- 65 - Beban penyusutan dan deplesi aset tetap
dialokasikan sebagai berikut: Depreciation and depletion expense of fixed assets
was allocated as follows:
30 September 30 September
September 30, September 30,
2015 2014
Unaudited Unaudited
Beban pabrikasi 967.360.814
867.411.784 Manufacturing cost
Beban usaha 62.161.442
54.461.292 Operating expenses
Jumlah 1.029.522.256
921.873.076 Total
Hak atas tanah Grup berupa Sertifikat Hak Milik “SHM” dan Sertifikat Hak Guna Bangunan
“SHGB”. SHGB memiliki masa berlaku antara tahun 2014 hingga 2043. Manajemen berpendapat
bahwa SHGB tersebut dapat diperpanjang. The Group’s land represents freehold land “SHM”
and land- use rights “SHGB”. The SHGB will
expire between 2014 until 2043. Management believes that the SHGB are extendable.
Pada tanggal 30 September 2015 tingkat penyelesaian atas aset dalam penyelesaian adalah
sebagai berikut: The completion stage of construction in progress
as of September 30, 2015 is as follows: The completion stage of construction in progress as of
December 31, 2014 is as follows:
Estimasi tahun
Persentase penyelesaian
penyelesaian Estimated
Completion completion
percentage year
Tanah pertambangan 3 - 70
2015 - 2016 Mining land
Bangunan, jalan, jembatan Building, roads, brodges
dan pelabuhan 20 - 95
2015 and harbors
Mesin-mesin 20 - 92
2015 - 2016 Machineries
Perlengkapan 91 - 98
2015 Equipment
Pabrik Semen 17 - 26
2015 - 2016 Cement plants
Biaya perolehan pembangunan pabrik semen dan pembangkit listrik termasuk biaya pinjaman
yang dikapitalisasi
sebesar masing-masing
Rp475.329.066 dan Rp475.329.066 sampai dengan 30 September 2015 dan 31 Desember 2014, selisih
kurs mata uang asing yang merupakan lindung nilai atas komitmen pengadaan peralatan utama masing-
masing sebesar Rp38.183.320 dan RpNihil pada tanggal 30 September 2015 dan 31 Desember 2014.
Biaya pinjaman terdiri dari biaya bunga dan amortisasi biaya transaksi atas pinjaman bank.
The construction costs of cement and power plants include capitalized borrowing costs of
Rp475,329,066 and Rp475,329,066 for the period ended September 30, 2015 and December 31,
2014, respectively, and foreign currency exchange differences arose from hedging commitments for
the procurement
of main
equipment of
Rp38,183,320 and RpNil, as of September 30, 2015 and December 31, 2014, respectively.
Borrowing costs consist of interest expense and amortization of transaction costs on bank loans.
Penambahan aset tetap yang berasal dari transaksi nonkas aktivitas investasi dan pendanaan untuk
periode yang berakhir pada tanggal 30 September 2015 dan 31 Desember 2014 masing-masing adalah
sebagai berikut: Addition of fixed assets from a non-cash
transactions in investing and financing activities for period ended September 30, 2015 and December
31, 2014, are as follows:
Aset sewa pembiayaan masing-masing sebesar Rp12.665.547 dan Rp79.852.524.
Assets under finance leases of Rp12,665,547
and Rp79,852,524, respectively.
Kapitalisasi beban pinjaman yang belum dibayar masing-masing sebesar RpNihil dan
Rp48.708.665.
Capitalization of unpaid borrowing costs of RpNil and Rp48,708,665, respectively.
