1.540 6.900 5.340 - 7.670 14.890 17.110 0.120 43.28 WINRIP DOC MPR CTC MPR No.29 2015 05 20150531 00269

MONTH : Package No. Time Elapsed Days 504 Name Time Elapsed 69.04 Project Manager Scheduled Progress 79.97 Contractor PT JAYA KONSTRUKSI MP, Tbk Actual Overall Progress 43.28 - Shotage of dumptruck Supervision Consultant Balance -36.69 Contract Sign Progress This Month 3.56 Commencement Date Time for Complation Days 730 Take Over Date Status date Contract Amount Rp. Accumulative Rp. 23.31 Contract Amount Add-1 + PPN Include advance payment Comp Accum Actual Accum Accum Total Last this to this Sch to this Month Month Month Month I G e n e r a l

10.21 1.540

0.01 1.550

6.49 II D r a i n a g e

13.17 6.900

0.73 7.630

13.01 III Earthworks

3.04 5.340

0.39 5.730

3.04 IV Pavement Widening Shoulders

2.45 -

V Granular Pavement

11.27 7.670

0.16 7.830

10.38 VI Asphalt Pavement

55.81 14.890

2.22 17.110

45.30 VII S t r u c t u r e s

0.80 2.640

0.05 2.690

0.80 VIII Reinstatement Minor Works

2.27 0.120

- 0.120 0.14 IX Day Work

0.22 0.050

- 0.050 0.16 X Routine Maintenance Works

0.76 0.570

- 0.570

0.65 TOTAL

100.00 39.72

3.56 43.28

79.97 Note : Year Month Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec The month of time for complation 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Schedl Progress Original 0.26 1.00 1.67 2.45 4.78 7.45 10.70 14.27 21.53 30.10 36.95 44.01 51.62 58.67 65.63 73.03 79.97 87.04 91.61 93.19 94.30 95.76 97.82 100.00 Actual Progress 0.24 0.48 2.07 2.43 2.87 5.45 5.70 7.01 12.43 14.45 19.30 24.38 29.11 30.11 32.97 39.72 43.28 Balance 0.02 0.52 0.40 0.02 1.91 2.00 5.00 7.26 9.10 15.65 17.65 19.63 22.51 28.56 32.66 33.31 36.69 0.24 1.59 0.36 0.44 2.58 0.25 1.31 5.42 2.02 4.85 5.08 4.73 1.00 not finilzed yet - Progress achieved less than the target Minimum target per month 8 to accomplish project on shedule 5-Jan-16 - Shortage of labor for drainage work Need additional team work 06-Dec-13 PHYSICAL PROGRESS MONITORING TABLE 143,688,963,000.00 PHYSICAL WORK PROGRESS BY CATEGORY Div Description RENARDET S.A JV - Insuffisient supply agregate for base course Improve equipment management DISBURSEMENT 6-Jan-14 asphalt concrete stone crusher broken Need additional dumptruck EXECUTIVE SUMMARY REPORT May- 15 PROJECT DATA SUMMARY OF WORK PROGRESS PROGRESS STATUS 2014 2015 31-Dec-14 33,493,661,044.00 03 T IM E May 25, 2015 MANGGOPOH - PADANG SAWAH MAJOR PROBLEMS ACTION TO BE TAKEN - Field Eng Technical justification of variant order Speedup the process A M O U N T - AMP often broken Need improvement of equipment management 10 20 30 40 50 60 70 80 90 100 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 P H Y S IC A L P R O G R E S THE MONTH OF TIME FOR COMPLATION PROGRESS SCHEDULE PACKAGE 03 Schedule Actual EXECUTIVE SUMMARY REPORT MEI 2015_BF2474 ExSum P-3 MONTH : Package No. Time Elapsed Days 500 Name Time Elapsed 68.49 Project Manager Scheduled Progress 75.72 Contractor PT WASKITA KARYA - PT DAYA JO Actual Overall Progress 39.36 Supervision Consultant Balance -36.35 Contract Sign Progress This Month 3.93 Commencement Date Time for Complation Days 730 Take Over Date Status date Contract Amount Rp. Accumulative Rp. 15.67 Contract Amount Add-1 + PPN Include advance payment Comp Accum Actual Accum Accum Total Last this to this Sch to this Month Month Month Month I G e n e r a l

7.59 0.63