28-Feb-02
Contract Package
Original Add
Actual To Original To Add
days days
days
Constr. Escalation
T O T A L DIV0
- DIV0
DIV0 DIV0
DIV0 DIV0
109,670.00 Total
Contractors
Time Elapsed This Month
Eq.Rp.Million
Original
31 March 2013
To date
Addendum
Eq.Rp.Million Eq.Rp.Million
Eq.Rp.Million
To date
Appendix - A1
IBRD LOAN No. 8043-ID
Scheduled
TIME Contract Sum Incl. Tax
in Rp Million
Last Month
SUMMARY OF OVERALL PHYSICAL PROGRESS OF CIVIL WORK AWP-1 WESTERN INDONESIA NATIONAL ROADS IMPROVEMENT PROJECT WINRIP
Const.Period Accumulate Progress of Civil Works
31 March 2013
NO LINK NAME
PACKAGE CODE
EFFECTIVE LENGTH
KM CONTRACTOR
ORIGINAL CONTRACT PRICE incl. TAX
CONTRACT PRICE AFTER ADDENDUM Incl. TAX, Excl.
Prc.Escalation
CONTRACT SIGNED DATE
START DATE
ORIGINAL CONTRACT
DURATION DAYS
CONTRACT DURATION AFTER ADDENDUM
DAYS
PLANNED PROGRESS
ACTUAL PROGRESS
CERTIFICATE OF COMPLETION
ISSUED COMMENTS
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15
Total for AWP-1 -
- DIV0
DIV0
Appendix - A2
CIVIL WORKS PROGRESS STATUS OF AWP-1
WESTERN INDONESIA NATIONAL ROADS IMPROVEMENT PROJECT WINRIP IBRD LOAN No. 8043-ID
Western I ndonesia National Roads I mprovement Project
Appendix B Highway Design Progress
Appendix B. Technical Design Reviewing Progress
Amendment 9.7
6 132,355
Date
01-Feb-13
Amendment
Date
Amendment
Date
Amendment
Date
Amendment
Date
Amendment
Date
Amendment 50.1
6 224,658
Date
18-Mar-13
Amendment
Date
Amendment 56.3
7 287,549
Date
18-Mar-13
Amendment
Date
Amendment 36
7 321,778
Date
28-Mar-13
Amendment
Date
Amendment
Date
Amendment
Date
Amendment
Date
Amendment
Date
Amendment
Date
AWP-2
12 Kambang – Indrapura
Link No.017.2
AWP-3
19 Lais - Bintuan
Link No.009.1
21 Lubuk Alung – Sicincin
Link No.009.1 20
Lubuk Alung – Sicincin Link No.009.1
Original 16.8
7 65,778
Process
17 Sp.Gng Kemala–Pg.Tampak
Link No.061.1 18
Mukomuko – Bts.Sumbar Link No.015.3
Original 25.8
6 69,223
Process
Original 36.8
6 104,238
Process
Original 11.6
7 37,558
Process
Original 14.6
16 Seblat – Ipuh
Link No.010.0
20 Technical
Review by CTC
15 Sibolga – Bts TapSel
Link No.016.1 Original
36 7
129,228
Process
Original 34.5
6 110,237
Process
14 Painan – Kambang
Link No.017.1
10 Technical
Review by CTC
13 SP.Rukis - TJ.Kemuning
Link No.006.0 Original
31.5 7
118,993
Process
11 Bantal - Mukomuko
Link No.015.2 10
Sp.Empat – Sp. Air Balam Link No.034.1
Original 50.1
6 157,820
Process
10 Technical
Review by CTC
Original 61.7
7 241,617
Process
9 Rantau Tijang – Kota Agung
Link No.026.1 8
Bts.Pariaman – Manggopoh Link No.024.0
Original 46.8
7 183,268
Process
Original 42
7 149,831
Process
7 Indrapura – Tapan
Link No.019.0 6
PS.Pedati - Kerkap Link No.010.0
Original 19.5
7 96,921
Process
72,018.80 40
Technical Review
by CTC
Process
Pkg No.
