SCENARIO SYSTEM DESCRIPTION HAZARD IDENTIFICATION PROCESS
1. SCENARIO
1.1 Anycity International Airport AIA has two parallel runways, one main and one secondary, and is planning to install drainage near the approach end of the secondary runway. Construction vehicles must cross the primary runway to gain access to the construction site. Because there are numerous operations during the day, a decision is made to do work at night, during lighter traffic, to avoid disruption of day operations. The AIA safety manager must evaluate the safety consequences of the plan for night construction of the drainage. 1.2 The AIA Safety Action Group SAG has been tasked to support the AIA safety manager in evaluating the safety consequences of the construction plan. One immediate and obvious generic area of concern is the movement of construction vehicles to and from the work site, which could lead to runway incursions. The SAG applies a safety risk management process to evaluate the safety consequences of the construction plan.2. SYSTEM DESCRIPTION
One of the first tasks of the SAG is to describe the modified system under which the airport will conduct operations while construction is being carried out, as follows: a the runway environment during construction at night, including a high volume of construction vehicle traffic between the ramp and the construction site; b the existing driver training programme and the use of escorts for construction vehicles; c the air traffic control tower and the fact that there is no radio communication with construction vehicles, which are not radio-equipped; and d signs, markings and lighting for the taxiways, runways and construction area.3. HAZARD IDENTIFICATION PROCESS
The second task of the SAG is to identify the hazards and their possible consequences that may affect the aerodrome operation during construction, as follows: a State the generic hazard 1 Airport construction. 5-APP 1-2 Safety Management Manual SMM b State the specific components of the hazard 1 Construction vehicles crossing the primary runway. c Assess the consequences of the specific components of the generic hazard 1 Construction vehicles may deviate from prescribed procedures and cross the primary runway without an escort. 2 Aircraft could conflict with a crossing vehicle.4. SAFETY RISK ASSESSMENT PROCESS
Parts
» DOC 9859 FULL EN DOC 9859 FULL EN
» GENERAL OBJECTIVES CONCEPT CONTENTS .1
» OBJECTIVE AND CONTENTS .1 THE CONCEPT OF SAFETY .1
» THE EVOLUTION OF SAFETY THINKING .1
» ACCIDENT CAUSATION — THE REASON MODEL .1
» THE ORGANIZATIONAL ACCIDENT .1 BASIC SAFETY CONCEPTS
» PEOPLE, CONTEXT AND SAFETY — THE SHEL MODEL .1
» ERRORS AND VIOLATIONS Operational errors
» ORGANIZATIONAL CULTURE .1 BASIC SAFETY CONCEPTS
» SAFETY INVESTIGATION .1 BASIC SAFETY CONCEPTS
» OBJECTIVE AND CONTENTS .1 THE SAFETY STEREOTYPE .1
» THE MANAGEMENT DILEMMA .1 INTRODUCTION TO SAFETY MANAGEMENT
» THE NEED FOR SAFETY MANAGEMENT .1
» STRATEGIES FOR SAFETY MANAGEMENT .1
» THE IMPERATIVE OF CHANGE .1 SAFETY MANAGEMENT — EIGHT BUILDING BLOCKS .1
» FOUR RESPONSIBILITIES FOR MANAGING SAFETY .1
» OBJECTIVE AND CONTENTS HAZARDS AND CONSEQUENCES .1
» FIRST FUNDAMENTAL — UNDERSTANDING HAZARDS .1
» SECOND FUNDAMENTAL — HAZARD IDENTIFICATION .1
» THIRD FUNDAMENTAL — HAZARD ANALYSIS .1
» GENERAL INFORMATION SYSTEM REQUIREMENTS
» UNDERSTANDING DATABASES FOURTH FUNDAMENTAL — DOCUMENTATION OF HAZARDS .1
» DATABASE LIMITATIONS DATABASE INTEGRITY
» SAFETY DATABASE CAPABILITIES DATABASE SELECTION CONSIDERATIONS
» OBJECTIVE AND CONTENTS DEFINITION OF SAFETY RISK .1