DAN ENTITAS ANAK CATATAN ATAS LAPORAN KEUANGAN
KONSOLIDASIAN UNTUK PERIODE YANG BERAKHIR PADA
30 SEPTEMBER 2015 Disajikan dalam ribuan Rupiah,
kecuali dinyatakan lain Lanjutan PT SEMEN INDONESIA PERSERO Tbk
AND ITS SUBSIDIARIES NOTES TO THE CONSOLIDATED
FINANCIAL STATEMENTS FOR THE PERIOD ENDED
SEPTEMBER 30, 2015 Expressed in thousands of Rupiah,
unless otherwise stated Continued
- 66 -
Reklasifikasi dari uang muka proyek masing- masing
sebesar Rp720.586.021
dan Rp41.408.540.
Reclassification of project advances of
Rp720,586,021 and
Rp41,408,540, respectively.
Kapitalisasi biaya pembongkaran masing-
masing sebesar Rp457.276 dan Rp2.226.615.
Capitalization of costs of dismantling of Rp457,276 and Rp2,226,615, respectively.
Aset tetap tertentu digunakan sebagai jaminan atas fasilitas pinjaman non-cash loan dan fasilitas kredit
investasi Catatan 20. Certain fixed assets are used as collateral for non-
cash loan facilities and credit investment facilities Note 20.
Jumlah harga perolehan tercatat aset tetap yang telah disusutkan penuh dan masih digunakan
pada tanggal 30 September 2015 dan 31 Desember 2014 masing-masing sebesar Rp3.049.893.472 dan
Rp3.051.175.714. The carrying amount of fixed assets that are fully
depreciated and still in use for production as of September 30, 2015 and December 31, 2014,
amounted to
Rp3,049,893,472 and
Rp3,051,175,714, respectively. Nilai wajar aset tetap pada tanggal 30 September
2015 dan 31 Desember 2014 masing-masing sebesar Rp54.762.304.958 dan Rp34.193.436.580.
Fair value of fixed assets as of September 30, 2015 and
December 31,
2014 amounted
to Rp54,762,304,958
and Rp34,193,436,580,
respectively. Rincian laba penjualan aset tetap adalah sebagai
berikut: Details of gain on sale of fixed assets are as
follows:
30 September 30 September
September 30, September 30,
2015 2014
Unaudited Unaudited
Hasil penjualan neto -
4.095.227 Net proceeds from sale
Biaya perolehan: Acquisition cost:
Alat berat 11.649.103
13.425.394 Heavy equipment
Peralatan -
146.726 Equipment
11.649.103 13.572.120
Akumulasi penyusutan: Accumulated depreciation:
Alat berat 11.649.103
13.425.394 Heavy equipment
Peralatan -
146.726 Equipment
11.649.103 13.572.120
Nilai buku neto -
- Net book value
Laba penjualan aset tetap -
4.095.227 Gain on sale of fixed assets
Pada tanggal 15 Januari 2009, Direktur Jenderal Industri Agro dan Kimia - Kementerian Perindustrian
Republik Indonesia “DJIAK-Menperin” menanda- tangani nota kesepahaman mengenai Model Project
for Waste Heat Recovery Power Generation in the Cement Industry
“WHRPG” dengan The New Energy and Industrial Technology Development
Organization , Jepang “NEDO”. Pada proyek ini,
peralatan pihak NEDO dipasang pada fasilitas pabrik SP dan SP berkewajiban menyediakan
infrastruktur dan peralatan pendukung dari proyek tersebut. Sampai dengan tanggal 30 September
2015 SP telah mengeluarkan dana sebesar Rp89.216.346 untuk infrastruktur dan peralatan
pendukung yang dicatat sebagai aset tetap Catatan 48.3.
On January 15, 2009 the Director General of Agro and Chemical Industry - Ministry of Industry of the
Republic of Indonesia DJIAK-Menperin signed a memorandum of understanding regarding the
Model Project for Waste Heat Recovery Power Generation in the Cement Industry WHRPG
with The New Energy and Industrial Technology Development Organization, Japan NEDO. On
this project, NEDO’s equipments are installed on SP’s plant facilities and SP shall provide the
infrastructure and support equipment of the project. Through September 30, 2015, SP has spent of
Rp89,216,346 for the infrastructure and support equipment that are recorded as fixed assets
Note 48.3.