Received Datum
Post- Review
Site Visting
Full- Review
Estimated Cost
Excl.VAT mil. RP
Approval By
BINTEC Total
Process Submitted to
PMU Quality
Assurance Presentation
Discussion
5 Sp.Rampa – Poriaha
Link No.015.xx
6 55,126.60
Process
Original 11.1
Original 25
7
Group Name of Sub-project
ECL Technical Design Review Process for Design Stage
Remark Status
Technical Report or Techinical Advisory
Length km
Width m
7 54,557
Process
Original 55.2
7 171,948
Process
Original 56.3
7 225,481.5
Process
Western I ndonesia National Roads I mprovement Project
Appendix C Financial Progress
Appendix C : Financial Progress
The table below shows total expenditure to date measured in the terms of World Bank Commitment, not including the special account advance.
Date Percentage
Completion of time
WB Expenditure
Commitment Percentage of
Available Expenditure
Source
31032012 1.45
- -
- 30042012
2.90 -
- -
31052012 4.35
- -
- 30062012
5.80 -
- -
31072012 7.25
- -
- 30082012
8.70 -
- -
30092012 10.15
- -
- 31102012
11.60 -
- -
30112012 13.05
- -
- 31122012
14.50 800,000
0.32 Actual
31012013 15.95
800,000 0.32
Actual 28022013
17.40 800,000
0.32 Actual
31032013 18.85
2,207,915 0.88
Actual 30042013
20.30 31052013
21.75 30062013
23.20 31072013
24.65 31082013
26.10 30092013
27.55 31102013
29.00 30112013
30.45 31122013
31.90 31012014
33.35 28022014
34.80 31032014
36.25 30042014
37.70 31052013
39.15 30062014
40.60 31072014
42.05 31082014
43.50 30092014
44.95 31102012
46.40 30112014
47.85 31122014
49.30 31012015
50.75
Date Percentage
Completion of time
WB Expenditure
Commitment Percentage of
Available Expenditure
Source
28022015 52.20
31032015 53.65
30042015 55.10
31052015 56.55
30062015 58.00
31072015 59.45
31082015 60.90
30092015 62.35
31102015 63.80
30112015 65.25
31122015 66.70
31012016 68.15
28022016 69.60
31032016 71.05
30042016 72.50
31052016 73.95
30062016 75.40
31072016 76.85
31082016 78.30
30092016 79.75
31102016 81.20
30112016 82.65
31122016 84.10
31012017 85.55
28022017 87.00
31032017 88.45
30042017 89.90
31052017 91.35
30062017 92.80
31072017 94.25
31082017 95.70
30092017 97.15
31102017 98.60
30112017 99.05
31122017 100.00
Western I ndonesia National Roads I mprovement Project
Appendix D Environmental Progress and Social Progress
Length Width Km
m Result
Comments Budget
Alocated,Year Status
BLH Approval Result
Comments Budget Alocated,Year
Status THE WB Approval
1 Krui - Bha Lampung
25 7
ICBPrior SPPL
Air pollution, traffic congestion, steep
sopes,slopes,sopt soil and rivers and beach, abrasion
APBN P2JN 2010
100 YES, 2010
LARAP Total PAP 2.805 in 21 Pekon. Land affected 28.763,12
M
2
; Aset affected : building 882,13 M
2
; Fence 2.445,41 M ; Plant 653 rod ; paddy field 25 plots ; Social Pablic
Facilities Rp. 5.172.349.955
APBN, Satker PJN II Lampung, 2011 - 2012
LARAP Monitoirng Report under review CTC A. NOL LARAP 04 Jan
2013 ; B. ENV : CTC in preparing detil environmental mitigation
on construction stage discussion process with Subdit TLKJ. SOS :
2 Padang Sawah - Sp Empat Sumatera Barat
40.9 7
Total PAP 15. Land affected 2,110 M
2
; Aset affected: building 6 unit = 410 M
2
; Plant 72 rod. 2a
Including Air Gadang Bridge Sumatera Barat
100 m 7
Total PAP 430 . No Land affected . Aset affected: building 149 unit = 2.110 M
2
; Fence 2 unit = 341.8 M ; Kiosks BBM: 25 unit; Plant: 873 rod ; Mosque: 2 unit
3 Manggopoh - Padang Sawah Sumatera Barat
32 7
ICBPrior SPPL
Air pollution, traffic congestion, market on
street, sopt soil and rivers APBN
P2JN 2010 100
YES, 2010 LARAP
Total PAP 1.338 . No Land affected . Aset affected : building 115 unit = 668,33 M
2
; Culvert 661,05 m ; concrete foundations 1.421,60 M
3
; Soil embankment 5.564,21 M
3
; Plant 5.324 rod ; paddy field and lemongrass turmeric = 17.695 clumps ; Mesjid
Market Rp. 1.147.700.000
APBD Prov Sumbar, Dinas PU, 20122013
LARAP Monitoirng Report under review CTC A. NOL LARAP 04 Jan
2013 ; ENV : Propose to site visit for finding environmental
issues on field. SOS :
4 Ipuh- Bantal Bengkulu
42.4 7
ICBPrior SPPL
Geometric, traffic congestion, steep
sopes,slopes,sopt soil and rivers and beach, abrasion
APBN P2JN 2010
100 YES, 2011
LARAP Total PAP 178. Land affected 2.730 M
2
; Aset affected : building 141 unit = 1.014 M
2
; Fence 52 unit = 531 M ; cemetery 2 unit ; Plant 32 rod.
