7.22 0.01 1.84 23.78 2.73 6.85 6.56 0.12 5.60 0.94 7.04 0.15 7.04 46.76 1.56 30.64 5.36 0.27 4.23 1.91 37.50 35.31 47.72 65.59 84.21 100.00 WINRIP DOC MPR CTC MPR No.29 2015 05 20150531 00269

MONTH : Package No. Time Elapsed Days 502 Name Time Elapsed 78.44 Project Manager Scheduled Progress 56.69 Contractor PT JAYA KONSTRUKSI MP, Tbk Actual Overall Progress 37.50 Supervision Consultant Balance -19.18 - Insufficsent supply of aggregate for base course - Find out another aggregate supplier Contract Sign Progress This Month 4.84 asphalt concrete Commencement Date - Shortage of labor Time for Complation Days 640 Take Over Date Status date Contract Amount Rp. Accumulative Rp. 16.50 Contract Amount Add-1 + PPN Rp. Include advance payment Comp Add.1 Accum Actual Accum Accum Total Total Last this to this Sch to this Month Month Month Month I G e n e r a l

8.25 7.22

2.11 0.01

2.12 1.84

II D r a i n a g e

34.19 23.78

12.26 2.73

14.99 6.85

III Earthworks

3.95 6.56

3.11 0.12

3.23 5.60

IV Pavement Widening Shoulders

1.47 0.94

- - - 0.00 V Granular Pavement

9.22 7.04

2.36 0.15

2.51 7.04

VI Asphalt Pavement

40.14 46.76

9.44 1.56

11.00 30.64

VII S t r u c t u r e s

1.09 5.36

3.00 0.27

3.27 4.23

VIII Reinstatement Minor Works

1.20 1.91

0.13 -

0.13 0.13 IX Day Work

0.14 0.12

- - - 0.09 X Routine Maintenance Works

0.36 0.32

0.25 0.01

0.26 0.27

TOTAL 100.00 100.00 32.67

4.84 37.50

56.69 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 0.22 0.87 1.69 5.62 11.11 18.06 24.50 31.58 38.99 46.36 52.53 60.68 67.46

31.90 35.31

40.53 47.72

56.69 65.59

75.18 84.21

94.42 100.00

0.10 0.58 0.79 1.59 2.93 3.71 4.79 5.98 8.60 11.28 12.62 16.08 18.71 21.04 25.88 32.67 37.50 0.12 0.29 0.90 4.03 8.18 14.35 19.71 25.60 30.39 35.08 39.91 44.60 48.75 14.27 14.65 15.06 19.18 0.48 0.21 0.80 1.34 0.78 1.08 1.19 2.62 2.68 1.34 3.46 2.63 2.33 - Condacted Meeting with contractor decision maker to find out the main problem - Stone crusher out of order in the last half month - Inadequate Contractor cashflow - Shortage of lab technician Actual Progress Balance Div Description The month of time for complation Rivised Progress Schedul Add.1 Original Progress Schedul DISBURSEMENT 22,254,343,915.00 31-Dec-14 PHYSICAL PROGRESS MONITORING TABLE 2014 2015 Year Month 9-Oct-15 PHYSICAL WORK PROGRESS BY CATEGORY 134,909,211,000.00 154,073,015,000.00 RENARDET S.A JV SUPARJONO, ST,MT A MO U N T 8-Jan-14 25-Nov-13 EXECUTIVE SUMMARY REPORT May- 15 PROJECT DATA SUMMARY OF WORK PROGRESS PROGRESS STATUS 01 T IME May 25, 2015 BIHA - KRUI MAJOR PROBLEMS ACTION TO BE TAKEN 10 20 30 40 50 60 70 80 90 100 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 PH Y S IC A L PR O G R E S THE MONTH OF TIME FOR COMPLATION PROGRESS SCHEDULE PACKAGE 01 Original Sch Revised Sch Actual EXECUTIVE SUMMARY REPORT MEI 2015_BF2474 ExSum P-1 MONTH : Package No. Time Elapsed Days 504 Name Time Elapsed 69.04 Project Manager Scheduled Progress 73.65 - Contractor has insufficient manpower, Equipment - The contractor have to add manpower, equipment Contractor PT JAYA KONSTRUKSI MP, Tbk Actual Overall Progress 58.61 financial resource to excecute the available works aspecialy for drainage work Supervision Consultant Balance -15.04 - Delayed widening of exist pavement - DSC and Contractor has discussed with PPK regar- Contract Sign Progress This Month 2.90 - Delayed of works Air Gadang Bridge ding to Start of work Air Gadang Bridge Commencement Date method of construction of precast retaining wall. Time for Complation Days 730 - Delayed of Work Asphalt Pavement - PPK should coordinate with respective agency Take Over Date Status date - Delayed relocation of existing electrical pool - PPK should give notification to the utility company Contract Amount Rp. Accumulative Rp.

26.00 - Delayed relocation of existing PDAM pool