Tangki Penyimpanan RBDPs, F-110
30 L-331
1 NI
3,021,781 3,021,781
31 L-341
1 NI
3,019,445 3,019,445
32 L-371
1 NI
2,090,953 2,090,953
Sub Total Non Impor
22,202,343
Total 20,056,373,482
Tabel LE.4 Estimasi Harga Peralatan Utilitas dan Pengolahan Limbah Kode
Unit Ket
Harga Unit Harga Total
SC 1
I 445.013
445.013 CL
1 I
518.105.409 518.105.409
SF 1
I 358.384.235
358.384.235 CE
1 I
119.158.542 119.158.542
AE 1
I 119.158.542
119.158.542 DE
1 I
475.590.868 475.590.868
TU-01 1
I 424.309.108
424.309.108 TU-02
1 I
442.694.108 442.694.108
TP-01 1
I 19.948.543
19.948.543 TP-02
1 I
14.256.136 14.256.136
TP-03 1
I 284.847.960
284.847.960 TP-04
1 I
87.716.264 87.716.264
TP-05 1
I 6.158.717
6.158.717 KU-01
1 I
209.227.943 209.227.943
TB-01 1
I 2.128.842.311
2.128.842.311 TB-02
1 I
670.623.538 670.623.538
UR-01 1
I 414.797.473
414.797.473 A.Sludge
1 I
731.730.169 731.730.169
TS 1
I 43.884.020
43.884.020 Sub Total Impor
7.069.878.900 BS
1 NI
10.000.000 10.000.000
PU-01 1
NI 2.409.034
2.409.034 PU-02
1 NI
2.409.034 2.409.034
PU-03 1
NI 2.409.034
2.409.034 PU-04
1 NI
2.409.034 2.409.034
PU-05 1
NI 2.086.061
2.086.061 PU-06
1 NI
118.149 118.149
PU-07 1
NI 2.086.061
2.086.061 PU-08
1 NI
2.086.061 2.086.061
PU-09 1
NI 1.064.634
1.064.634
PU-10 1
NI 1.562.529
1.562.529 PU-11
1 NI
1.562.529 1.562.529
PU-12 1
NI 2.703.404
2.703.404 PU-13
1 NI
3.548.029 3.548.029
PU-14 1
NI 21.340
21.340 PU-15
1 NI
82.699 82.699
PU-16 1
NI 68.081
68.081 PU-17
1 NI
127.726 127.726
PU-18 1
NI 813.103
813.103 PU-19
1 NI
1.587023 1.587023
Tabel LE.4 Estimasi Harga Peralatan Utilitas dan Pengolahan Limbah Lanjutan BP
1 NI
25.000.000 25.000.000
BSA 1
NI 15.000.000
15.000.000 BN
1 NI
15.000.000 15.000.000
PL-01 1
NI 29.966.312
29.966.312 PL-02
1 NI
29.966.312 29.966.312
PL-03 1
NI 29.966.312
29.966.312 PL-04
1 NI
29.966.312 29.966.312
PL-05 1
NI 29.966.312
29.966.312 Generator
2 NI
90.000.000 180.000.000
Sub Total Non Impor 423.985.127
Total 7.493.864.027
Keterangan : I untuk peralatan impor, sedangkan NI untuk peralatan non impor.
Total harga peralatan tiba di lokasi pabrik purchased-equipment delivered adalah: = 1,43 x Rp 20.034.171.139 + Rp 7.069.878.900 +
1,21 x Rp 22.202.343 + Rp 423.985.126
= Rp 39.298.678.396,- Biaya pemasangan diperkirakan 39 dari total harga peralatan Peters et.al., 2004.
Biaya pemasangan = 0,39 Rp 39.298.678.396,- = Rp 15.326.484.574,-
Harga peralatan + biaya pemasangan C : = Rp 39.298.678.396,- + Rp 15.326.484.574,-
= Rp 54.625.162.970,- 1.1.4
Instrumentasi dan Alat Kontrol Diperkirakan biaya instrumentasi dan alat kontrol 26 dari total harga peralatan
Peters et,al., 2004. Biaya instrumentasi dan alat kontrol D = 0,26 Rp 39.298.678.396,-
= Rp 10.217.656.383,- 1.1.5
Biaya Perpipaan Diperkirakan biaya perpipaan 31 dari total harga peralatan Peters et,al., 2004.
Biaya perpipaan E = 0,31Rp 39.298.678.396,- = Rp 12.182.590.303,-
1.1.6 Biaya Instalasi Listrik
Diperkirakan biaya instalasi listrik 10 dari total harga peralatan Peters et,al., 2004.
Biaya instalasi listrik F = 0,1 Rp 39.298.678.396,- = Rp 3.929.867.840,-
1.1.7 Biaya Insulasi
Diperkirakan biaya insulasi 9 dari total harga peralatan Peters et,al., 2004. Biaya insulasi G = 0,09 Rp 39.298.678.396,-
= Rp 3.536.881.056,-
1.1.8 Biaya Inventaris Kantor
Diperkirakan biaya inventaris kantor 5 dari total harga peralatan Peters et,al., 2004. Biaya inventaris kantor H = 0,05 Rp 39.298.678.396,-
= Rp 1.964.933.920,-
1.1.9 Biaya Perlengkapan Kebakaran dan Keamanan
Diperkirakan biaya perlengkapan kebakaran dan keamanan 1 dari total harga peralatan Peters et,al., 2004.
Biaya perlengkapan kebakaran dan keamanan I = 0,01 Rp 39.298.678.396,- = Rp 392.986.784,-
1.1.10 Sarana Transportasi J Tabel LE.5 Biaya Sarana Transportasi
No Jenis Kenderaan
Unit Tipe
Hargaunit Total
1 Dewan Komisaris
3 Fortuner
410.600.000 1.231.800.000
2 Direktur
1 Pajero
361.000.000 361.000.000
3 Manajer
4 Strada
266.000.000 1.064.000.000
4 Bus Karyawan
2 Bus
150.000.000 300.000.000
5 Truk
4 Truk
200.000.000 800.000.000
6 Mobil Tangki
4 Truck Tangki
244.800.000 979.200.000
7 Mobil Pemasaran
3 Pick up
140.000.000 420.000.000
8 Mobil Pemadam Kebakaran
2 Fire Truck
749.000.000 1.498.000.000
Total 6.654.000.000
www.oto.co.id
Total MITL = A + B + C + D + E + F + G + H + I + J
= Rp 120.005.329.254,-
1.2 Modal Investasi Tetap Tak Langsung MITTL 1.2.1
Pra Investasi
Diperkirakan 7 dari total harga peralatan Peters et,al., 2004. Pra Investasi A = 0,07 x Rp 39.298.678.396,- = Rp 2.750.907.488,-