Rp.286.743.000. APBN, Satker PJN I, Bengkulu,
2013 On going measurement by BPN Land Agency
A. NOL LARAP 10 Dec 2012 ; B.-
ENV : CTC in preparing detil environmental mitigation on construction stage discussion process with Subdit
TLKJ. SOS : 5 Sp. Rampa - Poriaha
Sumatera Utara 11.1
6 NCBPost
UKLUPL slope stability, water quality, Run off, bridges
acces, continued traffic access quarry problem
APBN BBPJN I 2011
100 YES, 2011
Simple LARAP -
APBN, Satker PJN II, Sumut, 2014
Bidding for Consultant LARAP A. -
B.-
ENV : r opose to site visit for finding environmental issues on field. SOS :
6 Ps Pedati - Kerkap Bengkulu
25 7
NCBPost UKLUPL Comersil areas, traffic
congestion, market on the street, air pollution
noise, APBN
TLKJ 2011 100
YES, 2011 LARAP
- APBN Satker PJN I,
Bengkulu, 2014 Revise of LARAP Document by Colsultant
A. - B.-
ENV : Environmental issues will integrated to design,
Prepare environmental mitigation on construction stage for contractor RKPPL.Propose to site visit for
finding environmental issues on field. SOCIAL:
7 Indrapura - Tapan 1 Doc Amdal Sumatera Barat
19.5 7
ICBPrior AMDAL
Sensitive forest areas, social issues, slope
stability, water quality, waste management, air
pollution, squater on ROW etc
APBN TLKJ 2012
70 Not Yet
Simple LARAP -
APBD Prov Sumbar, Dinas PU,
Not Yet A. -
B.- Environmental issues will integrated to design, Prepare
environmental mitigation on construction stage for contractor RKPPL.Propose to site visit for finding
environmental issues on field. 8 Bts. Kota Pariaman - Manggopoh
Sumatera Barat 46.8
7 ICBPrior
AMDAL Comersil areas, market,
public facilities, Air pollution, traffic
congestion, market on street, sopt soil and rivers
APBN BBPJN II 2011
100 YES, 2013
LARAP -
APBD Prov Sumbar, Dinas PU,
Bidding for Consultant LARAP A. -
B.- Environmental issues will integrated to design, Prepare
environmental mitigation on construction stage for contractor RKPPL.
9 Rantau Tijang - Kota Agung Replace
Lampung 42
7 ICBPrior
UKLUPL Sensitive areas, resident, air pollution, traffic
congestion, steep sopes,slopes,sopt soil and
rivers and beach, abrasion APBN
TLKJ 2011 100
YES, 2012 LARAP
- -
- A. -
B.- Environmental issues will integrated to design, Prepare
environmental mitigation on construction stage for contractor RKPPL. Propose to site visit for finding
environmental issues on field. 10 Sp Empat - Sp Air Balam
Sumatera Barat 61.7
7 ICBPrior
AMDAL Sensitive forest areas,
social issues, slope stability, water quality,
waste managemnt, bridge traffic access quarry
problem APBN
BBPJN II 2011 100
YES, 2013 LARAP
- APBD Prov Sumbar,
Dinas PU, Bidding for Consultant LARAP
A. - B.-
Environmental issues will integrated to design, Prepare environmental mitigation on construction stage for
contractor RKPPL. 11 Bantal - Mukomuko 1 Paket
doc AMDAL Bengkulu
50.1 6
ICBPrior AMDAL
Sensitive areas, social issues, market on the
street, geometric, waste managemnt, continued
traffic access, etc APBN
TLKJ 2011 60
Not Yet LARAP
- APBN Satker PJN I,
Bengkulu, 2014 Revise of LARAP Document by Colsultant
A. - B.-
ENV : Propose to site visit for finding environmental issues on field. SOCIAL:
12 Kambang - Indrapura 1 Doc Amdal Sumatera Barat
55.2 6
ICBPrior AMDAL
Resident, productive land, Catcment areas,rivers,
slope stability, squater on the street, land acquisition.