» FIRST FUNDAMENTAL — SAFETY RISK MANAGEMENT .1
» SECOND FUNDAMENTAL — SAFETY RISK PROBABILITY .1
» THIRD FUNDAMENTAL — SAFETY RISK SEVERITY .1
» FOURTH FUNDAMENTAL — SAFETY RISK TOLERABILITY .1
» FIFTH FUNDAMENTAL — SAFETY RISK CONTROLMITIGATION .1
» SCENARIO SYSTEM DESCRIPTION HAZARD IDENTIFICATION PROCESS
» SAFETY RISK ASSESSMENT PROCESS SAFETY RISK CONTROLMITIGATION PROCESS
» HAZARD IDENTIFICATION AND SAFETY RISK MANAGEMENT LOG
» SCENARIO SYSTEM DESCRIPTION THE FIVE FUNDAMENTALS OF SAFETY RISK MANAGEMENT — SUMMARY .1
» HAZARD IDENTIFICATION PROCESS SAFETY RISK ASSESSMENT PROCESS
» SAFETY RISK CONTROLMITIGATION PROCESS
» OBJECTIVE AND CONTENTS ICAO SAFETY MANAGEMENT SARPS — GENERAL .1
» STATE SAFETY PROGRAMME SSP .1
» ACCEPTABLE LEVEL OF SAFETY ALoS
» SAFETY MANAGEMENT SYSTEM SMS .1
» SMS SAFETY PERFORMANCE .1 ICAO SAFETY MANAGEMENT SARPs
» MANAGEMENT ACCOUNTABILITY .1 ICAO SAFETY MANAGEMENT SARPs
» RELATIONSHIP BETWEEN AN SSP AND AN SMS .1
» COMPLIANCE AND PERFORMANCE .1 ICAO SAFETY MANAGEMENT SARPs
» OBJECTIVE AND CONTENTS INTRODUCTORY CONCEPTS .1
» SMS FEATURES .1 INTRODUCTION TO SAFETY
» SYSTEM DESCRIPTION .1 INTRODUCTION TO SAFETY
» GAP ANALYSIS .1 INTRODUCTION TO SAFETY
» SMS AND QMS .1 INTRODUCTION TO SAFETY
» SSPSMS AND THE ACCIDENT INVESTIGATION PROCESS .1 INTEGRATION OF MANAGEMENT SYSTEMS .1
» INTRODUCTION SYSTEM DESCRIPTION OF AN AERODROME
» GAP ANALYSIS ICAO SMS FRAMEWORK SMS GAP ANALYSIS FOR SERVICE PROVIDERS
» OBJECTIVE AND CONTENTS THE COMPONENTS AND ELEMENTS OF AN SMS .1
» THE ICAO SMS FRAMEWORK MANAGEMENT COMMITMENT AND RESPONSIBILITY .1
» SAFETY ACCOUNTABILITIES .1 SMS PLANNING
» APPOINTMENT OF KEY SAFETY PERSONNEL .1
» COORDINATION OF EMERGENCY RESPONSE PLANNING .1 SMS DOCUMENTATION .1
» OVERALL PURPOSE KEY ROLES Safety advocate RESPONSIBILITIES
» NATURE AND SCOPE QUALIFICATIONS AUTHORITY
» OBJECTIVE AND CONTENTS SAFETY RISK MANAGEMENT — GENERAL .1
» HAZARD IDENTIFICATION .1 SMS OPERATION
» RISK ASSESSMENT AND MITIGATION .1
» SAFETY ASSURANCE — GENERAL .1 SMS OPERATION
» SAFETY PERFORMANCE MONITORING AND MEASUREMENT .1
» PROTECTION OF SOURCES OF SAFETY INFORMATION .1
» CONTINUOUS IMPROVEMENT OF THE SMS .1
» THE RELATIONSHIP BETWEEN SAFETY RISK MANAGEMENT SRM AND SAFETY ASSURANCE SA
» SAFETY PROMOTION — TRAINING AND EDUCATION .1
» OBJECTIVE AND CONTENTS WHY ADOPT A PHASED APPROACH TO SMS IMPLEMENTATION .1
» PHASE I — PLANNING SMS IMPLEMENTATION .1
» PHASE II — REACTIVE SAFETY MANAGEMENT PROCESSES .1
» REFERENCES DEFINITIONS GENERAL SAFETY POLICY AND OBJECTIVES 1 General requirements
» QUALITY POLICY IMPLEMENTATION OF THE SMS
» PHASE I — PLANNING SMS IMPLEMENTATION
» PHASE II — REACTIVE SAFETY MANAGEMENT PROCESSES
» PHASE III — PROACTIVE AND PREDICTIVE SAFETY MANAGEMENT PROCESSES
» PHASE IV — OPERATIONAL SAFETY ASSURANCE
» OBJECTIVES AND CONTENTS THE COMPONENTS AND ELEMENTS OF AN SSP .1
» THE ICAO SSP FRAMEWORK SSP DEVELOPMENT .1
» GAP ANALYSIS ICAO SSP FRAMEWORK
» STATE SAFETY PROGRAMME SSP GAP ANALYSIS
» GENERAL REMEDIAL MEASURES External training, communication and dissemination of safety information
» ENFORCEMENT PROCEDURES PROPORTIONALITY OF RESPONSES NATURAL JUSTICE AND ACCOUNTABILITY EXCEPTIONS
» GENERAL APPLICABILITY External training, communication and dissemination of safety information
» PROCEDURES External training, communication and dissemination of safety information
» State safety responsibilities and accountabilities
» INTRODUCTION External training, communication and dissemination of safety information
» ICAO REQUIREMENTS ERP CONTENTS
Show more