Variabel Penelitian METODE PENELITIAN

41

BAB IV HASIL DAN PEMBAHASAN

4.1 Perhitungan Mesin Pembangkit Listrik Tenaga Gas dan Uap PT. Indonesia

Power Unit Pembangkitan Semarang Uraian satuan GTG 1.2 GTG 1.3 GT Gen load MW 70 70 Air Inlet Temp 1 T C  29 30 Comp. Disch Temp 2 T C  332 321 Exhaust Temp 4 T C  553 560 Tekanan udara luar 1 P Bar 1.013 1.013 Comp. Disch Press gage 2 P Bar 8.38 7.92 gage 2 1 2 P P P + = Bar 9,393 8,933 Fuel flow mf s kg 5.12 3.63 HV kg KJ 54610.44 54610.44 Data Output Data Output diperoleh melalui proses perhitungan, dimana data ini meliputi antara lain : a Temperatur udara tekan ideal T s 2 K 40 , 570 T K 302 T T T s 2 013 , 1 393 , 9 s 2 P P 1 s 2 004 , 1 1 004 , 1 k 1 - k 1 2 = × = × = b Temperatur Ruang Bakar T 3 [ ] kg KJ 3 Kg KJ Kg KJ Kg KJ 3 2 2 3 3 3 Kg KJ Kg KJ Kg KJ 2 3 s kg s kg s kg f a g s KJ bakar bahan kg KJ s kg bakar bahan f bakar bahan 3 013 , 1 393 , 9 3 P P 4 3 591 , 629 h K 1,68715 302K - K 04 , 570 K 1,044 - K 97 , 1439 K 205 , 1 h s Δ T - T t cp - T t cp h K 68715 , 1 s Δ K 1,70868 - K 39583 , 3 s Δ s - s s Δ 35 , 215 g m 12 , 5 23 , 210 g m m m m 4272 , 279605 Q 54610,44 12 , 5 Q HV m Q K 97 , 1439 T K 826 T T T 1,004 1 - 004 , 1 k 1 - k 1 2 = • × × • × • = × × × = • = • • = = = + = + = = × = × = = × = × =          c Temperatur gas buang ideal T s 4 K 40 , 762 T K 97 , 1439 T T T s 4 393 , 9 013 , 1 s 4 P P 3 s 4 004 , 1 1 - 004 , 1 k 1 - k 2 1 = = = d Laju Aliran udara m a  s kg a kg KJ kg KJ a GT a 23 , 210 m 302K] K 1,005 - K 605 K 052 , 1 [ KW 70000 m T1] cpt1 - 2 T 2 cpt [ W m = × • × • = × × =     e Efisiensi Kompresor η kompresor 6 , 93 η K 302 K 005 , 1 23 , 210 KW 70000 K 04 , 570 K 044 , 1 23 , 210 η T t cp m W T t cp m η kom presor Kg KJ s kg Kg KJ s kg kom presor 1 1 a GT 2 2 a Kom presor = × • × + × • × = × × + × × =    f Efisiensi Ruang Bakar η ruangbakar 5 , 33 η 23 , 210 K 04 , 570 K 044 , 1 KW 4272 , 279605 35 , 215 591 , 629 η m T t Cp Q m h η cc s kg kg KJ s kg kg KJ cc a 2 2 bakarl bahan g 3 cc = × × • + × = × × + × = • • • g Efisiensi Turbin Gas η TurbinGas 63 , 66 η K 97 , 1439 K 205 , 1 23 , 215 K 826 K 10472 , 1 23 , 215 KW 70000 η T t cp m T t cp m W η t kg KJ s kg kg KJ s kg t 3 3 g 4 4 g GT t = × • × × • × + = × × × × + =    h Efisiensi Gas Turbin Generator η GTG 04 , 25 η KW 4272 , 279605 KW 70000 η Q W η GTG GTG Bakar bahan GT GTG = = = • Uraian satuan HRSG 1.2 HRSG1.3 PressTemp LP Economizer BarC 17.128 16 152 Flow LP Economizer kgh 175000 165000 PressTemp LP Drum BarC 6.5 128 6.4 152 PressTemp LP Superheat BarC 6 302 6.1 305 Flow LP Superheat kgh 19000 31000 PressTemp HP Economizer BarC 121 168 122 Flow HP Economizer kgh 119500 119000 PressTemp HP Drum BarC 22 269 53 267 PressTemp HP superheat BarC 52 514 53 515 Flow HP Superheat kgh 127000 110000 Arus Motor HP Xfer Pump Amp 71 70 Data Output Data Output diperoleh melalui proses perhitungan, dimana data ini meliputi antara lain : a Efisiensi HRSG [ ] 78 , 72 η 215,23 405K K 1,0137 - 23 , 215 K 40 , 762 K 089975 , 1 56 , 40 89 , 683 982,8W 28 , 35 33 , 810 1341,9W - 17 , 3464 28 , 35 93 , 2862 28 , 5 η m T t cp - m T t cp ] m h W m h [W - h m h m η HRSG s kg kg KJ s kg kg KJ s kg kg KJ s kg kg KJ kg KJ s kg kg KJ s kg HRSG g HRSG keluar keluarHRSG g 4 4 Hp Hp transfer hp pom pa Lp Lp kondensat pom pa SH HP HP SH LP LP HRSG = × × • × × • × + + × + × + × = × × × × × + + × + × + × = • • • • • b Efisiensi Pompa HP Transfer 31 , 98 η 89 , 683 56 , 40 W 9 , 1341 33 , 810 28 , 35 η h m W h m η Pum p Transfer HP kg KJ s kg kg KJ s kg Pum p Transfer HP LP LP Pom pa HP HP Pum p Transfer HP = × + × = × + × = • • Uraian Satuan STG 1.0 ST Gen Load MW 65 Press IPC AB BarBar 50 Temp IPC AB CC 516 Press APC Bar 6 Temp APC C 300 Vacum Press mm HG 42 Press Disch Cond. Pump Bar 18.6 Temp Disch Cond. Pump C 38 Flow Disch Cond. Pump kgh 402700 Arus Motor Cond. Pump Amp 52 Data Output Data Output diperoleh melalui proses perhitungan, dimana data ini meliputi antara lain : a Efisiensi turbin uap KW 78 , 232855 Q 797 , 2564 76 , 90 Q h m Q KW 38 , 277962 W 63 , 3061 79 , 90 W h m W KW 17 , 266923 W 03 , 3471 90 , 76 W h m W 79 , 90 m 89 , 13 90 , 76 m m m m kondensor kg KJ s kg kondensor kondensor total Kondensor LP kg KJ s kg LP LP total LP HP kg KJ s kg HP HP HP HP s kg total s kg s kg total LP HP total = × = × = = × = × = = × = × = = + = + =            66 , 54 η KW 65000 KW 78 , 232855 KW 38 , 277962 KW 17 , 266923 η W Q W W η ST ST st Kondensor LP HP ST = + + = + + =   b Efisiensi kondensor 67 , 5 η 797 , 2564 79 , 90 51 , 145 79 , 90 η h m h m η kondensor kg KJ s kg kg KJ s kg kondensor kondensor g total kondensor f total kondensor = × × = × × =   c Efisiensi pompa kondensat

