Management Information Systems Quality Assurance Current Situation Action Required

Western I ndonesia National Roads I mprovement Project 41 • Current Estimated Situation No risk was detected until preparation of this report since the main program of the loan civil works implementation has not yet been started with contract sign.

6.9.3 Risks Related to Quality

The quality of work is inherently tied to the competence of the Contractors and the diligence of the Supervision Teams. The competence or otherwise of contractors shall be considered at the time of bid evaluation and prior to the award of any contract. The quality of supervision however is influenced by the following factors: • Ensuring that supervision staff levels are fully manned with competent, honest, qualified and experienced personnel. • The provision of properly equipped laboratories with properly trained operators for each package. Package supervision comes under the responsibilities of the immediate supervision teams and the relevant DSC but the Quality Assurance Engineer from CTC, when mobilized, will periodically monitor their performance. Western I ndonesia National Roads I mprovement Project 42 7 ISSUES and RECOMMENDATIONS

7.1 Current Situation

The main issue during March 2013 is the procurement of four 4 packages under AWP-1. The AERs have been discussed between the DGH and the Bank for almost a year. The tender could not be started until the AERs are approved by the Bank even the Bidding Documents are ready to be issued. The existing road conditions of the four packages under AWP-1, which are predicted being deteriorated rapidly by the traffic during almost a year, shall be anticipated. Another issue is establishment of the Design and Supervision Consultant DSC. It is required to expedite the DSC recruitment process. The DEDs for AWP-2 and AWP-3 packages, including the 7 packages under CTC review at the current time, shall be completed soonest and the procurement can be started immediately.

7.2 Action Required

The project managers PPKs are suggested and required to update the DEDs of the AWP- 1 packages following actual condition of the existing roads. The estimated construction cost should be considered to not significantly increase. Otherwise, the prequalification shall be cancelled since the experience criteria for the Applicants were set based on previous estimated construction cost. It is hopefully that the Bank will not take long time approving the proposed negotiated and draft contract for DSC which was submitted by DGH on 25 March 2013. Western I ndonesia National Roads I mprovement Project Appendix A Overall Loan Progress Exchange Rate : 1 equal to IDR 9,750 31 March 2013 Estimated Contractors or Total Est. Budget Starting Completion Consultants Man-Month WB + GOI Remarks Date Date Name Excl. the PIP Original Revised Physical Man-Month Physical Man-Month Physical Man-Month Supp. Staff USD, Excl.VAT Excl. VAT Excl. VAT MM MM MM 1 Betterment and Capacity 314,900,000.00 Expansion of National Roads 1.A AWP-1 ICB DGH 81,630,000.00 Procurement process prequalification. 1.B AWP-2 and AWP-3 ICB NCB DGH 227,100,000.00 Detailed Engineering Design preparation. 1.C Contingency - DGH 6,170,000.00 2 Implementation Support 6,000,000.00 2.A Core Team Consultants CTC QCBS DGH 6-Nov-12 15-Feb-16 PT. Perentjana Djaja 556 5,000,000.00 1,276,700.00 12.937 71.93 8.500 47.26 -4.437 -24.67 Ongoing Joint Venture with Rp21,415,400,000.00 Yongma Engineering Co.Ltd. Or US equivalent total : PT. Epadascon Permata 3,473,151.28 2.B Design Superv. Consultants QCBS DGH Recruitment process. 2.C Incremental Operating Cost Varies PMU 1,000,000.00 Including Technical Audits 3 Road Sector Institutional 1,000,000.00 Development 3.A Capacity Building for NCB DGH 350,000.00 Preparation of TOR. Disaster Risks Reduction 3.B Capacity Building for NCB DGH 350,000.00 Preparation of TOR. Environmental Management 3.C Capacity Building for NCB DGH 300,000.00 Preparation of TOR. Road Safety 4 Contingency for Disaster DGH - Risk Response 5 Unallocated DGH 18,100,000.00 Total 340,000,000.00 3,473,151.28 12.937 71.93 8.500 47.26 -4.437 -24.67 Appendix - A OVERALL PROGRESS STATUS Description WESTERN INDONESIA NATIONAL ROADS IMPROVEMENT PROJECT WINRIP IBRD LOAN No. 8043-ID Proc. Method Category Planned Actual Balance PROGRESS Respon- sibility Contract ValueBudget Total WB + GOI CTC 30-Nov-12 31-Dec-12 31-Jan-13 28-Feb-13 31-Mar-13 30-Apr-13 31-May-13 30-Jun-13 31-Jul-13 31-Aug-13 30-Sep-13 31-Oct-13 30-Nov-13 Team Leader 25-Mar-13 0.25 1.25 2.25 3.25 4.25 5.25 6.25 7.25 8.25 Senior Highway 1-Feb-13 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00 Senior Proc Senior Road Sft 1-May-13 1.00 2.00 3.00 4.00 5.00 6.00 7.00 Ass. TL 19-Nov-12 0.33 1.33 2.33 3.33 4.33 5.33 6.33 7.33 8.33 9.33 10.15 11.15 12.15 Highway Eng 19-Nov-12 0.33 1.33 2.33 3.33 4.33 5.33 6.33 7.33 8.33 9.33 10.15 11.15 12.15 Qualty Ass. Eng 1-Jul-13 1.00 2.00 2.82 3.82 4.82 Financial 19-Nov-12 0.33 1.33 2.33 3.33 4.33 5.33 6.33 7.33 8.33 9.33 10.15 11.15 12.15 Enviro 17-Dec-12 0.45 1.45 2.45 3.45 4.45 5.45 6.45 7.45 8.45 9.27 10.27 11.27 Socio 19-Nov-12 0.33 1.33 2.33 3.33 4.33 5.33 6.33 7.33 8.33 9.33 10.15 11.15 12.15 Proc. Speclt-1 Proc. Speclt-2 25-Mar-13 0.25 1.25 2.25 3.25 4.25 5.25 6.25 7.25 8.25 MIS 1-May-13 1.00 2.00 3.00 4.00 5.00 6.00 7.00 Comm.Devlp. 3-Jan-13 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00 11.00 Total Prof 1.32