APBN TLKJ 2011
70 Not Yet
LARAP -
APBD Prov Sumbar, Dinas PU,
LARAP Preparation A. -
B.- Input RKLRPL integration to design doc.
Appendix D : Progress ofENVIRONMENTAL STATUS PROGRESS FOR WINRIP, IBRD LOAN NO.8043-ID as per March, 2013
one link,sensitive areasresident,
public,facilities, squater, market,sopt soil and rivers
ENV : Propose to site visit for finding environmental issues on field. SOCIAL:
AWP - 2
Remedial Action
AWP - 1
No Loan Package Name
Provinces P
r o
c Approval Status by Environmental Agency BLH
Environmental Screening Social Screening
Approval Status by The World Bank
YES, 2010 ICBPrior
SPPL UKLUPL
Bridge LARAP
Rp.2.340.600.000 APBD Prov Sumbar, Dinas PU,
2012 APBN
P2JN 2010 100
LARAP Monitoirng Report under review CTC A. NOL LARAP 13 Jan
2013 ; B.
Length Width Km
m Result
Comments Budget
Alocated,Year Status
BLH Approval Result
Comments Budget Alocated,Year
Status THE WB Approval
Remedial Action No
Loan Package Name Provinces
P r
o c
Approval Status by Environmental Agency BLH Environmental Screening
Social Screening Approval Status by The World Bank
13 Sp Rukis - Tj Kemuning Bengkulu
56.3 7
ICBPrior UKLUPL one link,sensitivesteep
sopes,slopes,sopt soil and rivers, squater on
the street, resident, productive land.
APBN P2JN 2011
100 YES, 2011
LARAP -
APBN, Satker PJN I Bengkulu, 2014
Revise of LARAP Document by Colsultant A. -
B.-
ENV : Environmental issues will integrated to design,
Prepare environmental mitigation on construction stage for contractor RKPPL. Propose to site visit for
finding environmental issues on field. SOCIAL:
14 Painan -Kambang 1 doc Amdal Sumatera Barat
31.5 7
ICBPrior AMDAL
Sensitive forest areas, social issues, slope
stability, water quality, waste managemnt,
continued traffic access quarry problem
APBN TLKJ 2011
70 Not Yet
Simple LARAP -
APBD Prov Sumbar, Dinas PU,
Check to field is needed for LARAP requirment A. -
B.- Environmental issues will integrated to design, Prepare
environmental mitigation on construction stage for contractor RKPPL.Propose to site visit for finding
environmental issues on field. 15 Sibolga - Bts Tap Sel
Sumatera Utara 36
7 ICBPrior
UKLUPL resident, comersil areas, geometric etc.