DAN ENTITAS ANAK CATATAN ATAS LAPORAN KEUANGAN
KONSOLIDASIAN UNTUK PERIODE YANG BERAKHIR PADA
30 SEPTEMBER 2015 Disajikan dalam ribuan Rupiah,
kecuali dinyatakan lain Lanjutan PT SEMEN INDONESIA PERSERO Tbk
AND ITS SUBSIDIARIES NOTES TO THE CONSOLIDATED
FINANCIAL STATEMENTS FOR THE PERIOD ENDED
SEPTEMBER 30, 2015 Expressed in thousands of Rupiah,
unless otherwise stated Continued
- 67 - Proyek tersebut telah dapat beroperasi dan telah
diresmikan oleh Menteri Perindustrian Republik Indonesia dan perwakilan dari NEDO pada tanggal
26 Oktober 2011. The project has been operating and was
inaugurated by the Minister of Industry of the Republic of Indonesia and a representative from
NEDO on October 26, 2011. Pada tanggal 2 Januari 2013, Kementerian
Perindustrian Republik Indonesia melalui Direktur Jenderal Basis Industri Manufaktur menyerahkan
penggunaan dan pemanfaatan mesin dan peralatan Waste Heat Recovery Power Generation kepada
SP. On January 2, 2013, Ministry of Industry of the
Republic of Indonesia through the Director General of Basic Manufacturing Industry passes the
operation and utilization of Waste Heat Recovery Power Generation equipment to the SP.
Pada tanggal 30 September 2015 dan 31 Desember 2014, seluruh aset tetap dan properti investasi,
kecuali tanah, telah diasuransikan dengan jumlah pertanggungan
masing-masing sebesar
Rp40.969.364.509 dan Rp39.267.784.936. On September 30, 2015 and December 31, 2014,
all of fixed assets and investment properties, excluding land, were insured with total coverage of
Rp40.969.364.509 and
Rp39,267,784,936, respectively.
Manajemen Grup berpendapat bahwa jumlah pertanggungan asuransi tersebut memadai untuk
menutup kemungkinan kerugian atas aset yang dipertanggungkan.
Management of the Group believes that the insurance coverage is adequate to cover possible
losses on the assets insured.
16. BEBAN TANGGUHAN 16. DEFERRED CHARGES
30 September 31 Desember
September 30, December 31,
2015 2014
Unaudited Unaudited
Sewa jangka panjang 102.995.533
82.809.678 Long-term prepaid rent
Instalasi listrik dan telepon 25.340.595
25.340.595 Telephone and electrical installation
Pengurusan hak atas tanah 4.673.150
- Land rights processing
Lain-lain 26.761.147
31.553.362 Others
159.770.425 139.703.635
Akumulasi amortisasi 36.440.038
26.387.018 Accumulated amortization
Jumlah 123.330.387
113.316.617 Total
Sewa jangka panjang merupakan biaya sewa tanah yang diamortisasi selama dua puluh hingga lima
puluh tahun. Long-term prepaid rent represents land rental,
which are amortized over twenty to fifty years.
Biaya instalasi telepon dan listrik diamortisasi selama lima tahun.
The cost of telephone and electrical installations are amortized over five years.
DAN ENTITAS ANAK CATATAN ATAS LAPORAN KEUANGAN
KONSOLIDASIAN UNTUK PERIODE YANG BERAKHIR PADA
30 SEPTEMBER 2015 Disajikan dalam ribuan Rupiah,
kecuali dinyatakan lain Lanjutan PT SEMEN INDONESIA PERSERO Tbk
AND ITS SUBSIDIARIES NOTES TO THE CONSOLIDATED
FINANCIAL STATEMENTS FOR THE PERIOD ENDED
SEPTEMBER 30, 2015 Expressed in thousands of Rupiah,
unless otherwise stated Continued
- 68 - 17. ASET TAKBERWUJUD