MONTH :
Package No. Time Elapsed Days
504 Name
Time Elapsed 69.04
Project Manager Scheduled Progress
73.65
- Contractor has insufficient manpower, Equipment - The contractor have to add manpower, equipment
Contractor PT JAYA KONSTRUKSI MP, Tbk
Actual Overall Progress 58.61
financial resource to excecute the available works aspecialy for drainage work
Supervision Consultant Balance
-15.04
- Delayed widening of exist pavement - DSC and Contractor has discussed with PPK regar-
Contract Sign Progress This Month
2.90
- Delayed of works Air Gadang Bridge ding to Start of work Air Gadang Bridge
Commencement Date
method of construction of precast retaining wall.
Time for Complation Days 730
- Delayed of Work Asphalt Pavement - PPK should coordinate with respective agency
Take Over Date Status date
- Delayed relocation of existing electrical pool - PPK should give notification to the utility company
Contract Amount Rp.
Accumulative Rp.
26.00 - Delayed relocation of existing PDAM pool
- DSC and Contractor to discuss with PPK
Contract Amount Add-1 + PPN Include advance payment
regarding the finalization of the Field Engineering.
Comp Accum
Actual Accum
Accum Total
Last this
to this Sch to this
Month Month
Month Month
I G e n e r a l
10.46 5.41
1.39 6.80
8.05
II D r a i n a g e
3.53 3.78
0.31 3.48
3.53
III Earthworks
4.44 4.43
0.29 4.73
4.44
IV Pavement Widening
Shoulders
2.26 -
- -
- V
Granular Pavement 10.49
12.70 0.01
12.71 10.01
VI Asphalt Pavement
52.09 21.75
0.97 22.72
32.53
VII S t r u c t u r e s
14.35 6.28
0.50 6.78
14.34
VIII Reinstatement Minor
Works
1.65 0.96
- 0.96
0.19
IX Day Work
0.12 0.00
- 0.00
0.08
X Routine Maintenance
Works
0.62 0.40
0.03 0.43
0.48 TOTAL
100.00 55.71
2.90 58.61
73.65
Year Month
Jan Feb
Mar Apr
May Jun
Jul Aug
Sep Oct
Nov Dec
Jan Feb
Mar Apr
May Jun
Jul Aug
Sep Oct
Nov Dec
2 3
4 5
6 7
8 9
10 11
12 13
14 15
16 17
18 19
20 21
22 23
24 Original Progress Schedul
0.45 0.90
2.20 3.45
7.17 13.58
17.48 20.63
27.88 33.56
38.81 44.72
50.52 56.13
62.58 67.95
73.65 79.35
82.91 85.94
90.59 93.85
97.89 100.00
Actual Progress -
0.13 1.02
2.19 4.11
5.96 9.69
13.85 22.55
25.61 31.45
33.73 40.41
44.25 49.98
55.715 58.61
Balance 0.45
0.77 1.17
1.26 3.07
7.62 7.80
6.78 5.33
7.95 7.36
10.99 10.11
11.88 12.59
12.23 15.04
0.89 1.17
1.91 1.86
3.72 4.17
8.69 3.07
5.84 2.28
6.68 3.84
38.29 May 25, 2015
PADANG SAWAH-SIMPANG EMPAT
MAJOR PROBLEMS ACTION TO BE TAKEN
02
T IM
E
A M
O U
N T
RENARDET S.A JV 06-Dec-13
6-Jan-14
EXECUTIVE SUMMARY REPORT
May-15
PROJECT DATA SUMMARY OF WORK PROGRESS
PROGRESS STATUS
The month of time for complation DISBURSEMENT
31-Dec-14 51,471,114,630
5-Jan-16
PHYSICAL WORK PROGRESS BY CATEGORY Div
Description
PHYSICAL PROGRESS MONITORING TABLE 2014
2015
197,936,699,000.00
10 20
30 40
50 60
70 80
90 100
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
P H
Y S
IC A
L P
R O
G R
E S
THE MONTH OF TIME FOR COMPLATION
PROGRESS SCHEDULE PACKAGE 02
Schedule Actual
EXECUTIVE SUMMARY REPORT MEI 2015_BF2474 ExSum P-2
MONTH :
Package No. Time Elapsed Days
504 Name
Time Elapsed 69.04
Project Manager Scheduled Progress
79.97 Contractor
PT JAYA KONSTRUKSI MP, Tbk Actual Overall Progress
43.28 - Shotage of dumptruck
Supervision Consultant Balance
-36.69 Contract Sign
Progress This Month 3.56
Commencement Date Time for Complation Days
730 Take Over Date
Status date
Contract Amount Rp.
Accumulative Rp. 23.31
Contract Amount Add-1 + PPN Include advance payment
Comp Accum
Actual Accum
Accum Total
Last this
to this Sch to this
Month Month
Month Month
I G e n e r a l
10.21 1.540