Management Information System WINRIP DOC MPR CTC MPR No.29 2015 05 20150531 00269

Western I ndonesia National Roads I mprovement Project 6 - 17

6.6 Management Information System

We already implemented of training and socialization of the DMS application and the WINRIP website on May 12, 2015. This event was attended by 16 participants from the PMU, Satker SNVT PAPP PHLN of DGH and CTC. The CTC needs to give a preparatory training on how to use this application in order all of the supporting staff can take advantage of it properly. And the training has some revision input from participants for DMS applications improvement. And we have to make changes based on that input. Furthermore, the participants also agreed and committed to upload files of letters and documents when there is a new data. Then the number of files that have been uploaded to increase rapidly. The data that has been uploaded to the DMS database until the end of May are: 207 records of letter and 204 records of document.

6.6.1 DMS Training and Socialization 1 Background

The CTC has finished developing the DMS applications and the WINRIP websites. The DMS is an online-based information system that is used to store and manage all the soft-files of letters and documents that are related to the project and the website to display the general information about WINRIP. 2 Objective Provide a preparatory training on how to use the DMS application. And each user can do the upload, edit and delete files of letters and documents. 3 Event DayDate : Tuesday, May 12, 2015 Time : 09.00 - Finish Venue : DGH Meeting Room, 6th Floor 4 Training Schedule TIME ACTIVITIES SPEAKERS 08.30 09.00 Registration Committee 09.00 10.00 Introduction of The WINRIP Information Systems Sony Thamrin 10.00 12.00 Training of The DMS Application Asep Sopyan 12.00 13.00 I S H O M A Committee 13.00 15.00 Training of The WINRIP Website Sony Thamrin 15.00 15.30 Closing Committee Western I ndonesia National Roads I mprovement Project 6 - 18 5 Participants 1. PMU • Dwisman Wijaya Staff 2. SNVT PAPP PHLN • Madefis Ide Staff • Lisnayati Staff • Miftachul Salam Supporting Staff • Yosef Christmanto Supporting Staff 3. CTC A. Assistant 1. Astrini Primanita Assistant Community Development 2. Dhea Devira Assistant Procurement 3. Luth Sadar Assistant Road Safety Audit 4. Sheila Tuwankotta Assistant Environment dan Social Impact 5. Siti Rosmiyati Assistant Training B. Supporting Staff 1. Melinda Defrita Billingual Secretary I 2. Renny Soeharto Billingual Secretary II 3. Asih Rosnaningsih Secretary II 4. Tedi Okta Pratama Data Manager 5. Banu Amanda Zuhri Computer Operator 6. Toto Suwasono Computer Operator 6 Comment and Revision NO. COMMENT COMMENTATOR STATUS 1 Addition of new Document Type: • HIV AIDS report • Provisional Hand Over PHO • Audit • Invoice INV Sheila Renny Renny Toto Done Done Done Done 2 Reduction of Document Type: • Design Review Renny Done 3 Revision of Document Type: • Road Safety Audit  Road Safety • WPM  CRO Luth Astri Cancel Done 4 Changing of Document Category: • Road Safety Audit  Road Safety Luth Cancel 5 Component addition: PMUAudit Renny Done 6 Letter labelling: deleted of INOUT label on file name Renny Done Western I ndonesia National Roads I mprovement Project 6 - 19 NO. COMMENT COMMENTATOR STATUS 7 Addition of document search feature: • Search by Package Dhea Done 8 Making of Status and Topik Surat features  need to follow-up disscusion Renny On going 9 On the Add Letter Document form fill  the first list row must be empty null  for a verification errors. Banu Done 10 On the Add Document form fill  The Component is the same way with Add Letter form fill Tediero Done 11 The procurement document can or can not be accessed by the public  must confirm to pak Julius Dhea Not yet 12 List of Letter  Addition of the Status column Banu Done 13 List of Letter Document  Addition of the Uploaded by column Tediero Done 14 Addition of numbering label on title of MPR-CTC report Renny Done 15 On the Add Document form fill  deleted of the Package form fill Renny Done 7 Follow-up We have completed most of the comment and revision from the participants. Then we are currently focus on making of Status and Topics of Letter features. Following up on this, we have further discussion with Renny and Devy on May 26, 2015 at the DGH to discuss in detail about it. And we agreed to make an additional feature in the Letter module. But we need extra time to work on it.

6.6.2 DMS Statistic

Today the DMS application already stored many file of Letters and Documents. And the next days will be more files are stored in the DMS database. At the end, it is expected to store all of files that related with WINRIP project. Below is the number of Letter files that have been stored in DMS database, updates until the end of May 2015. This Letter statistics have sorted by Package. WINRIP Website and Application Progress are shown in Appendix G. M o n th ly P ro g re ss R e p o rt M a y 2 1 5 W e st e rn I n d o n e sia N a tio n a l R o a d s Im p ro v e m e n t P ro je c t 6 - 2 1 2 3 4 5 6 7 P1 Krui - Biha P2 Padang Sawah - Sp Empat P3 Manggopoh - Padang Sawah P4 Ipuh - Bantal P5 Sp Rampa - Poriaha P6 Pasar Pedati - Kerkap P7 Indrapura - Tapan P8 Bts Kota Pariaman - Manggopoh P9 Rantau Tijang - Kota Agung P10 Sp Empat - Sp Air Balam P11 Bantal - Mukomuko P12 Kambang - Indrapura P13 Sp Rukis - Tj Kemuning P14 Painan - Kambang P15 Sibolga - Batas Tapsel P16 Seblat - Ipuh P17 Sp Gn Kemala - Pg Tampak P18 Mukomuko - Bts Sumbar P19 Lais - Bintunan P20 Lubuk Alung - Sicincin P21 Lubuk Alung - Kuraitaji WINRIP 3 6 2 8 6 1 2 5 1 5 1 7 1 1 7 6 1 6 1 2 1 2 6 8 5 4 1 4 2 2 6 6 P a ck a g e Let ter S ta tis tic So rt e d b y P ac kag e A n d h e re ar e th e n u m b e r o f D o cu m e n t fi le s th at h av e b e e n st o re d in D M S d at ab a se , u p d at e s u n til th e e n d o f M ay 2 1 5 . T h is D o cu m e n t st at is tic s h a ve s o rt e d b y D o cu m e n t T yp e . 1 2 3 4 5 6 6 3 4 5 2 3 1 2 1 2 6 7 1 5 8 2 3 5 Do cu m e n t T yp e D o cu men t S ta tis tic So rt e d b y Do cu m e n t Ty p e Western I ndonesia National Roads I mprovement Project 6 - 21

6.7 Quality Assurance