Monitoring Report of the LARAP Package No. 4 Monitoring Report of the LARAP Package No. 5
9. Monitoring Report of the LARAP Package No. 9
: Rantau Tijang Kota Agung Province : Lampung Cancelled from the WINRIP Program.10. Monitoring Report of the LARAP Package No. 10
: Sp. Empat Sp. Air Balam Province : Sumatera Barat A. Previous Status : • LARAP documents submitted to World Bank on August 7, 2014. • LARAP documents approved by World Bank on August 12, 2014. • Monitoring Report for payment of 1,421 PAPs has been submitted to World Bank on January 14, 2016 and Bank issued No Objection Letter NOL on March 8, 2016. B. Pending Issues, Concern and Actions a Payments for the remaining 1,190 PAPs not yet paid by Satker PJN I West Sumatera and Local Government. C. Update during this reporting month of October 2016 a Monitoring Report for payment of 138 PAPs on-going preparation by Satker PJN I Sumatera Barat. b PPKSatker PJN I West Sumatera and Local Government continue the appraisal and payment processing of the remaining PAP. c Total PAP = 2,915; Compensated = 1,725; Percent complete = 59.18.11. Monitoring Report of the LARAP Package No. 11
: Bantal - Mukomuko Province : Bengkulu A. Previous Status : • World Bank issued on May 30, 2014 a No Objection Letter NOL on the revised LARAP documents for implementation. • Monitoring Report No.1 and No.2 were issued No Objection Letters NOL from the World Bank. • Monitoring Report for 15 of the remaining 123 PAPs was given No Objection Letter NOL on November 26, 2015 B. Pending Issues, Concern and Actions a No more issue. C. Update during this reporting month of October 2016 a A monitoring report of the payment progress for the remaining 89 PAPs already submitted to WB from PMU. b Total PAP = 243 updated; Compensated = 243; Percent complete =100.Parts
» WINRIP DOC MPR CTC MPR No.46 2016 10 20161031 00435
» Current Implementation Situation Civil Works
» Disbursement WINRIP DOC MPR CTC MPR No.46 2016 10 20161031 00435
» World Bank Implementation Review Mission and Site Visit
» Package No.10 Sp. Empat Sp. Air Balam AWP-2
» Background WINRIP DOC MPR CTC MPR No.46 2016 10 20161031 00435
» Project Development WINRIP DOC MPR CTC MPR No.46 2016 10 20161031 00435
» Project Objective WINRIP DOC MPR CTC MPR No.46 2016 10 20161031 00435
» CTC Consultants WINRIP DOC MPR CTC MPR No.46 2016 10 20161031 00435
» 73.84 WINRIP DOC MPR CTC MPR No.46 2016 10 20161031 00435
» DSC Consultants WINRIP DOC MPR CTC MPR No.46 2016 10 20161031 00435
» Technical Assistance for Development of Slope Stabilization, Design and
» Detailed Design Preparation WINRIP DOC MPR CTC MPR No.46 2016 10 20161031 00435
» Procurements WINRIP DOC MPR CTC MPR No.46 2016 10 20161031 00435
» Civil Works Implementation WINRIP DOC MPR CTC MPR No.46 2016 10 20161031 00435
» Civil Works Progress WINRIP DOC MPR CTC MPR No.46 2016 10 20161031 00435
» 35.23 WINRIP DOC MPR CTC MPR No.46 2016 10 20161031 00435
» 74.87 WINRIP DOC MPR CTC MPR No.46 2016 10 20161031 00435
» 23.49 WINRIP DOC MPR CTC MPR No.46 2016 10 20161031 00435
» 18.79 WINRIP DOC MPR CTC MPR No.46 2016 10 20161031 00435
» 34.26 74.78 1.97 WINRIP DOC MPR CTC MPR No.46 2016 10 20161031 00435
» 19.25 WINRIP DOC MPR CTC MPR No.46 2016 10 20161031 00435
» 17.28 WINRIP DOC MPR CTC MPR No.46 2016 10 20161031 00435
» 12.04 33.32 WINRIP DOC MPR CTC MPR No.46 2016 10 20161031 00435
» 1.94 WINRIP DOC MPR CTC MPR No.46 2016 10 20161031 00435
» Quality Assurance WINRIP DOC MPR CTC MPR No.46 2016 10 20161031 00435
» Environmental Quarterly Report Environmental and Social Considerations
» Monitoring Report of the LARAP Package No. 1
» Monitoring Report of the LARAP Package No. 2
» Monitoring Report of the LARAP Package No. 3
» Monitoring Report of the LARAP Package No. 4 Monitoring Report of the LARAP Package No. 5
» Monitoring Report of the LARAP Package No. 6
» Monitoring Report of the LARAP Package No. 7
» Monitoring Report of the LARAP Package No. 8
» Monitoring Report of the LARAP Package No. 9
» Monitoring Report of the LARAP Package No. 10
» Monitoring Report of the LARAP Package No. 11
» Monitoring Report of the LARAP Package No. 12
» Monitoring Report of the LARAP Package No. 13
» Monitoring Report of the LARAP Package No.16
» Monitoring Report of the LARAP Package No.17
» Monitoring Report of the LARAP Package No.18
» Monitoring Report of the LARAP Package No.19
» Monitoring Report of the LARAP Package No. 20
» Monitoring Report of the LARAP Package No. 21
» Anti Corruption Issues WINRIP DOC MPR CTC MPR No.46 2016 10 20161031 00435
» Road Safety Audit WINRIP DOC MPR CTC MPR No.46 2016 10 20161031 00435
» Letter Database System, used to record all information of incoming and
» Document Library System, used to record all information of document and
» Implementation Support Components WINRIP DOC MPR CTC MPR No.46 2016 10 20161031 00435
» Road Safety Audit Management Information System
» Project Risks and Mitigation Measures
» Krui-Biha 08-Jan-14 Actions Required
» Pd. Sawah-Sp. Empat 06-Jan-14
» Manggopoh-Pd. Sawah 06-Jan-14 Actions Required
» Ipuh-Bantal 10-Jan-14 Actions Required
» Sp. Rampa - Poriaha 18-Jun-15
» Ps Pedati - Kerkap 11-Mar-15
» Bts. Kt Pariaman - Manggopoh 23-Mar-16
» R. Tijang - Kt. Agung Cancelled
» Sp Empat - Sp Air Balam Propose to be Cancelled
» Kambang - Indrapura 23-Mei-16
» Sp. Rukis - Tj. Kemuning 22-Jul-15
» Painan -Kambang 03-Agust-16 Actions Required
» Sibolga - Bts Tap Sel 20-Nop-15
» Sp. Gunung Kemala - Pg. Tampak
» Mukomuko - Bts. Sumbar Cancelled
» Lais- Bintunan 11-Mar-15 Actions Required
» Lubuk Alung - Sicincin PT. Nindya Karya
Show more