PROGRESS Respon- sibility Contract ValueBudget Total WB + GOI CTC 30-Nov-12 31-Dec-12 31-Jan-13 28-Feb-13 31-Mar-13 30-Apr-13 31-May-13 30-Jun-13 31-Jul-13 31-Aug-13 30-Sep-13 31-Oct-13 30-Nov-13 Team Leader 25-Mar-13 0.25 1.25 2.25 3.25 4.25 5.25 6.25 7.25 8.25 Senior Highway 1-Feb-13 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00 Senior Proc Senior Road Sft 1-May-13 1.00 2.00 3.00 4.00 5.00 6.00 7.00 Ass. TL 19-Nov-12 0.33 1.33 2.33 3.33 4.33 5.33 6.33 7.33 8.33 9.33 10.15 11.15 12.15 Highway Eng 19-Nov-12 0.33 1.33 2.33 3.33 4.33 5.33 6.33 7.33 8.33 9.33 10.15 11.15 12.15 Qualty Ass. Eng 1-Jul-13 1.00 2.00 2.82 3.82 4.82 Financial 19-Nov-12 0.33 1.33 2.33 3.33 4.33 5.33 6.33 7.33 8.33 9.33 10.15 11.15 12.15 Enviro 17-Dec-12 0.45 1.45 2.45 3.45 4.45 5.45 6.45 7.45 8.45 9.27 10.27 11.27 Socio 19-Nov-12 0.33 1.33 2.33 3.33 4.33 5.33 6.33 7.33 8.33 9.33 10.15 11.15 12.15 Proc. Speclt-1 Proc. Speclt-2 19-Nov-12 0.33 1.33 2.33 3.33 4.35 5.35 6.35 7.35 8.35 9.35 10.35 11.35 12.35 MIS 1-May-13 1.00 2.00 3.00 4.00 5.00 6.00 7.00 Comm.Devlp. 3-Jan-13 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00 11.00 Total Prof 1.65

7.10 14.10

22.10 30.37

39.37 50.36

61.36 73.36

85.36 96.29

108.29 120.29 Ass. Highway Ass. Financial 19-Nov-12 0.33 1.33 2.33 3.33 4.33 5.33 6.33 7.33 8.33 9.33 10.33 11.33 12.33 Ass. EnvSocio 19-Nov-12 0.33 1.33 2.33 3.33 4.33 5.33 6.33 7.33 8.33 9.33 10.33 11.33 12.33 Ass. MIS 3-Jan-13 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00 11.00 Ass. Comm. Dev 1-Feb-13 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00 Ass. Proc-1 3-Jan-13 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00 11.00 Ass. Proc-2 3-Jan-13 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00 11.00 Total Sub Prof 0.66

2.66 7.66

13.66 19.66

25.66 31.66

37.66 43.66

49.66 55.66

61.66 67.66

Grand Total 2.31

9.76 21.76

35.76 50.03

65.03 82.02

99.02 117.02

135.02 151.95 169.95 187.95 Mobilized Total Manmonth Up To 28-Feb-02 Contract Package Original Add Actual To Original To Add days days days Constr. Escalation T O T A L DIV0 - DIV0 DIV0 DIV0 DIV0 DIV0 109,670.00 Total Contractors Time Elapsed This Month Eq.Rp.Million Original 31 August 2013 To date Addendum Eq.Rp.Million Eq.Rp.Million Eq.Rp.Million To date Appendix - A1 IBRD LOAN No. 8043-ID Scheduled TIME Contract Sum Incl. Tax in Rp Million Last Month SUMMARY OF OVERALL PHYSICAL PROGRESS OF CIVIL WORK AWP-1 WESTERN INDONESIA NATIONAL ROADS IMPROVEMENT PROJECT WINRIP Const.Period Accumulate Progress of Civil Works