APBN BBPJN I 2011
100 YES, 2011
LARAP -
APBN, Satker PJN II, Sumut, 2014
Bidding for Consultant LARAP A. -
B.- Environmental issues will integrated to design, Prepare
environmental mitigation on construction stage for contractor RKPPL.Propose to site visit for finding
environmental issues on field. Seblat - Ipuh including 1 Amdal
34.5 6
Air Lalang Air Guntung Bridge 64 m
6
Sp.Gunung Kemala - Pg. Tampak 36.8
6 Way Tauu Bridge
30 m 6
18 Mukomuko - Bts. Sumbar Replace
Bengkulu 25.8
6 NCBPost
UKLUPL one link,sensitivesteep sopes,slopes,sopt soil and
rivers APBN
TLKJ 2011 100
YES, 2011 LARAP
- -
- Site visit to finding environmental issues on field,
propose schedule the first of July 2013 19 Lais- Bintunan
Bengkulu 11.6
7 NCBPost
UKLUPL one link,sensitiveair pollution, traffic
congestion, squater on the street, etc
APBN TLKJ 2011
100 YES,2011
LARAP -
APBN, Satker PJN II Lampung, 2014
Check to field is needed for LARAP requirment A. -
B.-
ENV: Environmental issues will integrated to design,
Prepare environmental mitigation on construction stage for contractor RKPPL.Propose to site visit for
finding environmental issues on field. SOCIAL:
20 Lubuk Alung - Sicincin Sumatera Barat
14.6 7
NCBPost UKLUPL sensitive areasresident,
land acquisition, steep sopes,slopes,sopt soil and
rivers APBN
TLKJ 2011 100
YES, 2011 Simple LARAP
- APBD Prov Sumbar,
Dinas PU, Check to field is needed for LARAP requirment
A. - B.-
Environmental issues will integrated to design, Prepare environmental mitigation on construction stage for
contractor RKPPL. 21 Lubuk Alung -Kurataji
Sumatera Barat 16.8
7 NCBPost
UKLUPL one link,sensitivesteep sopes,slopes,sopt soil and
rivers APBN
TLKJ 2011 100
YES, 2011 Simple LARAP
- APBD Prov Sumbar,
Dinas PU, Check to field is needed for LARAP requirment
A. - B.-
Environmental issues will integrated to design, Prepare environmental mitigation on construction stage for
contractor RKPPL.
ENV : Environmental issues will integrated to design,
Prepare environmental mitigation on construction stage for contractor RKPPL.Propose to site visit for
finding environmental issues on field. SOCIAL:
Not Yet
AMDAL 70
AMDAL sensitive areassteep
sopes,slopes,sopt soil and rivers and beach, abrasion
AWP - 3
Environmental issues will integrated to design, Prepare environmental mitigation on construction stage for
contractor RKPPL.Propose to site visit for finding environmental issues on field.
sensitive areasresident, land acquisition, steep
sopes,slopes,sopt soil and rivers and beach, abrasion
APBN TLKJ 2011
LARAP APBN, Satker PJN II
Lampung, 2014 LARAP Preparation
A. - B.-
17 Lampung
ICBPrior YES, 2012
APBN TLKJ 2011
100 16
Bengkulu ICBPrior
Simple LARAP -
APBN Satker PJN I, Bengkulu, 2014
LARAP Preparation A. -
B.-
Western I ndonesia National Roads I mprovement Project
Appendix E Procurement Plan Progress
Procurement Plan of Implementation Support and Road Sector Institutional Development
Western Indonesia National Roads Improvement Project Name of Executing Agency: Directorate General of Highways , Ministry of Public Works.
Edit 28 March 2013
Ref. No.
Contract Description
Project Cost US
Procurement Method
Review by Bank
PriorPost Schedule
WB provide agreement
to REOI EOI
advertised in newspaper
Submission RFP to WB
WB NOL to RFP
Date of Receipt of
Proposals
Opening of Financial
Proposal Final
Evaluation Report
Contract Sign
Service Start date
Period Month
Completi on Date
Remarks Allocated
Contract Actual
Submission WB NOL
Submission WB NOL
Submission Submission WB NOL
2 Implementation Support
Schedule
14-Nov-10 05-Dec-10
23-Jan-11 12-Feb-11
12-Mar-11 02-Apr-11
23-Apr-12 04-Jun-12
22-Jul-12 05-Aug-12
12-Aug-12 15-Sep-12
29-Sep-12 22-Oct-12
12-Nov-12
Actual
26-Nov-10 7-Jun-11
30-Jan-12 7-Mar-12
9-Dec-11 6-Mar-12
30-Apr-12 14-Jun-12
29-Jun-12 27-Aug-12
3-Sep-12 21-Sep-12
12-Oct-12 5-Nov-12
16-Nov-12 40
Feb-16
Schedule
11-Dec-11 08-Jan-12
27-Feb-12 26-Mar-12
07-May-12 28-May-12
08-Oct-12 22-Oct-12
05-Nov-12 12-Nov-12
19-Nov-12 26-Nov-12
01-Apr-13 18-Apr-13
02-May-13
Actual
26-Nov-10 7-Jun-11
422012 10-Aug-12
20-Jan-12 23-May-12
23-Oct-12 20-Dec-12
21-Feb-13 5-Mar-13
13-Mar-13 25-Mar-13
19-Apr-13 42
3 Road Sector Institutional Development
DGH Capacity Building for DGH Environment
Schedule
01-Jun-13 15-Jun-13
13-Jul-13 27-Jul-13
27-Jul-13 12-Aug-13
16-Sep-13 07-Oct-13
21-Oct-13 04-Nov-13
11-Nov-13 25-Nov-13
09-Dec-13 23-Dec-13
06-Jan-14
Risk Mitigation and Road Safety Unit developing roadmap, norm, standard, procedure,
criteria for disaster risk management in road sector, risk analysis and standad implementation
Actual
Note: TOR of packages for Part 3 of Loan Agreement Road Sector Institutional Development DGH will send for approval to WB on May 2013.
