34.25 WINRIP DOC MPR CTC MPR No.49 2017 01 20170131 00445

Western I ndonesia National Roads I mprovement Project 4 - 6 Pavement. The contractor urges the Time Extention of 3.5 Months, to the completion of the work. For more details of the Contract Package, refer to ANNEX P-11 Executive Summary Report . Package No. 12 : Kambang - Indrapura The actual progress as of this month is only 4.03 since 8 months elapsed from the COW against the scheduled 15.87. Furthermore, this month progress is only 0.01 either. The main reason for the srious delay that not only the contractor s construction management system and organization of staffs are totally collapsed but also the supports and concern of the contractor s head office to this project are likely not made up to now. For instance, the contractor s General Superintendant has been absent for 3 months and it seems there are no experienced and or qualified staffs on the site. The only hopeful site situation is that plantiful natural river stones are stockpiled in the Base Camp and the quarry site is located in only 2 Km from the Base Camp. Details of the Contract Package are shown in ANNEX P-12 Executive Summary Report . Package No. 13 : Sp. Rukis Tj. Kemuning The progress of this month 8.48 has been leaded by the asphalt pavement affected 100. Some of the granular pavement works on the strecth sta. 43 KM~56 km are constructing but not completed for measuring the work progress. At this stage, the contractor has a lot of working areas for asphalt pavement for wearing course apprx. 15 Km thus, within a few months, they will have a positive progress from the pavement for the time being. Accordingly, the big slippage rate -41.51 also could be improved for coming several months. The most considerable elemants to reach the successful completion of this project are how to settled the land acquisition on the strecth sta. 25 km ~ 43 Km 18 Km long earlier. Details of the work progress are shown in ANNEX P-13 Executive Summary Reports. Package No. 14: Painan - Kambang The work progress of this month is only 2.02 against the scheduled 4.18 according to the revised schedule to be completed as of Dec. 2017. The accumulated slippage rate will be -4.09. At this present, the work progress is only done from the strecth sta 0 Km~12 Km. The contractor has to develope the other working areas in order to catch up the delayed progress. ANNEX P-14 Executive Summary Report shows the complete details of the project. Package No. 15: Sibolga Bts. Tapsel During this month, the progress is achieved of 13.73 against the scheduled 5.5. Therefore, the slipagge rate as well has been reduced up to -15.7 from -23.93.