Dokumen yang terkait

Pengaruh Pendapatan Asli Daerah (PAD), Dana Alokasi Umum (DAU), dan Dana Alokasi Khusus (DAK) terhadap Belanja Modal pada Kota di Pulau Sumatera

3 155 93

Analisis Flypaper Effect Dana Alokasi Umum (DAU), Pendapatan Asli Daerah (PAD), Belanja Daerah Terhadap Efisiensi Kinerja Keuangan Pemerintah Daerah Kabupaten/Kota di Sumatera Utara

3 74 100

Pengaruh Pendapatan Asli Daerah, Dana Alokasi Umum dan Dana Alokasi Khusus Terhadap Belanja Daerah di Provinsi Aceh

1 50 99

Pengaruh Pendapatan Asli Daerah (PAD), Dana Alokasi Umum (DAU), Dana Alokasi Khusus (DAK) Terhadap Pertumbuhan Ekonomi Dengan Belanja Modal Sebagai Variabel Intervening Di Kabupaten Dan Kota Provinsi Aceh

5 75 107

Pengaruh Pendapatan Asli Daerah, Dana Alokasi Umum, Dana Alokasi Khusus Terhadap Belanja Daerah Pada Pemerintahan Kabupaten Dan Kota Di Provinsi Jambi

6 89 104

Pengaruh Dana Alokasi Umum (DAU) Dan Pendapatan Asli Daerah (PAD) Terhadap Belanja Langsung Pemerintah Kabupaten/Kota Di Sumatera Barat

3 56 90

Pengaruh Pendapatan Asli Daerah (PAD), Dana Bagi Hasil (DBH), Dana Alokasi Umum (DAU), dan Dana Alokasi Khusus (DAK) terhadap Indeks Pembangunan Manusia (IPM) di Kabupaten/Kota Provinsi Nusa Tenggara Barat periode Tahun 2009-2012

1 17 161

PENGARUH EFISIENSI BEBAN OPERASI TERHADAP PROFITABILITAS PT INDONESIA POWER UNIT BISNIS PEMBANGKITAN SAGULING.

0 0 43

Analisis laju kerusakan exergy dan efisiensi exergy mesin PLTGU PT. Indonesia Power Unit Pembangkitan Semarang.

2 14 88

ANALISA SISTEM EKSITASI GENERATOR SINKRON 3 PHASA GTG 1 DI PLTGU UNIT 1 SEKTOR PENGENDALIAN PEMBANGKITAN KERAMASAN

0 0 14