Monitoring of Environmental Aspects During Construction
Monthly Progress Report August 2013
Western I ndonesia National Roads I mprovement Project 17
studies and Environmental issues will integrated to design, Prepare environmental mitigation on construction stage for contractor Contractor Program for Executing Environmental
Managemen Plan CPEMPRKPPL. Therefore CTC will proposed that staff visit the site of projects subject to studies or issues, and ensure that the plans are being implemented. A
schedule for these visits on process.
4.6.4.CTC Site Visit : Technical Assistance for LARAP Preparation
CTC site visit to carried out technical assistance to the local consultant in BBPJN II for LARAP preparation on 13 to 14 Aug 2013. On the forum CTC conducted Presentation
concerning LARAP preparation for packages on WINRIP and explain about WB LARFramework, procedures, mechanism, manual, format LARAP studies category simple
or full LARAP, substance of LARAP, socio-economic surveys, procedures of public consultation and sozialization on LARAP process compensation for lands asset of PAPs,
declaration letter and questioner format on LARAP etc.