5.68 Bin Umpan Cangkang Kelapa Sawit T-102
Fungsi : Tempat penyimpanan umpan CKS Bahan konstruksi : Carbon steel Bentuk : Ellipsoidal Head Bin Jumlah : 2 unit R θ H Hh Hss Hc Dd Gambar LC.3 Elipsoidal Head Bin umpan Cangkang Kelapa Sawit Kondisi penyimpanan Temperatur : T = 30°C 303,15 K Tekanan operasi : P = 1 atm 101,325 kPa Kebutuhan perancangan : t = 1 hari Laju alir massa : F = 80512.722 lbjam untuk kapasitas 1 bin Densitas CKS : ρ w = 81,156 lbft 3 1. Menghitung sudut luar kerucut dasar bin Ө Ө = Ө r + 5 o Ө r = angle of repose slide angle = 36 o Sumber : Tabel Slide Angle untuk beberapa material Maka sudut luar kerucut dasar bin: Ө = 41 o 2. Trial jari-jari dalam bin R dan menghitung dimensi lainnya. R ditrial sampai diperoleh volume bin V ~ volume CKS yang disimpan Vw Universitas Sumatera Utara Setelah beberapa trial, diperoleh : R = 5,19463 ft = 1,58332 m Hc = R × tan Ө = 4,516 ft = 1,376 m Hh = 2 × R × d Untuk ellipsoidal head, d = 0,25 = 2,597 ft = 0,792 m Dipilih, H = 3 × R H = tinggi total bin = 15,5839 ft = 4,74997 m Hss = H – Hc – Hh = 8,471 ft = 2,582 m a. Menghitung Volume Bin V bin V bin = Vh + Vss + Vc Vh = a × 2R 3 untuk ellipsoidal head, a = 0,131 = 146,789 ft 3 Vss = π × R 2 × Hss = 717,745 ft 3 Vc = 3 2 Hc R π = 127,537 ft 3 Maka, V bin = 992,071ft 3 b. Menghitung volume CKS yang disimpan Vw = w F ρ = 992,071 ft 3 Terlihat bahwa V bin ~ Vw 3. Menghitung diameter outlet partikel Dd Dd = 0,75 × R = 3,896 ft = 1,187 m Universitas Sumatera Utara5.69 Bin Olivine T-103
Fungsi : Tempat penyimpanan Olivine Bahan konstruksi : Carbon steel Bentuk : Ellipsoidal Head Bin Jumlah : 1 unit R θ H Hh Hss Hc Dd Gambar LC.4 Ellipsoidal Head Bin Olivine Kondisi penyimpanan Temperatur : T = 30°C 303,15 K Tekanan operasi : P = 1 atm 101,325 kPa Kebutuhan perancangan : t = 6 bulan Laju alir massa : F = 860842.0279lb Stok 6 bulan Densitas Olivine : ρ w = 100 lbft 3 3. Menghitung sudut luar kerucut dasar bin Ө Ө = Ө r + 5 o Ө r = angle of repose slide angle = 36 o Sumber : Tabel Slide Angle untuk beberapa material Maka sudut luar kerucut dasar bin: Ө = 41 o 4. Trial jari-jari dalam bin R dan menghitung dimensi lainnya. R ditrial sampai diperoleh volume bin V ~ volume olivine yang disimpan Vw Universitas Sumatera Utara Setelah beberapa trial, diperoleh : R = 10,5284 ft = 3,20905 m Hc = R × tan Ө = 7,64932 ft = 2,33151143 m Hh = 2 × R × d Untuk ellipsoidal head, d = 0,25 = 5,26419 ft = 1,60453 m Dipilih, H = 3 × R H = tinggi total bin = 31,5851 ft = 9,62715 m Hss = H – Hc – Hh = 18,6716 ft = 5,69111 m a. Menghitung Volume Bin V bin V bin = Vh + Vss + Vc Vh = a × 2R 3 untuk ellipsoidal head, a = 0,131 = 1222,12 ft 3 Vss = π × R 2 × Hss = 6498,83 ft 3 Vc = 3 2 Hc R π = 887,471 ft 3 Maka, V bin = 8608,42 ft 3 b. Menghitung volume Olivine yang disimpan Vw = w F ρ = 8608,42 ft 3 Terlihat bahwa V bin ~ Vw 3. Menghitung diameter outlet partikel Dd Dd = 0,4 × R = 4,2114 ft = 1,2836 m Universitas Sumatera Utara5.70 Bin MgO T-104
Parts
» Perumusan Masalah Tujuan Perancangan Ruang Lingkup Perancangan Manfaat Perancangan
» Gambaran Umum Hidrogen TINJAUAN PUSTAKA
» Kelapa Sawit Komposisi Cangkang Kelapa Sawit
» Oksidasi parsial Integrated gasification combined cycle IGCC
» Pirolisis Elektrolisis air Produksi hidrogen secara biologi
» Steam Reformer R-401 Reaktor High Temperature Shift Converter R-402
» Gasifier Cyclone S-201 Cyclone S-202 Char Combustor R-202
» Cyclone S-203 Reformer R-203 Cooler H-201 H-202
» Scrubber Gas Sintesis M-301 M-302 Quench Water Recirculation Cooler Knock Out Drum S-301
» Compressor K-301A Air-cooler H-302A Knock Out Drum S-302A Compressor K-301B
» Air-cooler H-302B Knock Out Drum S-302B Compressor K-301C Air-cooler H-302C
» Knock Out Drum S-302C Compressor K-301D Air-cooler H-302D Knock Out Drum S-302D
» Compressor K-301E Air-cooler H-302E After-cooler H-303 Post-Compressor Knock-Out S-303
» Steam Reformer R-401 NERACA ENERGI
