Monitoring Report of the LARAP Package No. 1
7. Monitoring Report of the LARAP Package No. 7
: Indrapura - Tapan Province : Sumatera Barat A. Previous Status : • LARAP documents approved by World Bank on October 14, 2014. • Implementation action plan of the LARAP was issued No Objection Letter NOL on March 17, 2015 by the World Bank. • A report of the compensation payment for 276 from total 861 PAPs already submitted to World Bank on February 9, 2016 and no objection letter NOL was issued on March 16, 2016. • Monitoring Report No. 2 for the compensation payments of 207 PAPs submitted to WB on July 21, 2016. B. Pending Issues, Concern and Actions a Compensation payment for 78 from the remaining PAPs is under payment preparation by PPKSatker PJN II West Sumatera. C. Update during this reporting month of October 2016 a A monitoring report of the payment progress for 89 from the 378 PAPs is under submission to WB from PMU. b Total PAP = 861; Compensated = 783; Percent Complete = 90.94.8. Monitoring Report of the LARAP Package No. 8
: Bts. Pariaman - Manggopoh Province : Sumatera Barat A. Previous Status : • LARAP documents submitted to World Bank on August 7, 2014. • LARAP documents approved by World Bank on August 12, 2014. • Monitoring Report for the payment of 840 PAPs has been submitted to World Bank on January 14, 2016 and No Objection Letter NOL issued on March 8, 2016. • Monitoring Report for compensation payment of 926 PAPs submitted to WB on May 9, 2016. B. Pending Issues, Concern and Actions a A monitoring report of the payment progress for 350 from the remaining of 400 PAPs is under preparation SatkerCTC b Compensation payment for the remaining 50 PAPs not yet paid by PPKSatker PJN I West Sumatera and Local Government. C. Update during this reporting month October 2016Parts
» WINRIP DOC MPR CTC MPR No.46 2016 10 20161031 00435
» Current Implementation Situation Civil Works
» Disbursement WINRIP DOC MPR CTC MPR No.46 2016 10 20161031 00435
» World Bank Implementation Review Mission and Site Visit
» Package No.10 Sp. Empat Sp. Air Balam AWP-2
» Background WINRIP DOC MPR CTC MPR No.46 2016 10 20161031 00435
» Project Development WINRIP DOC MPR CTC MPR No.46 2016 10 20161031 00435
» Project Objective WINRIP DOC MPR CTC MPR No.46 2016 10 20161031 00435
» CTC Consultants WINRIP DOC MPR CTC MPR No.46 2016 10 20161031 00435
» 73.84 WINRIP DOC MPR CTC MPR No.46 2016 10 20161031 00435
» DSC Consultants WINRIP DOC MPR CTC MPR No.46 2016 10 20161031 00435
» Technical Assistance for Development of Slope Stabilization, Design and
» Detailed Design Preparation WINRIP DOC MPR CTC MPR No.46 2016 10 20161031 00435
» Procurements WINRIP DOC MPR CTC MPR No.46 2016 10 20161031 00435
» Civil Works Implementation WINRIP DOC MPR CTC MPR No.46 2016 10 20161031 00435
» Civil Works Progress WINRIP DOC MPR CTC MPR No.46 2016 10 20161031 00435
» 35.23 WINRIP DOC MPR CTC MPR No.46 2016 10 20161031 00435
» 74.87 WINRIP DOC MPR CTC MPR No.46 2016 10 20161031 00435
» 23.49 WINRIP DOC MPR CTC MPR No.46 2016 10 20161031 00435
» 18.79 WINRIP DOC MPR CTC MPR No.46 2016 10 20161031 00435
» 34.26 74.78 1.97 WINRIP DOC MPR CTC MPR No.46 2016 10 20161031 00435
» 19.25 WINRIP DOC MPR CTC MPR No.46 2016 10 20161031 00435
» 17.28 WINRIP DOC MPR CTC MPR No.46 2016 10 20161031 00435
» 12.04 33.32 WINRIP DOC MPR CTC MPR No.46 2016 10 20161031 00435
» 1.94 WINRIP DOC MPR CTC MPR No.46 2016 10 20161031 00435
» Quality Assurance WINRIP DOC MPR CTC MPR No.46 2016 10 20161031 00435
» Environmental Quarterly Report Environmental and Social Considerations
» Monitoring Report of the LARAP Package No. 1
» Monitoring Report of the LARAP Package No. 2
» Monitoring Report of the LARAP Package No. 3
» Monitoring Report of the LARAP Package No. 4 Monitoring Report of the LARAP Package No. 5
» Monitoring Report of the LARAP Package No. 6
» Monitoring Report of the LARAP Package No. 7
» Monitoring Report of the LARAP Package No. 8
» Monitoring Report of the LARAP Package No. 9
» Monitoring Report of the LARAP Package No. 10
» Monitoring Report of the LARAP Package No. 11
» Monitoring Report of the LARAP Package No. 12
» Monitoring Report of the LARAP Package No. 13
» Monitoring Report of the LARAP Package No.16
» Monitoring Report of the LARAP Package No.17
» Monitoring Report of the LARAP Package No.18
» Monitoring Report of the LARAP Package No.19
» Monitoring Report of the LARAP Package No. 20
» Monitoring Report of the LARAP Package No. 21
» Anti Corruption Issues WINRIP DOC MPR CTC MPR No.46 2016 10 20161031 00435
» Road Safety Audit WINRIP DOC MPR CTC MPR No.46 2016 10 20161031 00435
» Letter Database System, used to record all information of incoming and
» Document Library System, used to record all information of document and
» Implementation Support Components WINRIP DOC MPR CTC MPR No.46 2016 10 20161031 00435
» Road Safety Audit Management Information System
» Project Risks and Mitigation Measures
» Krui-Biha 08-Jan-14 Actions Required
» Pd. Sawah-Sp. Empat 06-Jan-14
» Manggopoh-Pd. Sawah 06-Jan-14 Actions Required
» Ipuh-Bantal 10-Jan-14 Actions Required
» Sp. Rampa - Poriaha 18-Jun-15
» Ps Pedati - Kerkap 11-Mar-15
» Bts. Kt Pariaman - Manggopoh 23-Mar-16
» R. Tijang - Kt. Agung Cancelled
» Sp Empat - Sp Air Balam Propose to be Cancelled
» Kambang - Indrapura 23-Mei-16
» Sp. Rukis - Tj. Kemuning 22-Jul-15
» Painan -Kambang 03-Agust-16 Actions Required
» Sibolga - Bts Tap Sel 20-Nop-15
» Sp. Gunung Kemala - Pg. Tampak
» Mukomuko - Bts. Sumbar Cancelled
» Lais- Bintunan 11-Mar-15 Actions Required
» Lubuk Alung - Sicincin PT. Nindya Karya
Show more