Monitoring Report of the LARAP Package No. 7
12. Monitoring Report of the LARAP Package No. 12
: Kambang - Indrapura Province : Sumatera Barat A. Previous Status : • LARAP documents approved by World Bank on October 14, 2014. • Signed Action Plan of LARAP was given No Objection Letter NOL by the World Bank. • Monitoring Report for compensation payment of 216 PAPs submitted to WB on May 26, 2016. B. Pending Issues, Concern and Actions a PPKSatker PJN II West Sumatera continue the appraisal and payment processing of the remaining PAP. C. Update during this reporting month of October 2016 a Currently there are 28 Km out of the total length of 56 Km, that land aquisition is not needed. b Monitoring Report for compensation payment progress of 60 PAPs is under submission to WB from PMU. c Total PAP = 2,337; Compensated = 601; Percent complete = 25.7.13. Monitoring Report of the LARAP Package No. 13
: Sp. Rukis Tj. Kemuning Province : Bengkulu A. Previous Status : • World Bank issued on May 30, 2014 a No Objection Letter NOL on the revised LARAP documents for implementation. • Signed Action Plan of LARAP was given No Objection Letter NOL by the World Bank. • World Bank issued on August 18, 2015 No Objection Letter NOL on the monitoring Report No.1. • World Bank issued on October 13, 2015 No Objection Letter NOL on the monitoring Report No.2. • Monitoring Report No.3 for compensation payments of 193 PAPs in Kab. Kaur submitted to WB which was submitted on February 23, 2016 has been issued by the Bank the NOL on March 8, 2016. • Monitoring Report No.4 for compensation payments of 188 PAPs in Kab. Kaur submitted to WB which was submitted on October 6, 2016 B. Pending Issues, Concern and Actions a Compensation payments for the remaining 2,295 PAPs being done by Satker C. Update during this reporting month of October 2016 a DIPA 2016 amounting to RP. 10 Billion was ready b Total PAP = 3,198; Compensated = 903; Percent complete = 28.3. c Monitoring Report of the payments progress for 333 PAPs is under submission to WB d The payment for about 2,329 affected persons APs wil complete in the end of this year will complete and the remaining Aps will be continued in FY2017. The budget needed for the FY2017 payment is around 4.5 billion IDR.Parts
» WINRIP DOC MPR CTC MPR No.46 2016 10 20161031 00435
» Current Implementation Situation Civil Works
» Disbursement WINRIP DOC MPR CTC MPR No.46 2016 10 20161031 00435
» World Bank Implementation Review Mission and Site Visit
» Package No.10 Sp. Empat Sp. Air Balam AWP-2
» Background WINRIP DOC MPR CTC MPR No.46 2016 10 20161031 00435
» Project Development WINRIP DOC MPR CTC MPR No.46 2016 10 20161031 00435
» Project Objective WINRIP DOC MPR CTC MPR No.46 2016 10 20161031 00435
» CTC Consultants WINRIP DOC MPR CTC MPR No.46 2016 10 20161031 00435
» 73.84 WINRIP DOC MPR CTC MPR No.46 2016 10 20161031 00435
» DSC Consultants WINRIP DOC MPR CTC MPR No.46 2016 10 20161031 00435
» Technical Assistance for Development of Slope Stabilization, Design and
» Detailed Design Preparation WINRIP DOC MPR CTC MPR No.46 2016 10 20161031 00435
» Procurements WINRIP DOC MPR CTC MPR No.46 2016 10 20161031 00435
» Civil Works Implementation WINRIP DOC MPR CTC MPR No.46 2016 10 20161031 00435
» Civil Works Progress WINRIP DOC MPR CTC MPR No.46 2016 10 20161031 00435
» 35.23 WINRIP DOC MPR CTC MPR No.46 2016 10 20161031 00435
» 74.87 WINRIP DOC MPR CTC MPR No.46 2016 10 20161031 00435
» 23.49 WINRIP DOC MPR CTC MPR No.46 2016 10 20161031 00435
» 18.79 WINRIP DOC MPR CTC MPR No.46 2016 10 20161031 00435
» 34.26 74.78 1.97 WINRIP DOC MPR CTC MPR No.46 2016 10 20161031 00435
» 19.25 WINRIP DOC MPR CTC MPR No.46 2016 10 20161031 00435
» 17.28 WINRIP DOC MPR CTC MPR No.46 2016 10 20161031 00435
» 12.04 33.32 WINRIP DOC MPR CTC MPR No.46 2016 10 20161031 00435
» 1.94 WINRIP DOC MPR CTC MPR No.46 2016 10 20161031 00435
» Quality Assurance WINRIP DOC MPR CTC MPR No.46 2016 10 20161031 00435
» Environmental Quarterly Report Environmental and Social Considerations
» Monitoring Report of the LARAP Package No. 1
» Monitoring Report of the LARAP Package No. 2
» Monitoring Report of the LARAP Package No. 3
» Monitoring Report of the LARAP Package No. 4 Monitoring Report of the LARAP Package No. 5
» Monitoring Report of the LARAP Package No. 6
» Monitoring Report of the LARAP Package No. 7
» Monitoring Report of the LARAP Package No. 8
» Monitoring Report of the LARAP Package No. 9
» Monitoring Report of the LARAP Package No. 10
» Monitoring Report of the LARAP Package No. 11
» Monitoring Report of the LARAP Package No. 12
» Monitoring Report of the LARAP Package No. 13
» Monitoring Report of the LARAP Package No.16
» Monitoring Report of the LARAP Package No.17
» Monitoring Report of the LARAP Package No.18
» Monitoring Report of the LARAP Package No.19
» Monitoring Report of the LARAP Package No. 20
» Monitoring Report of the LARAP Package No. 21
» Anti Corruption Issues WINRIP DOC MPR CTC MPR No.46 2016 10 20161031 00435
» Road Safety Audit WINRIP DOC MPR CTC MPR No.46 2016 10 20161031 00435
» Letter Database System, used to record all information of incoming and
» Document Library System, used to record all information of document and
» Implementation Support Components WINRIP DOC MPR CTC MPR No.46 2016 10 20161031 00435
» Road Safety Audit Management Information System
» Project Risks and Mitigation Measures
» Krui-Biha 08-Jan-14 Actions Required
» Pd. Sawah-Sp. Empat 06-Jan-14
» Manggopoh-Pd. Sawah 06-Jan-14 Actions Required
» Ipuh-Bantal 10-Jan-14 Actions Required
» Sp. Rampa - Poriaha 18-Jun-15
» Ps Pedati - Kerkap 11-Mar-15
» Bts. Kt Pariaman - Manggopoh 23-Mar-16
» R. Tijang - Kt. Agung Cancelled
» Sp Empat - Sp Air Balam Propose to be Cancelled
» Kambang - Indrapura 23-Mei-16
» Sp. Rukis - Tj. Kemuning 22-Jul-15
» Painan -Kambang 03-Agust-16 Actions Required
» Sibolga - Bts Tap Sel 20-Nop-15
» Sp. Gunung Kemala - Pg. Tampak
» Mukomuko - Bts. Sumbar Cancelled
» Lais- Bintunan 11-Mar-15 Actions Required
» Lubuk Alung - Sicincin PT. Nindya Karya
Show more