» Air-Cooler H-408 After-cooler H-409 Pre-PSA Knock-Out 2 S-402 Pressure Swing Adsorption Unit S-403
» Bin Katalis Olivine T-105 Screw Conveyor C-102 Olivine Screw Conveyor C-103 Gasifier R-201
» Cyclone S-203 Char Combustor R-202
» Blower K-201 Reformer R-203 Cooler H-201
» Cooler H-202 Quench Chamber M-301
» Venturi Scrubber M-302 Pompa P-301 Quench Water Recirculation Cooler H-301
» Knock Out Drum S-301 Compressor K-301A Air-cooler H-302A
» Knock Out Drum S-302A Compressor K-301B Air-cooler H-302B
» Knock Out Drum S-302B Compressor K-301C Air-cooler H-302C
» Knock Out Drum S-302C Compressor K-301D Air-cooler H-302D
» Knock Out Drum S-302D Compressor K-301E Air-cooler H-302E
» After-cooler H-303 Post-Compressor Knock-Out S-303 Pompa P-302
» Steam Reformer R-401 Flue Gas Reformer Feed Preheater H-401 Flue Gas CoolerSteam Superheater H-404
» Reformer Syngas CoolerSteam Generator 2 H-402 Reformer Syngas CoolerSteam Superheater 1 H-403
» PSA PrecoolerDeaerator Water Preheater 1 H-407 Pre-PSA Knock-Out 1 S-401 Air-Cooler H-408
» Aftercooler H-409 Pre-PSA Knock-Out 2 S-402 Pressure Swing Adsorption Unit S-403
» Tujuan Pengendalian Jenis-Jenis Pengendalian dan Alat Pengendali
» Syarat Perancangan Pengendalian Elemen Pengendali Akhir
» Kebutuhan air proses Kebutuhan air lainnya
» Screening Sedimentasi Klarifikasi Kebutuhan Air
» Filtrasi Demineralisasi Kebutuhan Air
» Kebutuhan Uap air Steam Kebutuhan Bahan Kimia Kebutuhan Listrik Kebutuhan Bahan Bakar
» Bak Penampungan BP Bak Pengendapan Awal BPA Bak Netralisasi BN
» Unit Pengolahan Limbah dengan Sistem Activated Sludge Lumpur Aktif
» Lokasi Pabrik LOKASI DAN TATA LETAK PABRIK
» Tata Letak Pabrik Perincian Luas Tanah
» Bentuk Organisasi Garis Bentuk Organisasi Fungsionil Bentuk Organisasi Garis dan Staf
» Manajemen Perusahaan ORGANISASI DAN MANAJEMEN PERUSAHAAN
» Dewan Komisaris Direktur Sekretaris Manajer Produksi Manajer Teknik
» Sistem Kerja Jumlah Karyawan dan Tingkat Pendidikan
» Sistem Penggajian ORGANISASI DAN MANAJEMEN PERUSAHAAN
» Tata Tertib JAMSOSTEK dan Fasilitas Tenaga Kerja
» Modal Investasi Tetap MIT Fixed Capital Investment FCI Modal Kerja Working Capital WC
» Profit Margin PM Break Even Point BEP Return on Investment ROI Pay Out Time POT
» Perhitungan berat molekul dari olivine dan katalis olivine Komponen
» Char Combustor R-202 KESIMPULAN
» Cyclone S-203 Reformer R-203
» Cooler H-201 H-202 KESIMPULAN
» Scrubber Gas Sintesis M-301 M-302
» Quench Water Recirculation Cooler Knock Out Drum S-301
» Compressor K-301A Air-cooler H-302A
» Knock Out Drum S-302A Compressor K-301B
» Air-cooler H-302B Knock Out Drum S-302B
» Compressor K-301C Air-cooler H-302C
» Knock Out Drum S-302C Compressor K-301D
» Air-cooler H-302D Knock Out Drum S-302D
» Compressor K-301E Air-cooler H-302E
» After-cooler H-303 Post-Compressor Knock-Out S-303
» Steam Reformer R-401 Entalpi aliran umpan dari S-303, H
» Reformer Syngas CoolerSteam Generator 2 H-402
» Reformer Syngas CoolerSteam Superheater 1 H-403 High Temperature Shift Reactor R-402
» Low Temperatura Shift Precooler Deaerator Water Preheater 2 Low Temperature Shift Reactor R-403
» PSA PrecoolerDeaerator Water Preheater 1 H-407
» Air-Cooler H-408 Aftercooler H-409
» Pre-PSA Knock-Out 2 S-402 Pressure Swing Adsorption Unit S-403
» Pre Hydrogen Compressor Knock Out S-501 Compressor Hydrogen 1st Interstage K-501A
» Elevator Cangkang Kelapa Sawit C-101 Landfill Umpan Cangkang Kelapa Sawit T-101
» Bin Umpan Cangkang Kelapa Sawit T-102 Bin Olivine T-103
» Bin MgO T-104 Bin Katalis Olivine
» CKS Feed Screw Conveyor C-102 Olivine Screw Conveyor C-103 Gasifier R-201
» Quench Chamber M-301 KESIMPULAN
» Venturi Scrubber M-302 KESIMPULAN
» Quench Water Recirculation Cooler H-301
» Compressor K-301A KESIMPULAN
» Air-cooler H-302A KESIMPULAN
» Compressor K-301B KESIMPULAN
» Air-cooler H-302B KESIMPULAN
» Compressor K-301C KESIMPULAN
» Air-cooler H-302C KESIMPULAN
» Compressor K-301D KESIMPULAN