Quality Assurance WINRIP DOC MPR CTC MPR No.49 2017 01 20170131 00445

Western I ndonesia National Roads I mprovement Project 4 - 10

4.6 Environmental and Social Considerations

4.6.1 Current Overall Situation

A project category is assigned to each package as either Category A, B or C depending on the likely degree of influence on environmental issues with a brief explanation as follows: Category A project is one which will have a significant negative impact on the environment and may have an influence on areas outside the actual project area. A project classified as such requires an Amdal Andal, RKLRPL study. Category B project is one which affects the people or the environment to some extent but with a smaller impact than a Category A. The required environmental analysis is a UKLUPL study only. Category C project has minimal effect on the people or environment and an environmental analysis is not required. SPPL are used to handle any minor problem which may arise. Details of packages that require environmental and social safeguard are given in Appendix E and the following Table 4.3 provides a summary of the work involved in the 18 WINRIP packages. All the eighteen 18 packages require environmental impact investigations and studies which need the approval by Environmental Agency BLH. Nine 9 of the eighteen 18 packages are categorized under Category A projects wherein AmdalEIA studies are required and have to be approved by World Bank. The nine 9 packages are covered only by five 5 AmdalEIA studies as some single study covers a combination of two 2 or three 3 sub-projects as indicated in Table 4.3. While 21 social studies SLARAP and LARAP require the approval of the World Bank. Up to 30 June 2016, all the 22 environmental studies for the eighteen 18 sub-projects including a separate study UKL-UPL for Air Gadang Bridge on Package No.2 were approved by BLH with 5 of these studies AmdalEIA were granted No Objection Letter NOL from the World Bank while all the 18 social studies LARAP were already issued No Objection Letter NOL from the World Bank. Table 4.3 Works Program No of Packages No of Investigations Approval by Remarks BLH World Bank AWP-1 4 9 1 - Amdal 2 UKL-UPL 2 - SPPL 4 - Full LARAP 1 - Amdal 2 UKL-UPL 2 - SPPL 1 - EIA No Need No Need 4 - Full LARAP Coverage of Single AmdalEIA study are the following Packages : a Packages 1 and 17 b Package 7,12 and 14 c Package 11 and 16 d Package 8 AWP-2 7 18 3 - Amdal 4 UKL-UPL 1 - Simple LARAP 8 - Full LARAP 3 - Amdal 4 UKL-UPL 3 - EIA No Need 1 - SLARAP 8 - Full LARAP AWP-3 7 16 1 - Amdal 5 UKL-UPL 8 - Full LARAP 1 Amdal; 5 UKL-UPL 1 - EIA No Need 8 - Full LARAP Total 18 43 Env=16,Soc=18 18 Env= 4, Soc=18 Note: 1 UKL UPL do not need a NOL from WB, and SPPL not necessary to submit to the WB. 2 Packages 9 and 18 to be deleted. 3 Air Gadang Bridge have separate investigation, hence, total equals 22. Appendix E shows the Progress of Environmental Safeguard Studies. Western I ndonesia National Roads I mprovement Project 4 - 11

4.6.2 Environmental and Social Issues

This section outlines the activities of the Social Impact Specialist and the Environmental Specialist during December 2016.

4.6.2.1 Environmental Issues

The main environmental issues, specifically on the packages under construction are the implementation of mitigating measures on pollution of spilled oil, grease and solid waste in the Contractors Base Camps. Air and dust pollution along stretches of thickly populated areas are not properly addressed by the Contractors. Water spraying is not continuously implemented. Dump trucks transporting construction material are not fully covered and traffic management plan is not fully implemented then impact of the quarry operation not manage by the supplier cause of erosion on river side and the holes in the quarry site and not reclaimed, etc. Environmental issues on each of the individual sub-projects Packages are shown in Appendix E of this Report. Monitoring of Environmental Aspects During Construction CTC provided revised monitoring forms to DSC and Contractor for use in monitoring of environmental and social impacts. These forms are to be used every month by the DSC Site Engineer because no available for Environmental Specialist. CTC s environmental staffs actively advises DSC on environmental monitoring, DSC have directly carried out monitoring or to implement the Environmental and Social Analysis Management Plan ESAMP for WINRIP. CTC s Environment Specialist monitored the implementation of environmental mitigations during the month of December 2015 and the following were observed : Package No.1 : Krui Biha a Take over certificate at 20 January 2016. aStatus on Feb 2016 are: the quarry, AMP Stone Crusher permits from Bupati, the quarry owner contractor not yet make changes the permission Bupati to Governor refer Law No.23 year 2014.b The monitoring report prepared by the DSC site supervision team lack some necessary informations ; photograph not provided, remarks not filled up. b The RKPPL : Complete, NOL issued from the WB on 23 Feb 2015, RKPPL implementation Environmental Quarterly was Complete until period 3 Oct - Dec 2015. c the external monitoring of implementation AMDAL period 4 was submit to the WB on 29 April 2015,complete. d The Integration of recommendation AMDAL in to the design Complete. e The HIV-AIDS Campaign complete on 10 November 2016, f. UKLUPL implementation report for quarry prepared by quarry owner not available. Package No.2 : Pd. Sawah Sp. Empat and Air Gadang Bridge a the project has been PHOcomplete, b 1 one PAP in bridge approach not affected by project, due the design changes adapted to the field.. b The HIV-AIDS campaign on 17 November 2015 was complete c The external monitoring of implementation AMDAL period 4 was submit to the WB on 29 April 2015complete. Western I ndonesia National Roads I mprovement Project 4 - 12 d The Integration of recommendation AMDAL in to the design Complete e UKLUPL implementation report for quarry prepared by quarry owner not available. Package No.3 : Manggopoh Pd. Sawah a Take over certificate at 20 March 2016, b The HIV-AIDS campaign on 17 November 2015 was complete, c The quarry, AMP Stone Crusher permits from Governorcomplete. d the quarry owner was manage part of environmental impact on quarry with replanting on side river. e Unknown the UKLUPL implementation submit to BLH, f The monitoring report prepared by the DSC site supervision team lack some necessary informations ; photograph not provided, remarks not filled up. Package No.4 : Ipuh Bantal a the project has been PHOcomplete, b b The HIV-AIDS campaign on 5 December 2015 was complete c The external monitoring of implementation AMDAL period 4 was submit to the WB on 29 April 2015complete. d The Integration of recommendation Amdal in to the design Complete e UKLUPL implementation report for quarry prepared by quarry owner not available. Package No.5 : Sp.Rampa Poriaha  Quarry, AMP Stone Crusher permits from Bupati was complete extend licensing until Dec 2017the quarry permits was available before new law issued.  The quarry owner has been manage the quarry by reclamation with replanting.  PPK under process izin pinjam pakai kawasan hutan with the Forestry Ministry related the review design of link. There issues for the land acquisition. Erosion on some roads segment  Oil grease in Base camp has been manage and part of stone hill will be blasting. Explosivedetonator  The storages explosive was built, Health Safety was implemented.  the PAP not disturb civil work, not issues for the land acquisition Package No.6 : Ps. Pedati Kerkap Based on CTC survey on September 2016 environmental issues was found: a The contractor has been manage the oil grease in Base camp, b part of segment has been asphalt concrete, c No roads sign around construction site. d Lay out the storage of stockpile in base camp is not