Biaya Dibayar Dimuka dan Uang Muka Prepaid Expenses and Advances
PT Vale Indonesia Tbk sebelumnya PT International Nickel Indonesia Tbk PT Vale Indonesia Tbk formerly PT International Nickel Indonesia Tbk
30 September 2012 dan 2011 dan 31 Desember 2011 September 30, 2012 and 2011 and December 31, 2011
28
10. Aset Tetap 10. Property, Plant and Equipment
1 Januari Penambahan Transfer Pengurangan
30 September January 1, 2012
Additions Transfers
Disposals September 30, 2012 Dalam ribuan Dolar AS
US Dollars, in thousands
Harga perolehan Cost
Bangunan bendungan dan Hydroelectric dam buildings and
fasilitas PLTA
895,198 – 29,134 – 924,332
facilities
Jalan dan jembatan 35,074 – – –
35,074 Roads and bridges
Bangunan 577,314 –
613 – 577,927 Buildings
Pabrik dan mesin 1,185,121 –
15,984 – 1,201,105 Plant and machinery
Perabotan dan peralatan kantor 32,579 – – –
32,579 Furniture and office equipment
Pengembangan tambang 24,703 – 7 –
24,710 Mine development
Aset tetap dalam penyelesaian 205,236 102,001
45,738 –
261,499 Construction in progress
Jumlah
2,955,225 102,001 – – 3,057,226
Total
Akumulasi
penyusutan Accumulated
depreciation Bangunan bendungan dan
Hydroelectric dam buildings fasilitas
PLTA 215,328
18,818 – – 234,146 and
facilities Jalan dan jembatan
14,816 1,500 – – 16,316
Roads and bridges Bangunan
379,230 10,960 – – 390,190 Buildings
Pabrik dan mesin 725,270
42,924 – – 768,194 Plant and
machinery Perabotan dan peralatan kantor
32,181 159 – – 32,340
Furniture and office equipment Pengembangan tambang
9,049 871 – –
9,920 Mine development
Jumlah
1,375,874 75,232 – –
1,451,106 Total
Nilai buku bersih
1,579,351 1,606,120
Net book value
1 Januari Penambahan Transfer Pengurangan
31 Desember January 1, 2011
Additions Transfers
Disposals December 31, 2011 Dalam ribuan Dolar AS
US Dollars, in thousands Harga perolehan
Cost Bangunan bendungan dan
Hydroelectric dam buildings and fasilitas
PLTA 420,275 –
474,923 – 895,198 facilities
Jalan dan jembatan 32,713
– 2,361
– 35,074
Roads and bridges Bangunan
579,653 – 2,339 – 577,314
Buildings Pabrik dan mesin
1,222,500 –
35,462 1,917
1,185,121 Plant and machinery
Perabotan dan peralatan kantor 32,579
– –
– 32,579
Furniture and office equipment Pengembangan
tambang 29,175 –
4,472 – 24,703
Mine development
Aset tetap dalam penyelesaian 430,845
209,402 435,011
– 205,236
Construction in progress Jumlah
2,747,740 209,402
– 1,917
2,955,225 Total
Akumulasi penyusutan
Accumulated depreciation
Bangunan bendungan dan Hydroelectric dam buildings
fasilitas PLTA
176,930 38,398 – – 215,328
and facilities
Jalan dan jembatan 12,843
1,973 –
– 14,816
Roads and bridges Bangunan
367,696 11,534 – – 379,230
Buildings Pabrik dan mesin
686,426 40,526
– 1,682
725,270 Plant and machinery
Perabotan dan peralatan kantor 31,428
753 –
– 32,181
Furniture and office equipment Pengembangan
tambang 7,909
1,140 – – 9,049
Mine development
Jumlah 1,283,232
94,324 –
1,682 1,375,874
Total Nilai
buku bersih
1,464,508 1,579,351
Net book
value Lihat Catatan 11 untuk rincian aset tetap dalam penyelesaian.
Refer to Note 11 for details of construction in progress. Seluruh biaya penyusutan untuk periode-periode yang berakhir pada
tanggal 30 September 2012 dan 31 Desember 2011 dibebankan ke biaya produksi.
All depreciation expenses for the periods ended September 30, 2012 and December 31, 2011 were allocated to production costs.
PT Vale Indonesia Tbk sebelumnya PT International Nickel Indonesia Tbk PT Vale Indonesia Tbk formerly PT International Nickel Indonesia Tbk
30 September 2012 dan 2011 dan 31 Desember 2011 September 30, 2012 and 2011 and December 31, 2011
29
10. Aset Tetap lanjutan 10. Property, Plant and Equipment continued