Negotiation Draft Contract
T O T A L a
Core Team Consultant Project Management, Technical Assistant, Enviromental Social
Aspect and Road safety Audit Design and Supervision Consultant Design
AWP-2 3 and Construction Supervision of Civil Works Project
10,000,000
1,000,000 b
QCBS QCBS
Evaluation and Short List
QCBS Prior
5,000,000 Prior
Prior
Technical Evaluation Report
Appendix E : Procurement Plan of Civil Works
Western Indonesia National Roads Improvement Project WINRIP Name of Executing Agency: Directorate General of Highways , Ministry of Public Works.
Update 28 March 2013
9000
Edit 250112
Qualificatio n
Schedule Submission
Notification Sub - Project
Link No. Length
Criteria Actual
of of
Km IDR x10
⁶ USD million IDR x10
⁶ PrePost
Application Qualification
A W P - 1
1 Krui - Biha
Lampung 053.0
25.00 ICB
148,668.00 16.52
Pre Schedule
12-Jan-11 09-Feb-11
09-May-11 07-Aug-11
15-Dec-11 09-Feb-12
13-Sep-12 28-Feb-13
01-Mar-13 07-Mar-13
18-Apr-13 05-May-13 19-May-13 18-Jun-13
720 Actual
25-Jan-11 21-Feb-11
02-Nov-11 28-Dec-11
30-Dec-11 28-Feb-12
25-Jan-13 28-Mar-13
17-May-13 27-May-13
08-Jul-13 2
Padang Sawah - Sp.Empat West Sumatera
047.2 40.90
ICB Schedule
12-Jan-11 09-Feb-11
09-May-11 07-Aug-11
15-Dec-11 09-Feb-12
13-Sep-12 28-Feb-13
01-Mar-13 07-Mar-13
18-Apr-13 05-May-13 19-May-13 18-Jun-13
720 Including Air Gadang Bridge
0.10 Actual
25-Jan-11 21-Feb-11
02-Nov-11 28-Dec-11
30-Dec-11 28-Feb-12
25-Jan-13 28-Mar-13
17-May-13 27-May-13
08-Jul-13 3
Manggopoh - Padang Sawah West Sumatera
047.1 32.00
ICB 152,434.90
16.94 Pre
Schedule 12-Jan-11
09-Feb-11 09-May-11
07-Aug-11 15-Dec-11
09-Feb-12 13-Sep-12
28-Feb-13 01-Mar-13
07-Mar-13 18-Apr-13
05-May-13 19-May-13 18-Jun-13 720
Actual 25-Jan-11
21-Feb-11 02-Nov-11
28-Dec-11 30-Dec-11
28-Feb-12 25-Jan-13
28-Mar-13 17-May-13
27-May-13 08-Jul-13
4 Ipuh - Bantal
Bengkulu 015.1
42.40 ICB
226,275.10 25.14
Pre Schedule
12-Jan-11 09-Feb-11
09-May-11 07-Aug-11
15-Dec-11 09-Feb-12
13-Sep-12 28-Feb-13
01-Mar-13 07-Mar-13
18-Apr-13 05-May-13 19-May-13 18-Jun-13
720 Actual
25-Jan-11 21-Feb-11
02-Nov-11 28-Dec-11
30-Dec-11 28-Feb-12
25-Jan-13 28-Mar-13
17-May-13 27-May-13
08-Jul-13
Sub Total AWP - 1 734,768.30