Sp. Rampa - Poriaha 18-Jun-15

Appendix B. Road Safety Audit Progresss October 2016 Old 2004 New 2009 Site Visiting Submission of Report Site Visiting Submission of Report Site Visiting Submission of Report 1. No Road Safety Audit at Design Stage. 2. Road Safety Engineering Review by CTC, Dec, 2014 3. RSA at Construction StageMonitoring of Traffic Mgmt Safety by CTC, Dec, 2014 Date 13-Nop-14 29-Des-14 13-Nop-14 29-Des-14 11-Feb-16 22-Feb-16 4. RSA at PHO stage by CTC, February, 2016 1. No Road Safety Audit at Design Stage. 2. Road Safety Engineering Review by CTC, Nov, 2014 3. RSA at Construction StageMonitoring of Traffic Mgmt Safety by CTC, Nov, 2014 Date 09-Okt-14 05-Nop-14 09-Okt-14 05-Nop-14 06-Apr-16 12-Apr-16 4. RSA at PHO stage by CTC, April, 2016 1. No Road Safety Audit at Design Stage. 2. Road Safety Engineering Review by CTC 3. RSA at Construction StageMonitoring of Traffic Mgmt Safety by CTC, Nov, 2014 Date 09-Okt-14 05-Nop-14 09-Okt-14 05-Nop-14 17-Mar-16 23-Mar-16 4. RSA at PHO stage by CTC, March, 2016 1. No Road Safety Audit at Design Stage. 2. Road Safety Engineering Review by CTC 3. RSA at Construction StageMonitoring of Traffic Mgmt Safety by CTC, Dec, 2014 Date 13-Nop-14 29-Des-14 13-Nop-14 29-Des-14 14-Apr-16 26-Apr-16 4. RSA at PHO stage by CTC, April, 2016 1. Technical Advisory Report by International RSA CTC, Sept 2013 Date 08-May-13 17-Sep-13 1. Technical Review RSA at Design Stage done by International RSA CTC 3. RSA at Construction StageMonitoring of Traffic Mgmt Safety by CTC, Sep, 2015 Date 18-Jul-13 17-Sep-13 25-Agust-15 08-Sep-15 1. Technical Advisory Report by International RSA CTC, Sept 2013 27-Sep-13 2. Road Safety Audit by Dit. EA RS, May 2014 3. Result of Highway and RSA Final DED Review by CTC, Nov 2014 Date Apr-14 Mei-14 1. Technical Advisory Report by CTC, Sept 2013 27-Sep-13 2. Road Safety Audit by Dit. EA RS, May 2014 3. Result of Highway and RSA Final DED Review by CTC, Nov 2014 Date Apr-14 Mei-14 1. Technical Advisory Report by CTC, Sept 2013 27-Sep-13 2. Road Safety Audit by Dit. EA RS, May 2014 3. Result of Highway and RSA Final DED Review by CTC, Nov 2014 Date Apr-14 Mei-14 1. Technical Review RSA at Design Stage by International RSA CTC , Jul, 2013 2. RSA at Construction StageMonitoring of Traffic Mgmt Safety by CTC, Dec, 2015 Date 18-Jul-13 18-Jul-13 17-Des-15 29-Des-15 1. Technical Advisory Report by International RSA CTC, Sept 2013 27-Sep-13 2. Road Safety Audit by Dit. EA RS, May 2014 3. Result of Highway and RSA Final DED Review by CTC, Nov 2014 Date Apr-14 Mei-14 1. Technical Advisory Report by International RSA CTC, Sept 2013 Date 18-Jul-13 18-Jul-13 1. RSA DED Report by CTC, June, 2015 Date 15-Apr-15 15-Jun-15 1. Technical Advisory Report by International RSA CTC, Sept 2013 Date 08-May-13 21-Aug-13 23-Sep-13 1. RSA DED Report by CTC, Sept, 2014 Date 14-Agust-14 01-Sep-14 Date 6 255.269 Process No Road Safety Audit at Design Stage 6 110.237 Process 33 16 17 Sp.Gng Kemala–Pg.Tampak 17.061.1 17.025.0 36.80 15 16 Seblat – Ipuh 13.010.0 13.004.0 34.50 13.006.0 13.021.0 56.30 35.86 7 376.479 Process 33 31.50 7 118.993 Process 33 6 262.611 Process 66 50.10 14 15 Sibolga – Bts TapSel 03.016.1 03.044.0 7 316.304,8 Process 33 13 14 Painan – Kambang 06.017.1 06.032.0 12 13 SP.Rukis - TJ.Kemuning Process 33 46.80 7 374.647 Process 33 11 12 Kambang – Indrapura 06.17.2 06.033.0 10 11 Bantal - Mukomuko 13.015.2 13.002.0 45.20 7 438.675 Process 33 9 10 Sp.Empat – Sp. Air Balam 06.034.1 06.020.0 7 175.812 Process 33 8 8 Bts.Pariaman – Manggopoh 06.24.0

06.23.0 7

7 Indrapura – Tapan 06.019.0 06.34.0 19.50 61.70 7 511.375 20.88 7 92.127 Process 66 6 152.870 Process 33 9.7 6 6 PS.Pedati - Kerkap 13.010.0 13.009.0 5 5 Sp.Rampa – Poriaha xx.xxx.x 03.075.0 42.40 7 247.105 Process 100 7 167.678 Process 100 32.00 4 4 Ipuh - Bantal 13.051.1 13.003 3 3 Manggopoh -Padangsawah 06.047.1 06.022.0 40.90 7 228.772 Process 100 7 163.535 Process 100 25.00 2 2 Padangsawah - Simpangempat 06.047.2 06.021.0 1 1 Biha - Krui 17.053.0 17.027.0 Estimated Cost Excl.VAT mil. RP Road Safety Audit Total Process Remarks Status Design Stage Construction Stage PHO Stage No Pkg No. Name of Sub-project Link No Length km Width m