5.77 11.77

18.77 26.27

35.27 46.26

57.26 69.26

81.26 92.19

104.19 116.19 Ass. Highway Ass. Financial 19-Nov-12 0.33 1.33 2.33 3.33 4.33 5.33 6.33 7.33 8.33 9.33 10.33 11.33 12.33 Ass. EnvSocio 19-Nov-12 0.33 1.33 2.33 3.33 4.33 5.33 6.33 7.33 8.33 9.33 10.33 11.33 12.33 Ass. MIS 3-Jan-13 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00 11.00 Ass. Comm. Dev 1-Feb-13 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00 Ass. Proc-1 3-Jan-13 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00 11.00 Ass. Proc-2 3-Jan-13 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00 11.00 Total Sub Prof 0.66

2.66 7.66

13.66 19.66

25.66 31.66

37.66 43.66

49.66 55.66

61.66 67.66

Grand Total 1.98

8.43 19.43

32.43 45.93

60.93 77.92

94.92 112.92

130.92 147.85 165.85 183.85 Mobilized Total Manmonth Up To 28-Feb-02 Contract Package Original Add Actual To Original To Add days days days Constr. Escalation T O T A L DIV0 - DIV0 DIV0 DIV0 DIV0 DIV0 109,670.00 Total Contractors Time Elapsed This Month Eq.Rp.Million Original 31 March 2013 To date Addendum Eq.Rp.Million Eq.Rp.Million Eq.Rp.Million To date Appendix - A1 IBRD LOAN No. 8043-ID Scheduled TIME Contract Sum Incl. Tax in Rp Million Last Month SUMMARY OF OVERALL PHYSICAL PROGRESS OF CIVIL WORK AWP-1 WESTERN INDONESIA NATIONAL ROADS IMPROVEMENT PROJECT WINRIP Const.Period Accumulate Progress of Civil Works